• Title/Summary/Keyword: architectural construction cost

Search Result 590, Processing Time 0.033 seconds

A Study on Finances and Factors of weighting Cost in Government Constructions in the Late of Chosun Dynasty (조선 후기 관영건축공사(官營建築工事)의 재원과 비용 절감 방안에 관한 연구)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.11 no.3 s.31
    • /
    • pp.53-68
    • /
    • 2002
  • Since the 17th century, the finance for the government construction was demanded unlike the early chosun dynasty. It was consequent upon a transition in the supply method of materials and labors for the construction. The government construction being enforced in chronic financial difficulties had to undergo lack of funds. Especially, a rising construction cost by purchasing lots of materials including wood, and by employing labors weighted the difficulties. In order to put forward a construction, new and various efforts besides diversification in sources of finance ad been looked for. The efforts were driven in three parts which were to be the management of labor and materials, and the way of construction execution. As a result of spending a great effort to save cost, an extinguished improvement in the way of construction execution came out with 'Injungjeon-yeongkweon' in the year 1805.

  • PDF

Investigation of Field Construction and Economic Efficiency for Steel Plate-Concrete Structures with Application of Parking Building

  • Han, Kwon-Gyu;Park, Ho-Young;Han, Kyung-Bo;Choi, Byong-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • The SC structure can have relatively liberal sectional surfaces, and allows modularization for pre-forming in factories and structural stability. It can be used for the shear walls in the core of general buildings or the structural members for parking buildings. In the future, it could be applied to moving large bus terminals, and widely used for general industrial structures as it can expedite the process compared to other methods. This study examined the applicability of SC structures to the retaining walls of a parking building and reviewed its economic value by comparing its construction term, quality control benefits, and cost compared to RC structures. It was found that SC structures are about 1.6-1.7 times more expensive than RC structures in terms of the cost of fabrication and installation. However, the construction term can be reduced by 27% to save indirect costs for constructors, as well as the cost of removing molds and material loss required when installing RC structures.

Economics on Structural Floor Systems of Super Tall Buildings

  • Shin Sung-Woo;Ahn Jong-Moon;Choi Myung-Shin;Seo Dae-Won;Kim Chul
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.609-613
    • /
    • 2004
  • An economic analysis is one of the most dominant factors to determine the project feasibility of super tall building. In economic considerations, it is very important toadopt optimum structural floor systems because these are dependent on both the cost and the duration of construction. The economics affected by structural floor systems are more distinct athigher story. As the story increases, the construction cost of floor system. is accumulated linearly, while the cost of lateral resisting system is increased geometrically. The purpose of this study is to investigate the economical effects of super tall buildings through application of optimum structural floor systems. Three types of structural systems(RC beam-column frame, RC flat plate frame, and Steel frame) of super tall buildings having 50-stories are considered in this study and compared to RC flat plate slab with other systems. Analytical result shows that RC flat plate slab using lightweight concrete ismost effective in both the cost and the duration of construction.

  • PDF

Experimental Study of In-situ Production of Precast Concrete Members

  • Lim, Jeeyoung;Son, Seunghyun;Kim, Jeong Tai;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.263-270
    • /
    • 2017
  • The precast concrete (PC) structure has been preferred for reasons of shortening the construction time and securing the quality and, in particular, it has a cost saving effect in case of long span and heavy loaded structure with high floor height. Most engineers take it for granted to install the plant produced PC members. Researchers in several papers have argued that slander PC members such as columns and girders can be cost-effective if in-situ production is possible, while ensuring quality equal to or better than in-plant production. However, this argument is not officially accepted because objective verification has not been done. Therefore, the purpose of this study is to experimentally conduct in-situ production of PC members to verify the above claim. For this study, a storage building with long span and heavy loaded structure with high floor height was selected as a case study site. For the site, most of the PC members were supplied from the plant, and some of the columns were produced in the site for this study. As a result, it has been confirmed that it has a cost saving effect of 20% while having superior quality to plant-produced PC columns.

  • PDF

A Study on the Change of Critical Elements of the Design Evaluation during the last two Decades - Focused on Architectural Competition in Germany - (최근 20년간 디자인 평가항목 변천에 관한 연구 - 독일설계경기를 중심으로 -)

  • Cho, Ja-Yeon
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.2
    • /
    • pp.3-9
    • /
    • 2011
  • In this study, the change of critical elements of the design evaluation was investigated during two decades at the architectural competition which was held nationwide in Germany. Specifically, the periods of investigation span both from July 1989 to June 1990 and from July 2009 to June 2010. The results of the analysis show that the cost of construction, the maintenance cost, the design of facade and the energy conservation are being magnified for the new important elements. The images of buildings and the economic aspects are meant to be high. The frequency of the critical elements for interior spaces is approximately two times more important than those for the forms and outdoor spaces. Overall, many juries of the architectural competition in Germany were interested in the elements for interior spaces. The field of function accounts for roughly the half of four basic architectural fields such as function, others, aesthetic and construction fields. The critical elements are required persistently such as context, Circulation, organization of space, form, landscape and outdoor space design, arrangement of building, cost of construction, function, design of facade, location of main entrance. These items are regarded as the most important elements of the design evaluation at the competition. Knowing the change of critical elements of the design evaluation, we can understand the trend of architecture in Germany. The results of this study can be applied in Korea to develop the critical elements of design.

