• 제목/요약/키워드: air supply

검색결과 1,522건 처리시간 0.025초

가압탱크를 이용한 급수시스템의 해석 및 최적화 연구 (An Analysis of the Water Supply System with Pressurizing Tank)

  • 이태원;김태형;최도혁;김세동;김종필
    • 설비공학논문집
    • /
    • 제6권2호
    • /
    • pp.93-102
    • /
    • 1994
  • It is the goal of this study to provide the essential data for design and operation of optimum water supply system. Experimental and theoretical analyses have been conducted for various parameters, for example, volume and air percent of pressurizing tank, pump speed and pressure range inside tank, etc. Pressure inside tank with time, flow rate, energy consumption rate and pump operation time have been obtained for design and operating parameters to optimize the components and to establish the operating method of system, and therefore to contribute to the development of technology from a point of view of the improvement of quality, the enhancement of system efficiency and the reduction of construction cost.

  • PDF

일정 열유속의 열원을 갖는 사각공간의 혼합대류 열전달 (Heat transfer of Mixed convection in rectangular space with constant heat flux)

  • 조대환
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제23권4호
    • /
    • pp.552-558
    • /
    • 1999
  • Ventilation of the marine engine room is very important for the health of the workers as well as the normal operation of machines. To find proper ventilation conditions of this engine room numerical simulation with a standard k-$\varepsilon$model was carried out. In the present study the marine engine room is considered as a closed space with a heat source and forced ventilation ducts. The injection angle of air supply is found to be important. Injection with a downward angle depresses recirculation flow causing a strong stream in the wider space of the room Ventilation and removal of the released heat are promoted with this pattern, There is a possibility of local extreme heating at the upper surface of the engine when supply and exhaust ports of air are in bilateral symmetry.

  • PDF

실내 기류패턴에 따른 급기효율과 배기효율의 분포 (Distributions of Local Supply and Exhaust Effectiveness according to the Room Airflow Patterns)

  • 한화택;최선호;장경진
    • 설비공학논문집
    • /
    • 제13권9호
    • /
    • pp.853-859
    • /
    • 2001
  • A pulsed tracer gas technique is applied to measure distributions of local mean age and residual life time of air in a half-scale experimental chamber. The room airflow patterns are flow-visualized by a Helium bubble generator for three different exhaust locations. A supply slot is located at the top of a right wall, and an exhaust slot is either at bottom-left(Case 1), bottom-right(Case 2), or top-left(Case 3) location. Results show that the distribution of LMA and LMR are different from each other, but both of them are closely related to the airflow pattern in the space. Results on overall room ventilation effectiveness are provided depending upon ventilation airflow rates for three different supply-exhaust configurations.

  • PDF

PEM 연료전지 자동차의 급기 시스템의 모델링 및 분석 (Modeling and Analysis of the Air Supply System for Vehicular PEM Fuel Cell)

  • 장현탁;강이석
    • 한국수소및신에너지학회논문집
    • /
    • 제14권3호
    • /
    • pp.236-246
    • /
    • 2003
  • This paper focuses on developing a model of a PEM fuel cell stack and to integrate it with realistic model of the air supply system for fuel cell vehicle application. The fuel cell system model is realistically and accurately simulated air supply operation and its effect on the system power and efficiency using simulation tool Matlab/Simulink. The Peak performance found at a pressure ratio of 3, and it give a 15mV increase per cell. The limit imposed is a minimum SR(Stoichiometric Ratio) of 2 at low fuel cell load and 2.5 at high fuel cell load.

공동주택의 노후 급수관 개선방안에 관한 연구 : 부천시 공동주택을 중심으로 (The Replacement Plans for Aged Public Water Supply Pipes in Apartment Buildings : Especially Apartment Buildings in Bucheon)

  • 이용화;허용철
    • 설비공학논문집
    • /
    • 제27권4호
    • /
    • pp.228-232
    • /
    • 2015
  • The water supply galvanized steel pipes of apartment buildings in Bucheon city constructed with building permission before 1994 have many problems such as leaks, the water containing rust, and low water pressure due to corrosion. Therefore, this study aims to find a way to renew the water supply pipes under investigation through a survey. As a result, when replacing the galvanized steel pipe with the corrosion-resistant pipe, the water supply system should also be changed from the gravity tank system to the booster pump system and the hygienic water storage tank. It is necessary to redraft the long-term repair plan including the replacement of the water supply system. Also, it is necessary to save the allowance reserve according to the modified long-term repair plan.

