• Title/Summary/Keyword: adjacent building

Search Result 348, Processing Time 0.024 seconds

Operation Performance Evaluation on Auxiliary Heating Device to Prevent Condensation adjacent to Built-in Furniture of Apartment Units in Winter (기존 공동주택 붙박이장에서 겨울철 결로 방지를 위한 보조난방장치 운전 성능 평가)

  • Lee, Chae-Lyn;Lee, Hyun-Hwa;Lim, Jae-Han;Song, Seung-Yeong
    • Journal of Korean Institute of Architectural Sustainable Environment and Building Systems
    • /
    • v.12 no.6
    • /
    • pp.567-578
    • /
    • 2018
  • The purpose of this study was to evaluate condensation prevention for condensation vulnerable areas around built-in furniture of apartment buildings by applying auxiliary heating device. Recently, the condensation and mold problems of apartment buildings has been growing due to high insulation and high air-tightness performance for energy saving. Condensation at built-in furniture were generally found in winter at the of furniture's back panels, adjacent surfaces of wall, floor and ceiling. These problems are related to the weather conditions and indoor room conditions in winter. To solve these problems, auxiliary heating device was developed and could be installed. The aim of paper is to analyze the thermal environment around the built-in furniture which were applied and not applied auxiliary heating device in winter. In results, it was possible to increase the surface temperature of vulnerable areas around built-in furniture by applying auxiliary heating device, and to minimize condensation problems by using the minimum device.

Optimal Design of Hybrid Control System through Inter-Building Connection (빌딩간 연결을 통한 복합제어시스템의 최적설계)

  • Park, Kwan-Soon;Ok, Seung-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.81-88
    • /
    • 2017
  • This study deals with the optimal design of a hybrid control system composed of a combination of active control system and passive control system for effective seismic performance improvement of two adjacent structures. The proposed hybrid control system adopts a configuration of installing an active control device in one building and connecting two adjacent structures with a passive control device so that the one-side active control force can be bi-directionally applied to both buildings through the passive connecting devices. In order to derive the optimal performance of the proposed system, the design parameters of the passive and active control systems were searched using the genetic algorithm. Numerical simulations of 10-story and 8-story buildings have been performed to verify the effectiveness of the proposed technique. For the purpose of comparison, the conventional independent control system with two identical active control systems being installed separately for each structure was also optimally designed and its seismic response has been evaluated as well. From the comparative results of the two control systems, it is demonstrated that the proposed hybrid control system requires larger control force for its one-side active control device than the conventional independent control system does for each of both-side active devices, but quite less than the total control force required for both-side devices of the independent control system, while maintaining similar seismic performance. Therefore, the proposed system is more economical and reliable than the conventional independent control system with two identical active devices.

Tunneling-induced Building Damage Risk Assessment System (터널굴착에 따른 인접건물 손상위험도 평가시스템)

  • Park, Yong-Won;Yoon, Hyo-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.51-59
    • /
    • 2002
  • This paper deals with development of a damage risk assessment system for adjacent buildings to under-passing tunnel face considering 3D-ground movement. The system consists of building and ground information module, monitoring data module, settlement evaluation module, and building damage risk assessment module. The major modules, settlement evaluation module and building damage assessment module, are based on settlement estimation model suggested by Attewell et al (1982) and the building damage assessment method by Mair et al. (1996). After estimating 3D-ground movements due to tunneling with settlement evaluation module, damage assessment far buildings is performed using building damage risk assessment module. The developed system has two major functions; 1) calculation of 3D-settlement with ground loss ($V_{s}$)or maximum settlement ($w_{max}$) and inflection point (i) using various empirical formulae, monitoring data, numerical results, and so on; 2) assessment of damage risk for adjacent buildings of arbitrary section with position change of tunnel face. The field data given by Boscadin and Cording (1989) leer the case of two-storied masonry building near the Metro tunnel in Washington D.C. was simulated to verify the applicability of the developed system.

A study on the Improvement of Design Guideline for the Use Enhancement of Privately Owned Public Space (공개공지(公開空地) 효용성(效用性) 제고(提高)를 위한 설계지침(設計指針) 개선(改善) 방안(方案))

