• Title/Summary/Keyword: and R&D project management

Search Result 422, Processing Time 0.032 seconds

PM system for New Product Development (신제품개발을 위한 PM시스템)

  • Choi Sungwoon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.123-127
    • /
    • 2005
  • This paper considers a set of project management practices for government R&D projects, enterprise R&D projects and new product design project. The approach of managing multi-project is proposed by the use of organizational structure and control.

  • PDF

A Study of R&D Portfolio Model Expansion for Improving Practical Application (실무 적용성 제고를 위한 R&D Portfolio 모형 확장 연구)

  • Ahn, Tae-Ho
    • Management & Information Systems Review
    • /
    • v.19
    • /
    • pp.1-15
    • /
    • 2006
  • The concept of portfolio is rarely understood and used in R&D management field. The conventional management technique in selecting R&D projects is scoring each projects and choosing projects based on the scores which are determined during evaluation. As a collection of good stocks is not necessarily a good stock portfolio, a collection of good R&D projects is not always a good R&D project portfolio. In this paper, framework and practical technique for constructing a R&D project portfolio are introduced. This technique can be easily applied in private and plublic R&D institutes.

  • PDF

A strategic R&D resource allocation and project selection based on R&D policy and objectives (정책목표와 연계한 전략적 R&D 투자재원배분 및 연구과제 선정방안연구)

  • 서창교;박정우
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.2
    • /
    • pp.61-61
    • /
    • 1991
  • We propose a strategic R&D resource allocation and project selection model based on national R&D policy and objectives. First, contributions to R&D policy and objectives for each R&D area are evaluated by using analytical hierarchy process (AHP). Second, fuzzy Delphi are proposed to estimate R&D budget for each R&D area. Then, a project selection grid is also introduced to implement two-phased evaluation for R&D project selection. We also discuss how to improve the consistency in AHP and how to reduce the pairwise comparison in AHP. The proposed model enables the decision makers to allocate R&D budget, and to evaluate and select the R&D proposals based on both the contribution to national R&D policy and objectives, and the size of each R&D area concurrently

A strategic R&D resource allocation and project selection based on R&D policy and objectives. (정책목표와 연계한 전략적 R&D 투자재원배분 및 연구과제 선정방안연구)

  • 서창교;박정우
    • Korean Management Science Review
    • /
    • v.16 no.2
    • /
    • pp.61-77
    • /
    • 1999
  • We propose a strategic R&D resource allocation and project selection model based on national R&D policy and objectives. First, contributions to R&D policy and objectives for each R&D area are evaluated by using analytical hierarchy process (AHP). Second, fuzzy Delphi are proposed to estimate R&D budget for each R&D area. Then, a project selection grid is also introduced to implement two-phased evaluation for R&D project selection. We also discuss how to improve the consistency in AHP and how to reduce the pairwise comparison in AHP. The proposed model enables the decision makers to allocate R&D budget, and to evaluate and select the R&D proposals based on both the contribution to national R&D policy and objectives, and the size of each R&D area concurrently.

  • PDF

A case study on improving the performance of R&D org. using software configuration method (소프트웨어 형상관리 기법을 이용한 R&D조직 성과향상 사례연구)

  • Kim, Byeong-Sam;Jang, Byeong-Man;Kim, Jeong-Han
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2007.11a
    • /
    • pp.408-412
    • /
    • 2007
  • This paper presents, with some actual cases of employing clear case, as a R&D project configuration management tool, a new methodology for the evaluation and enhancement of project performance in R&D organization. This methodology enables you to forecast future results of the project with story telling skill, to innovate R&D project execution using the concept of Technology Supply Chain with global R&D human resources, to improve the performance of each development stage based on the voices of customer, and to enhance the quality of output and to minimize risk of project with timely positioning of R&D human resources.

  • PDF

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

An Innovative Methodology for ICT R&D Project Generation (ICT 연구개발 프로젝트 발굴을 위한 창의적 방법론)

  • Kim, Young-Myoung;Ro, Youn-Jung
    • Journal of Information Technology Services
    • /
    • v.11 no.2
    • /
    • pp.185-196
    • /
    • 2012
  • The rapid evolution of ICT industry brings not only new services or products but also changes from common individual life to whole human society. Coping with these situations and survival, companies cannot help regarding R&D as the most important thing. So, discovering R&D projects which are suitable for the alternation is a big issue for many companies. To resolve the issue, KT has adopted Innovative Management Methodology developed by Strategos, which is co-founded by Gary Harmel. This paper describes this Innovative Management Methodology tailored to KT R&D. The methodology consists of five phases : focusing discovery, discovery, ideas/domains, domain elaboration & aiming point and R&D project proposal. Also, it shows some interim findings that came from the Innovative Management Process. Finally, the future plan for elaborating the methodology itself and generating new R&D projects is suggested.

A Study on the Effect of Satisfaction with R&D Projects on R&D Performance Satisfaction -For SMEs in Jeollanamdo-

  • Choi, Hong Wan;Kang, Min Jung
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.1
    • /
    • pp.11-19
    • /
    • 2021
  • The purpose of this study is to check whether the satisfaction of the R&D (Research & Development) project directly affects the R&D performance, and to find out whether the satisfaction with regional connectivity and the satisfaction with the R&D operation management significantly mediate the relationship that the satisfaction with the R&D project has on the R&D performance. In order to verify the research hypothesis on this, a total of 51 companies located in Jeollanam-do that actually conducted R&D research projects were surveyed and analyzed. In order to conduct an empirical study based on the collected questionnaire, a survey questionnaire related to the variables of the study model was composed based on a sample of 51 questionnaires. We used the SPSS program to verify the hypotheses in this study, and the hypotheses were verified by analyzing the validity, reliability, correlation, and deflection. As a result, there was a positive (+) significant relationship between R&D project satisfaction and R&D performance. In addition, it was found that the relationship between R&D project satisfaction and R&D performance was significantly mediated by the satisfaction with R&D regional connectivity and satisfaction with R&D project operation management.

Technical Management Processes for Large National R&D Projects : Focused on Pyro Project (대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로)

  • Kim, Jeong-Guk;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF