• Title/Summary/Keyword: aeration time

Search Result 226, Processing Time 0.031 seconds

Studies on the Application of Microorganism to Control the Bulking of Paper Mill Wastewater (제지폐수 벌킹제어를 위한 미생물 적용 연구)

  • 이성호;조준형
    • Journal of Korea Technical Association of The Pulp and Paper Industry
    • /
    • v.34 no.3
    • /
    • pp.32-37
    • /
    • 2002
  • The paper mill wastewater actually generating bulking was used to apply to the spot. Batch and continuous type pilots were used in this study. Optimal time after propagating generation of activated sludge in aeration basin by adding Hoc forming microorganism was 24 and 36hours while optimal time of activated sludge in original aeration basin was 60hours. Showing the difference of sedimentation velocity at 7th day after operating a pilot continuously, SV30 was decreased to 50% at 13th day. COD value in aeration basin with floe forming microorganism was 35mg/L while COD value in original aeration basin was 52mg/L. It was indicated that application of Hoc forming microorganism can control the bulking of paper mill wastewater by shortening of recovery time and improving of pollution removal efficiency.

Air stripping of odor causing materials from eutrophic lake water (부영양호 원수의 냄새유발 물질 탈기 특성)

  • Park, Noh-Back;Song, Yong-Hyo;Na, Gywang-Joo;Park, Sang-Min;Jun, Hang-Bae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.5
    • /
    • pp.523-529
    • /
    • 2008
  • Algal blooms in a local eutrophic lake often produces the musty and earthy taste & odor problems. Since the odor causing compounds(OCCs) including geosmin and 2-MIB have their own volatility, the OCCs can be removed from water by air stripping methods. Removal of TON(threshold odor number) as an index for OCCs could be fitted well with the first order equations($R^2=0.9$ above), where the air stripping coefficient of TON, k was in the range between 0.0055 and 0.0097 according to the aeration time. k within 30min aeration tests was 0.0097, while it was 0.0055 where the aeration time extended to 150min. With 15 mg/L of PAC, removal of TON was not simulated with 1st order equation within 30min aeration. Within 30min aeration, OCCs rather than geosmin and/or 2-MIB could be removed easily by air stripping or PAC adsorption, while OCCs such as geosmin and/or 2-MIB could be removed slowly by air stripping after 30min aeration. Geosmin and 2-MIB were not readily removed by air stripping(k of them were 0.0018~0.0047 and 0.0018~0.0034, respectively at different air flow rates). Geosmin could be removed by air stripping a little better than 2-MIB.

Improvement of effluent water quality by sludge aeration at the conventional drinking water treatment plant (정수장 슬러지 폭기를 통한 방류수 수질 개선)

  • Choi, Ilgyung;Shin, Changsoo;Beak, Inho;Lim, Jaecheol;Jeong, Chanwoo;Lee, Sungjin;Park, Jungwook
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.28 no.2
    • /
    • pp.249-255
    • /
    • 2014
  • So many drinking water treatment plants are under various difficulties by new reinforced effluent standards. Since the target turbidity, much higher than annual average, for designing sludge thickener have to be set to confront high turbidity season, the sludge at thickener should be put up for a long time during usual days. So the soluble manganese and chloroform may be formed under the anaerobic environment in the sludge thickener when the sludge retention time is longer with low turbidity. This phenomenon results in difficulties to keep regulatory level of the discharged effluent. For an effort to overcome the problems, a sludge aeration was successfully implemented into the thickening process. As a result, the final effluent quality and sludge volume were much improved; 41 % of manganese, 62 % of chloroform and 35 % of sludge volume. Additionally, effluent quality was improved ; 61 % of Manganese on aeration with pH control and we could make sure of stability effluent quality despite a long sludge retention time. We recommended the standard of installation sludge aeration equipment to nationally supply water treatment plant under effluent water quality problem ; Manganese, Chloroform, etc.

A Study on the improvement of treatment efficiency in a conventional sewage treatment plant (기존 하수처리장에서의 처리 효율개선에 관한 연구)

