• Title/Summary/Keyword: architectural construction cost

Search Result 590, Processing Time 0.023 seconds

TOPSIS-Based Decision-Making Model for Demolition Method Selection

  • Lee, Hyung Yong;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • v.23 no.4
    • /
    • pp.67-73
    • /
    • 2021
  • An efficient demolition process requires the optimum method selection considering stability, economic feasibility, environment, and workability. In reality the construction cost and period are priority concerns, and safe construction methods are neglected. In addition, the choosing demolition method is often determined subjectively by experienced field engineers. This research paper presents a multi-criteria decision-making method using Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) to select the optimum demolition method. Three experienced demolition engineers' opinions were used to develop the TOPSIS model. The case study showed that the preferences of ten attribute measurements for demolition method selection. Authors suggested the most preferable demolition method for the case study project.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

Constitutional Directions of Decision Support System for Cooperative Design in Architectural Design Phase (건축협력설계 의사결정 지원시스템 구축방안)

  • Chun Jae-Youl;Oh Seung-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.91-98
    • /
    • 2003
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. Therefore The final object of this study is to propose the establishment method of decision support model for the cooperative design in order to provides improved design coordination and optimize the building system.

Schematic Estimation Process using Architectural Object BIM Library

  • Lee, Ji Yong;Kim, In Han;Choi, Jung Sik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.289-293
    • /
    • 2015
  • The construction industry has been evolving with the development of information technology. According to this trend, the current industry changes from 2d drawings to Building Information Modeling(BIM). Current studies on the BIM-based estimation have problems such as Quantity Take-Off(QTO) specificity toward a particular software, the uncertainty of the amount in accordance with the model quality. These studies focus on QTO based on BIM rather than schematic estimation. In addition, studies on the connection with the QTO and unit cost for schematic estimation are insufficient. The purpose of this study is to propose schematic estimation process by utilizing construction codes and QTO in architectural object BIM libraries. Construction codes are classified in detail in order to input codes inside each. This study has connected unit cost and construction classification codes that obtain from BIM model. The results of this study will be helpful in decision-making and communication for schematic estimation of the design phase. It will improve the efficiency and reliability problems of existing schematic estimation.

  • PDF

A STUDY ON THE INTRODUCTION OF THE PAY ADJUSTMENT SYSTEM FOR THE VOLUNTARY ASSURANCE OF QUALITY BY THE CONTRACTORS

  • Byung-Ok Noh;Sang-Beom Lee;Jai-Dong Koo
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.521-525
    • /
    • 2011
  • Although the Korean construction industry has risen rapidly, the quality of the buildings is not met with the industry standard compared to the potential of the technology development and the cost of maintenance has been increased. The user's request for quality have been increased, but in the current building construction, the contractors only follow the specifications of design, material and technology, and their main concern is whether they are in right track with the specification or not. Thus, the necessity of developing technology has been ignored and sufficient opportunities for the development have not been provided as well. In the developed countries, in contrast, the quality assurance and the payment regulation system has been utilized for the active response to the changes of users' request. As a result of this, the maintenance cost has been decreased and the development of construction technology has been improved. Therefore the pay adjustment system is needed to create the improvement of the quality of the buildings by the contractors' earnest building construction. In order to introduce the pay adjustment system suitable to the Korean construction industry, this study presented the logical method of adjusting the construction cost and making payment with the pay adjustment index that is created based on the result of the performance test, after making a set of the indicators of the building performance standard and applied them to the targeted building.

  • PDF

Correlation Analysis between Building Damage Cost and Major Factors Affected by Typhoon

  • Yang, Sungpil;Yu, Yeongjin;Kim, Sangho;Son, Kiyoung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.702-703
    • /
    • 2015
  • Currently, according to the climate change, serious damage by Typhoon has been occurred in the world. In this respect, the research on the damage prediction model to minimize the damage from various natural disaster has been conducted in several developed countries. In the case of U.S, various damage prediction models of buildings from natural disasters have been used widely in many organizations such as insurance companies and governments. In South Korea, although studies regarding damage prediction model of hurricane have been conducted, the scope has been only limited to consider the property of hurricane. However, it is necessary to consider various factors such as socio-economic, physical, geographical, and built environmental factors to predict the damages. Therefore, to address this issue, correlation analysis is conducted between various variables based on the data of hurricane from 2003 to 2012. The findings of this study can be utilized to develop for predicting the damage of hurricane on buildings.

  • PDF

Automatic Arrangement Algorithm for Tower Cranes Used in High-rise Apartment Buildings

  • Lim, Chae-Yeon;Kim, Sun-Kuk;Seo, Deok-Seok;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.358-368
    • /
    • 2012
  • On most construction sites, the arrangement of tower cranes is decided by site engineers based on their own experience, which can cause cost overruns and delays in the lifting work. Although many researchers have conducted studies on tower crane arrangement using computer modeling and knowledge-based expert systems as well as mathematical models, no research has aimed to develop an algorithm to identify an optimum solution among several alternatives for installation areas of tower cranes satisfying the conditions of lifting work. The objective of this study is to develop an automatic arrangement algorithm for tower cranes used in high-rise apartment construction. First, as a new concept, a possible installation area of tower cranes was suggested. Second, after proposing several alternatives based on the installation points suggested in this study, an algorithm analyzing the economic feasibility of tower cranes was developed considering the rental, installation and removal costs. Third, a case study was conducted to prove the validity of the developed algorithm for selecting and installing an effective set of tower cranes at minimum cost.

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

Analysis of worker's Ageing in Small-size Construction Sites in Busan (부산지역 소규모 건설현장 근로자의 고령화 실태조사 및 개선방안)

  • Lee, Sang-Ho;Huh, Young-Ki
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.12
    • /
    • pp.51-56
    • /
    • 2018
  • Due to the aging of economically active population in the world, the average age of workers in the domestic construction industry is also steadily increasing. This study analyzes the aging of construction workers in small-size construction sites in Busan, where the aging of the economically active population is the most severe in Korea. As a result of the study on the aging of construction workers in six construction sites with a construction cost of less than 500 million won in Busan, it was found that 65% of the workers were over 50 years of age. In addition, several experts interviews and survey revealed that 'securing welfare facilities for construction workers' and 'diminishing prejudice about the construction industry" were the most urgent and effective methods to overcome the aging problems. The results of this study can be served as basic data to solve the aging problems in the industry.

A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions (경계조건 분석을 통한 LCCBS 연계방안)

  • Jeong, Jae-Hyuk;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.321-332
    • /
    • 2013
  • Costs and expenses are intertwined and incurred throughout an entire construction project, even from the pre-construction phase, and each phase has a different impact on the life cycle cost (LCC). However, the cost breakdown structure (CBS) is different in each phase of a building construction project, which makes it hard to reasonably calculate construction cost. For this reason, the boundary conditions were analyzed in this study based on the life cycle cost break structure (LCCBS). In addition, breakdown factors were analyzed based on the boundary conditions to derive a linkage method. The validity of the linkage method was verified through application to actual construction projects. Through the analysis, it was found that the problem of items being left out was reduced by more than 97.2 percent, and the work was done an average of 6 hours faster compared to the conventional method. It is expected that by applying the new LCC system, LCC will be both reduced and calculated in a more efficient manner.