  • Park, Jung-Lim;Kim, Hyun-Jun;Kwon, Young-Hyoo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.3
    • /
    • pp.115-141
    • /
    • 2011
  • In urban space, public space is publicly or privately owned space freely accessible by the public. Privately owned public space to the public hosts small-scale rest facilities to serve the public in buildings of certain purposes and sizes for the sake of pleasant urban environment. The Building Act and building ordinances formulate a set of criteria for management and easement of construction standards as well as the area. When creating privately owned public space, one can get incentives through the easement of floor space index and height limit. The purposes of this study were to investigate and analyze privately owned public open space, which is freely accessible by the public, and its adjacent streets and to propose plans to improve the regulations for securing privately owned public space for more rational and practical legal applications. The study then proposed some plans to help to increase the quality of privately owned public space including applying the coefficient to suggest the type of privately owned public space fit for the features of the streets and measure the appropriate utility level differently and distinguishing the mandatory items according to the facility regulations in privately owned public space from the ones qualified for additional points in case of installation. The types of privately owned public open space should be applied differently and the content of facilities intended should be different according to whether it will serve as a resting place or grant more importance on traffic by walking, depending on the features of its adjacent streets. The privately owned public space, the frontage space of building, and the adjacent sidewalks should become a whole and be regarded as one space from the integrated perspective. The results of the study claim further significance in that it investigated privately owned open space and roadside across Seoul. They will serve as useful data to solve the problems with the privately owned public space of the city, which destroys spatial continuity by focusing on the quantitative increase of privately owned open space and creating individual privately owned open spaces and builds high-rise buildings alienated from the existing spaces, and to increase the quality of future privately owned public space.

A Study on Improvement of the Registration System for Address Information Reference Object of Addressing Road Name Address (도로명주소의 주소정보기반대상 등록 제도 개선 연구)

  • Yang, Sungchul
    • Journal of Cadastre & Land InformatiX
    • /
    • v.51 no.2
    • /
    • pp.21-34
    • /
    • 2021
  • Considering the role of roads in cities and the purpose of the Road Name Address Act, it is natural that the road name of the address is registered as the nearest road section adjacent to the building. Therefore, the Enforcement Decree of the Road Name Address Act also stipulates that mayor assign building numbers based on the basic numbers of road sections adjacent to the main entrances of buildings. However, there were cases where addresses are given from distant roads rather than adjacent roads among the actual road name addresses. Most of them are caused by misinterpretation of the case where the entrance faces more than one road. In this study, institutional and systematic improvement plans were proposed with the aim of enabling accurate selection of address information reference objects by demonstrating the limitations of the current building numbering method and presenting institutional improvement plans. Road name addresses were implemented for the core purpose of improving the inconvenience of locating the lot number address. Although some still complained of the inconvenience of road name addresses, successful settlement was possible because of the intuitive principle that most countries around the world could use it and find buildings along the road. Therefore, the system and system improvement should be made quickly in terms of accurate address information quality management and revitalization of related industries.

Analysis on the Vibration Transmission Characteristics of the Standard Test Building by Using Standard Impact Source (경량 및 중량 충격원에 의한 표준 실험동의 진동전달 특성 분석)

  • Jin, Pil-Hwa;Kim, Heung-Sik;Kim, Do-Heong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.371-371
    • /
    • 2006
  • The purpose of this study is to provide a fundamental data for efficient and economical reduction method and predict ion method of floor impact noise. In order to get the useful results, the measurement on the vibration transmission characteristics of standard test building with four rooms by using heavy and light-weighed impact source were carried out. In this measurement various conditions such as the change of test structure construction, the pick-up sensor location, the excitation posit ion, and the resilient material types were applied to get the vibration characteristics transmitted from excitation room to adjacent rooms.

  • PDF

Three-dimensional numerical simulation of turbulent flow around two high-rise buildings in proximity

  • Liu, Min-Shan
    • Wind and Structures
    • /
    • v.1 no.3
    • /
    • pp.271-284
    • /
    • 1998
  • This paper uses the numerical simulation to investigate the interference effect of 3-D turbulent flow around two high rise buildings in proximity at the different relative heights, gaps, and wind velocities. The computer program used to carry out the simulation is based on the control volume method and the SIMPLEST algorithm. The ${\kappa}-{\varepsilon}$ model was used to simulate turbulence effects. Since the contracted flow between two adjacent buildings enhances the strength of vortex shedding from the object building, the pressure coefficient on each side wall of the object building is generally increased by the presence of apposed building. The effect is increased as the relative height or the gap between the two buildings decreases. The velocity on the vertical center line between two buildings is about 1.4 to 1.5 times the upstream wind velocity.

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

Excavation and Building Damage Assessment - Fundamentals (지반굴착과 주변 구조물 손상평가 - 기본개념)

  • 유충식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.263-270
    • /
    • 2002
  • During deep excavation, changes in the state of stress in the ground mass around the excavation and subsequent ground losses inevitably occur. These changes in the stress and ground losses are reflected on surrounding ground in the form of ground movements, which eventually Impose strains onto nearby structures through translation, rotation, distortion, and possibly damage. A substantial portion of the cost of deep excavations in urban environments is, therefore, devoted to prevent ground movements. Prediction of ground movements and assessment of the risk of damage to adjacent structures has become an essential part of the planning, design, and construction of a deep excavation project in the urban environments. This paper presents excavation-induced ground movement characteristics as well as important issues related to excavation-induced building damage assessment.

  • PDF

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.