  • 안철우;박진식;문추연
    • Journal of environmental and Sanitary engineering
    • /
    • v.15 no.3
    • /
    • pp.50-56
    • /
    • 2000
  • In this study, sewage were treated with operating Two-step Aeration System and conventional activated sludge process together in a condition. At the same HRT 8hr of Two-step Aeration System and Activated Sludge Process, BOD treatment efficiency of 1st sedimentation basin effluent 36.9% by Two-step Aeration system was 12.3% higher than 24.65 by Activated Sludge Process and the COD treatment efficiency 39.8% by two-step Aeration System was 11.6.3% higher than 28.2% by Activated Sludge Process. BOD and COD treatment efficiencies of 2nd sedimentation basin effluent were 88.1% and 85.6% Two-step Aeration System and were 83.8% and 82.3% Activated Sludge Process. In the first treatment, as BOD was relatively removed a lot, F/M ratio 0.17, $0.21{\cdot}BOD/kg{\cdot}MLSS.d$ was maintained by Activated Sludge Process. Therefore it was proved that organic matter treatment efficiency by Two-step Aeration System os Higher than by Activated Sludge Process in a aeration time 8hr. $NH_4^{+}-N$ treatment efficiencies were 55.5% by Two-step Aeration System and 39.75 by Activated sludge Process. $NO_3^{-}-N$ concentration in 2nd. sedimentation basin effluent were 3.33% by Two-step Aeration System and 2.36% by Activated Sludge Process. From this result, Two-step Aeration System was proved more advantageous treatment process for nitrification than Activated Sludge Process. The fluctuation range of BOD, COD and SS concentration in 2nd sedimentation basin effluent $16~33mg/{\ell}$, $15~23mg/{\ell}$ and $14~22mg/{\ell}$ by Two-step Aeration System was smaller than $16~57mg/{\ell}$, $15~25mg/{\ell}$ by Activated sludge Process. Overall the fluctuation range in 2nd sediment basin effluent by was smaller than by Activated Sludge Process. As a result, it is possible for this Two-step Aeration with no facility investment and a little of operation condition change in a conventional sewage treatment plant to get stability and nitrification of treatment water quality.

  • PDF

Removal Characteristics of Nitrogen and Phosphorus in swine wastewater by Using Acetic acid on the SBR Process (SBR에서 아세트산을 이용한 양돈폐수의 질소·인 제거 특성)

  • Huh, Mock;Kang, Jin-Young
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.12 no.1
    • /
    • pp.84-93
    • /
    • 2004
  • This study was performed : 1) to find the suitable HRT(hydralic retention time), 2) to evaluate the effects of the ratio of mixing/aeration time and injection time of external carbon source, for the removal of organics, nitrogen and phosphorus in swine wastewater by SBR(sequencing batch reactor process), which is one of the biological treatment process. The result of this study were summarized as follows : (1) As the ratio of mixing/aeration time was higher, $NH_4{^+}-N$ removal efficiency was increased and it was increased with increasing injection time of external carbon source because nitrification was affected by denitrification microbes propagation when injection time of external carbon soruce was shorted. T-N removal efficiency was increased with increasing the ratio of mixing/aeration time and injection time of external carbon source. (2) The T-P removal efficiency showed a great difference in each operating condition, and it was increased with increasing the ratio of mixing/aeration time increased and when the injection time of external carbon source was shorted because denitrification was done with effect by denitrification microbes propagation. (3) The highest removal efficiency of organic and nitrogen were obtained by the operating condition of Run 4-1(the ratio of mixing/aeration time : 16.5/5.5, injection time of external carbon source : 15hours) and T-P were obtained by the operation condition of Run 4-2(the ratio of mixing/aeration time : 16.5/5.5, injection time of external carbon source : 3hours), and efficiency(effluent concentration)of $BOD_5$, $COD_{Mn}$, $COD_{Cr}$, T-N and T-P in the treated water was 96.1%, 87.7%, 90.6%, 86.6% and 84.5%, respectively.

  • PDF

Nutrient Removal Using Fermented Organic Acids Derived from the Primary Sludge in the Intermittent Aeration Activated Sludge Process

  • Weon, Seung-Yeon;Lee, Sang-Il;Lee, Chan-Won
    • Environmental Engineering Research
    • /
    • v.16 no.4
    • /
    • pp.213-218
    • /
    • 2011
  • The two-stage intermittent aeration activated sludge process (IAP) and dynamic-flow intermittent aeration activated sludge process (DFP) were investigated for the nutrient removal of domestic wastewater. Three sets of IAP and one set of DFP were operated. The fermented settled sludge taken from the primary settling tank was added to two IAP and one DFP as an external electron donor, with one IAP, in which an external carbon source was not added, as a control. All the systems were operated at a sludge retention time of 20 days and a hydraulic retention time of 12 hr. A Higher denitrification rate was observed with the fermented settled sludge for the denitrification compared to the process without the addition of the organic source. The result indicates that the fermented acid from the primary domestic sludge has been proved to be an excellent electron donor for denitrification and biological phosphorus removal with IAP and DFP in treating relatively low C/N ratio(Carbon / Nitrogen ratio) wastewater. Phosphate accumulating organisms have a capability of competing with denitrifiers in the presence of volatile organic acids under anoxic conditions.