공동주택 온수난방 시스템의 적정 열공급을 위한 배관망 시뮬레이션 (Simulation of Pipe Network for Optimum Heat Supply in the Hot Water Heating System of Apartment House)

  • 김주용;민만기;최영돈
    • 설비공학논문집
    • /
    • 제5권3호
    • /
    • pp.157-168
    • /
    • 1993
  • Pipe network of hot water heat supply system in an apartment house was analyzed. Flowrate and supply heat capacity of each household in which constant flowrate balancing valve is installed in a single zone system were calculated and the results were investigated. In the existing piping system, the non-uniformity of heat supply with floors due to the static pressure and temperature difference between supply main and return main can not be avoided and this tendency get intense with the increase of the height of building. The non-uniformity of heat supply can be prevented by the installation of balancing valve at each household, however if the performance of supply pump is not sufficient to overcome the energy loss due to the installation of balancing valve for constant flow rate or if the selection of the valve capacity is not adequate, the valves will may lose their controllability.

  • PDF

대학교 강의실 EHP 제어를 이용한 에너지 절약 시스템 (Energy Saving System of EHP Control at the College Lecture Room)

  • 정기범
    • 대한안전경영과학회지
    • /
    • 제16권2호
    • /
    • pp.167-174
    • /
    • 2014
  • Heating and air conditioning system is changing rapidly from the traditional HVAC central supply system to the individual supply system with electrical heat pump system (EHP) in Korean school buildings. The individual supply system has advantages to turn on and off individually and to adjust the thermal comfort separately, but energy is wasted in the unoccupied classroom when the last leaving occupant does not turn off the controller. If the controller is to be off automatically while the classroom is not in use, energy consumption would decrease dramatically. This project aims to cease the unnecessary EHP supply in vacant classroom by inputting the class schedule from the central control room to reduce the energy-spending. Experimental measurements were carried out between the controlled classroom that is turned off when not in use and the uncontrolled room that is turned on continually. Occupant's comfort and energy consumption were measured and compared between the controlled case and the uncontrolled case. The energy consumption of controlled classroom case is 30-60% less than that of the uncontrolled classroom case. This result shows that controlling the cooling supply for the unoccupied classroom using the class schedule can decrease the energy consumption remarkably. This supply control system can be used to conserve energy in school structures like universities.

지역난방 동절기 공동주택 온수급탕부하의 LS-SVM 기반 모델링 (LS-SVM Based Modeling of Winter Time Apartment Hot Water Supply Load in District Heating System)

  • 박영칠
    • 설비공학논문집
    • /
    • 제28권9호
    • /
    • pp.355-360
    • /
    • 2016
  • Continuing to the modeling of heating load, this paper, as the second part of consecutive works, presents LS-SVM (least square support vector machine) based model of winter time apartment hot water supply load in a district heating system, so as to be used in prediction of heating energy usage. Similar, but more severely, to heating load, hot water supply load varies in highly nonlinear manner. Such nonlinearity makes analytical model of it hardly exist in the literatures. LS-SVM is known as a good modeling tool for the system, especially for the nonlinear system depended by many independent factors. We collect 26,208 data of hot water supply load over a 13-week period in winter time, from 12 heat exchangers in seven different apartments. Then part of the collected data were used to construct LS-SVM based model and the rest of those were used to test the formed model accuracy. In modeling, we first constructed the model of district heating system's hot water supply load, using the unit heating area's hot water supply load of seven apartments. Such model will be used to estimate the total hot water supply load of which the district heating system needs to provide. Then the individual apartment hot water supply load model is also formed, which can be used to predict and to control the energy consumption of the individual apartment. The results obtained show that the total hot water supply load, which will be provided by the district heating system in winter time, can be predicted within 10% in MAPE (mean absolute percentage error). Also the individual apartment models can predict the individual apartment energy consumption for hot water supply load within 10% ~ 20% in MAPE.