Cost Analysis of Recycled Aggregate Production on Airport Pavement (공항포장용 순환골재의 처리방법별 경제성 분석)

  • Kang, Seung Min;Lee, Hwal Ung;Yang, Sung Chul
    • International Journal of Highway Engineering
    • /
    • v.16 no.5
    • /
    • pp.39-47
    • /
    • 2014
  • PURPOSES : This study aimed to analyze economic effect of recycled aggregate production on job-site airport pavement. METHODS : The validation of site recycling for waste concrete as economic efficiency is analyzed through the case study of site recycling at an O airport pavement construction. The break-even point for the cost of site recycling was estimated according to two different waste concrete processing methods such as job-site recycling and processing on commission (or plant). RESULTS : Job-site recycling cost decreases as the use rate of job-site recycled concrete aggregate increases, or the amount of concrete waste increases, but transporting distance decreases. It was shown in an O airport case that as the use rate of job-site recycled concrete aggregate exceeds 61.4 %, the job-site recycling cost is cheaper than the processing cost on commission. CONCLUSIONS : The results of this study can utilize basic data of feasibility for site recycling of waste concrete on airport pavement construction.

POST-OCCUPANCY EVALUATION (POE) AFTER THE EXPANSION OF AN APARTMENT PARKING LOT

  • Park, Jin-Gu;Oh, Kyung-Taek;Ryu, Gyu-Seok;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1559-1563
    • /
    • 2009
  • Despite the serious lack of parking lots, studies on parking lot expansion are insufficient; research on users' satisfaction following parking lot expansion is practically nonexistent. Therefore, this study sought to provide basic data for the parking lot expansion of old apartments by comparatively analyzing users' satisfaction before and after the parking lot expansion through a questionnaire survey that targeted residents benefiting from the expanded parking lot. Results revealed a low post-occupancy satisfaction with the parking lot expansion despite the parking lot expansion and improvement of the parking lot environment. This was because the parking lot was not expanded up to the second basement floor due to the lack of appropriate parking space. Other factors included the construction cost burden and lack of connectivity of the basement parking lot with elevators. The results actually raise the need for the establishment of an optimally suitable expansion plan and development of method and technology requiring lower cost and shorter construction period in the design and construction processes for parking lot expansion. Through post-occupancy evaluation (POE) after parking lot expansion, this study quantitatively identified the problems associated with the parking lots of old apartments and ensuing expansion effects. The findings in this study can be used as basic data to seek a suitable diagnosis and evaluation method for the parking lots of old apartments.

  • PDF

A Study on the Analysis and Estimation of the Construction Cost by Using Deep learning in the SMART Educational Facilities - Focused on Planning and Design Stage - (딥러닝을 이용한 스마트 교육시설 공사비 분석 및 예측 - 기획·설계단계를 중심으로 -)

  • Jung, Seung-Hyun;Gwon, Oh-Bin;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.25 no.6
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study is to predict more accurate construction costs and to support efficient decision making in the planning and design stages of smart education facilities. The higher the error in the projected cost, the more risk a project manager takes. If the manager can predict a more accurate construction cost in the early stages of a project, he/she can secure a decision period and support a more rational decision. During the planning and design stages, there is a limited amount of variables that can be selected for the estimating model. Moreover, since the number of completed smart schools is limited, there is little data. In this study, various artificial intelligence models were used to accurately predict the construction cost in the planning and design phase with limited variables and lack of performance data. A theoretical study on an artificial neural network and deep learning was carried out. As the artificial neural network has frequent problems of overfitting, it is found that there is a problem in practical application. In order to overcome the problem, this study suggests that the improved models of Deep Neural Network and Deep Belief Network are more effective in making accurate predictions. Deep Neural Network (DNN) and Deep Belief Network (DBN) models were constructed for the prediction of construction cost. Average Error Rate and Root Mean Square Error (RMSE) were calculated to compare the error and accuracy of those models. This study proposes a cost prediction model that can be used practically in the planning and design stages.

A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT

  • Choong-Wan Koo;Sang H. Park;Joon-oh Seo;TaeHoon Hong;ChangTaek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.676-684
    • /
    • 2009
  • Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, in this study, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case-based reasoning (CBR) methodology. The model suggests cost estimation with the most similar historical case as a basis for the estimation. In this study, the optimization process was also conducted, using genetic algorithms that reflect the changes in the number of project characteristics and in the database in the model according to the owner's decision making. Two optimization parameters were established: (1) the minimum criteria for scoring attribute similarity (MCAS); and (2) the range of attribute weights (RAW). The cost model proposed in this study can help building owners and managers estimate the project budget at the business planning stage.

  • PDF

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.