Effect of Bioaugmentation on Performance of Intermittently Aerated Sewage Treatment Plant (Bioaugmentation이 간헐폭기 오수처리장치의 운전효율에 미치는 영향)

  • Jeong, Byung-Gon
    • Journal of Environmental Health Sciences
    • /
    • v.34 no.3
    • /
    • pp.233-239
    • /
    • 2008
  • In order to improve reactor performance of existing sewage treatment plants, the feasibility of enhancing reactor performance by bioaugmentation using EM as bioaugmentation agent and the effects of anoxic: oxic time ratio on reactor performance were investigated. Continuous and intermittent aeration modes were compared under the 6 hr of HRT. Three different types of intermittent aeration modes, that is, 15 min, of anoxic:45 min of oxic, 30 min of anoxic: 30 min of oxic, and 45 min of anoxic: 15 min oxic respectively were chosen as test modes to study the effects of anoxic : oxic time ratios on reactor performance. The optimum anoxic: oxic time ratio was 30 min:30 min when considering simultaneous removal of organic, nitrogen and phosphorus. When applying EM into a continuously aerated reactor under the varying dosing rates of 50-200 ppm, reactor performance in terms of organic and nitrogen removal efficiencies was not improved at all. Nitrogen removal efficiency was increase when the EM dosing rate was increased. However the degree of improvement was slight when the EM was injected above 100 ppm. However optimum phosphorus removal was found at the EM dosing of 200 ppm. Thus it was found that optimum injection concentration of EM is 200 ppm. It is apparent that putting EM into a sewage treatment plant significantly affects the T-N removal efficiency of the reactor by enhancing denitrification efficiency especially in operational conditions of relatively long anoxic periods. To achieve reciprocal condition in a reactor with intermittent aeration it is necessary to enhance the reactor performance by EM injection. In the case of modifying existing continuously aerated reactors into intermittent aerated reactors, it is obvious that operating costs of aeration would be reduced by reducing aeration time when compared with existing conventional sewage treatment plants.

A Study on the Treatment of Paper Mill Wastewater with the Addition of High Thermal Microbial Inoculants (고온성 종균제를 이용한 제지폐수 처리)

  • 이성호;임택준;조준형
    • Journal of Korea Technical Association of The Pulp and Paper Industry
    • /
    • v.34 no.2
    • /
    • pp.54-60
    • /
    • 2002
  • The Wastewater of toilet paper mill recycling recovered milk carton was used as a raw material for this study. According to the actual mill conditions, hydraulic retention time was adjusted to 12 hours and F/M (Food/Micro-organism) ratio was adjusted to 0.23. Temperature of aeration basin was varied from 2$0^{\circ}C$ to 5$0^{\circ}C$. The change of Micro-organisms and removal efficiency of pollutant were investigated at the varied temperature of basin. Aeration basin using high thermal microbial inoculants showed more removal efficiency of SS, COD than aeration basin using conventional microbial inoculants at high temperature. Floc consolidation of aeration basin using high thermal microbial inoculants added sludge was better than that of sludge from aeration basin using conventional microbial inoculants.

Removal of N and P by Intermittented Aeration Activated Sludge Process (간헐폭기식 활성슬러지 공법에 의한 질소, 인 제거)

  • 김동밀;이영신
    • Journal of Environmental Health Sciences
    • /
    • v.18 no.2
    • /
    • pp.57-61
    • /
    • 1992
  • This study was made for enhanced removal of N and P by intermittented aeration Activated Sludge Process. Experiment were conducted to find the effects of aeration interval and nutrient removal efficiency. When applied aeration interval were 30~60 min, 2~4 h, 4~8 h, organic matter was not affected while phosphorous removal was aeration interval 30~60 min. Also, when applied mixing intensity were 15, 30, 45 and 60 rpm, organic matter was not affected while removal was maximum at 15 rpm. Total nitrogen and phosphorous removal were in the range of 76 and 85%. Density and MLSS of Sludge were in the range of 2.3~2.6 and 7198~7810 mg/l. Release of phosphorous from activated sludge under unaerobic condition was increased as pass time.

  • PDF

Maturity Evaluation and Determination of Aeration Time Using Germination Index of Co-Digestates (발아지수를 이용한 혼합 혐기소화액의 부숙도 평가 및 폭기기간 설정)

  • Byeon, Ji-Eun;Lee, Hong-Ju;Hwang, Sun-Goo;Rhim, Tae-Jin;Ryoo, Jong-Won
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.28 no.2
    • /
    • pp.5-13
    • /
    • 2020
  • This study was conducted to evaluate the effect of optimal aeration time of livestock manure slurry with fruits pomace on germination index. Six co-digestates of livestock manure slurry with fruits was aerated with 0.1 ㎥ air/㎥·min for 54 days. The maturity of digestates was evaluated using the germination method. The germination index(GI) of co-digestate of SS + CS + MP was more than 70 at the 30th day of aeration. The GI of co-digestate of SS + CS was more than 70 at the 36th day of aeration. The GI of digestate of swine manure slurry alone was 70 at the 54th day of aeration. The co-digestate of SS + MP caused to shorten 24 days of aeration period to reach GI of 70, compared to swine manure digestate. These results suggest that the germination index of seed could be used to establish the optimal aeration time for co-digestate of liquid fertilizer.