This paper presents the characteristics of leakage currents flowing through ZinC Oxide(ZnO) surge arrester blocks under mixed direct and 60 Hz alternating voltages. A mixed voltage, in which an alternating voltage is superimposed upon a direct voltage, appears on the HVDC system network. The mixed direct and alternating voltage generator with a peak open-circuit of 10 kV was designed and fabricated. The leakage currents and V-I curves for the fine and used ZnO surge arrester blocks were measured as a function of the voltage ratio k, where the voltage ratio k is defined as the ratio of the peak of alternating voltage to the peak of the mixed voltages. The resistive component in the leakage current in the low conduction region is significantly increased with increasing the voltage ratio k. The V-I characteristic curves for the mixed voltages lies between the direct and alternating characteristics, and the cross-over phenomenon in the high conduction region was appeared.
Bi-2223/Ag tapes need to be safe, even it is under the over-critical current state for the protection of a superconducting power machine. However, it is not easy to identify the condition for the safe operation because of their broad S/N transition region. In this paper, for the study of the operation condition of Bi-2223/ Ag tapes, we investigated the V-I curves and the temperature variation of Bi-2223/ Ag tapes experimentally, applying alternating over-currents, and analyzed the relationship between resistance and temperature increase. For the experiments, a Bi-2223/Ag tape of 57 A $I_c$ was prepared, and the over-critical current characteristics under adiabatic state from $LN_2$ was measured. From the experiments, we confirmed that the Joule heating predicted by V-I curve corresponded with the increase of the measured temperature exactly. Using the results, a safe operation condition of Bi-2223 tape was discussed.
A DC current sensor is disclosed in which two pairs of saturable cores are provided so as enclose a conductor carrying a direct current to be measured. On each of the saturable cores, a bias winding, a feedback winding and an output winding are wound. Circuit for detection of an asymmetry in the magnetization current, generated by a reference alternating voltage, in a signal-conditioner. The reference alternating voltage is fed to the respective series circuits such that no resultant induction current is induced in the modulating current. The voltages over the resistor form input signals for two peak value detectors, the strength of the output signal of which represents the degree of asymmetry of magnetization current. This paper describes the development a DC current sensor and its signal-conditioner.
An alternating current (AC) corrosion on buried pipeline has been studied using coupon and ER probe. Coupons and ER probes were applied to the sites from high value of AC voltage to low value based on the survey of AC voltages on buried gas transmission pipeline over the country. Parameters such as AC current density of coupon, AC voltage, cathodic protection potential, soil resistivity and frequency were monitored continually. Corrosion induced by AC was observed even under cathodically protected condition that met cathodic protection criterion (; below -850 mV vs. CSE). Corrosion rate was affected mainly not by AC voltage but by both of frequency and AC current density. An experimental corrosion rate relation could be obtained according to effective AC current density, in which AC corrosion rate increased linearly with effective AC current density, and its slope was 0.619 in coupon method and 0.885 in ER probes.
An alternating current (AC) corrosion using coupon has been studied. Coupons were applied in terms of AC voltage from high value to low value through the survey of AC voltages on buried gas transmission pipeline over the country. Parameters such as AC current density of coupon, AC voltage, cathodic protection potential, soil resistivity and frequency were monitored continually. Corrosion induced by AC was observed even under cathodically protected condition that met cathodic protection criterion(: below -850mv vs. CSE). Corrosion rate was affected mainly not by AC voltage but by both of frequency and AC current density. An experimental corrosion rate relationship could be obtained statistically, in which AC corrosion rate increased linearly with effective AC current density and its slope was 0.619.
Generally Bi-2223/Ag tapes have a broad S/N transition region and their sheath is a good electric conductor. In this study, the current distribution between superconductor and metal sheath in HTS tapes were investigated. AC with its peak value above 10 times $I_{c}$ was applied to HTS tapes for around 6 cycles and V-I characteristics were measured. Using the resistance of the sheath and V-I curves, the current distribution between superconductor and metal sheath was calculated. When 150 $A_{p}$ was applied, more than 2/3 of the current flows through superconductor. However, in the case of 304 $A_{p}$, most of the applied current came to flow through the metal sheath at the 6th cycle.e.e.e.
This paper presents the characteristics of leakage currents flowing through zinc oxide (ZnO) surge arrester elements under the combined direct-current (DC) and 60 Hz alternating-current (AC) voltages. The current-voltage characteristic curves (I-V curves) of the commercial ZnO surge arrester elements were obtained as a function of the voltage ratio a. At constant peak value of the combined DC and AC voltage, the resistive leakage current of the ZnO blocks was significantly increased as the voltage ratio $\alpha$ increased. The I-V curves under the combined DC and AC voltages were placed between the pure DC and AC characteristics, and the cross-over phenomenon in both the I-V curves and R-V curves was observed at the low current region. The ZnO power dissipation for DC voltages was less than that for AC voltage in the pre-breakdown region and reversed at higher voltages.
Because on the high-tension underground distribution line of an electric railway high voltage XLPE Cable two or three circuits between railway stations with a standard as receiving transformer facilities are established at a $30km{\sim}50km$ interval, reactive power in which the phase of a current is larger than that of a voltage is supplied when trains are not working, so when there are no loading or low loading as night. Due to the long-distance trend of the underground distribution system on an alternating current railway distribution line, the terminal voltage of a transformer is over the standard voltage, and after all, commercial cycle overvoltage is continued. To solve this problem, the shunt reactor is installed in middle of power distribution lines to maintain receiver voltage meted under the allowance regulation through control of the reactive power. Also, in case that the thickness of single cable is over $60mm^2$ and length of line is about over 30km, a circuit breaker is broken by shorting shunt ability of charging current in excess of shunt current(31.5A.rms). Therefore, this thesis presents installing the location of shunt reactor for quantitative analysis by using optimum algorism for compensation and control of the charging current.
A Rogowski coil can measure alternating currents from a few amps to over 1 million amps in a frequency range from less than 0.1 Hz to about lMhz. A Rogowski coil provides an induced output voltage which is proportional to the rate of change of the primary current enclosed by the flexible or the rigid coil-loop. Therefore, it is necessary to integrate the output voltage in order to produce a voltage proportional to the current. Also. it can reproduce the current waveform on an oscilloscope or any type of data acquisition device. This paper describes the practical design of the combination of a Rogowski coil and an integrator which provides a versatile current measuring system to accommodate a wide range of frequencies, current levels and conductor sizes.
This paper proposed a new magnetic field detection algorithm to detect metal pieces in food producing processes. This algorithm can detect mixed metal pieces by sensing magnetic field. Some metal pieces are passed through an over-current circuit to magnetize them. The magnetic field sensor can detect the change in the magnetic field on theconveyor belt caused by the flow of the metal pieces in the food product. However, such a method detects the output of signals that change their amplitude and phase according to the movement of the conveyor belt with the food product, in which the equilibrium of the positive signal that is created in the receiver coil loses its balance due to the magnetized material. This includes not only the signal elements resulting from the effect of the alternating magnetic fields of the mixed metals, but also the signal elements resulting from the effect of the alternating magnetic fields of the examined object itself.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.