• Title/Summary/Keyword: acquisition

Search Result 7,097, Processing Time 0.034 seconds

Design of high-speed preamble searcher adequate for RACH preamble structure in WCDMA reverse link receiver (RACH 프리앰블 구조에 적합한 WCDMA 역방향 링크 수신기용 고속 프리앰블 탐색기의 설계)

  • 정은선;도주현;이영용;정성현;최형진
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.8A
    • /
    • pp.898-908
    • /
    • 2004
  • In this paper, we propose a high speed preamble searcher feasible for RACH(Random Access Channel) preamble structure in WCDMA reverse link receiver. Unlike IS-95, WCDMA system uses AISMA(Acquisition Indication Sense Multiple Access) process. Because of the time limit between RACH preamble transmission and AI(Acquisition Indicators), and the restriction on the number of RACH signatures assigned to RACH preamble, fast acquisition indication is required for efficient operation. The preamble searcher proposed in this paper is based on 2-antenna system and has adopted FHT algorithm that has the radix-2 16 point FFT structure. The acquisition speed using FHT is 64 times faster than the conventional method that correlates each signature. Based on their fast aquisition scheme, we improved the acquisition performance by calculating the correlation up to the 4096 chips of the total preamble length. The performance is analyzed by using Neyman-pearson method. The proposed algorithm has been applied for the implementation of WCDMA reverse link receiver modem successfully.

The Factors of the Acquisition of Qualifications and the Employment and Wage Effects of the Acquisition of Qualifications (자격취득의 결정요인 및 취업·임금효과)

  • Kim, Ahn Kook;Kang, Soon Hie
    • Journal of Labour Economics
    • /
    • v.27 no.1
    • /
    • pp.1-25
    • /
    • 2004
  • In knowledge-based economy where the human capital has an strong compatibilities, the life cycle of technologies and skills get shorter, and the mobility of labor get greater, the role of the signal system of qualifications have greater importance. This article used the KLIPS(Korean Labor Institute Panel Study) data, and analysed the factors of the acquisition of qualifications and the employment and wage effects of the acquisition of qualifications by fixed effects logit model and random effects model. The lower school stratification acquired the more qualifications, and in the case of men the unemployed one acquired the more qualifications. The employment effects of the acquisition of qualifications are significant at first year and second year in women, but the men's of the employment effects of acquisition of qualifications are not significant. The wage effects of the acquisition of qualifications are not significant. The results of the regression suggest that in Korea the signal system of qualifications do not working, and that the qualifications in Korea need to reform.

  • PDF

The Optimal Process of Weapon Acquisition Management (I) -With Special Reference to the Cost/Effectiveness Model for the Selection of Weapon Acquisition System- (무기체계 획득관리의 최적화 (I) -무기체계 획득시스템의 선정을 위한 비용대효과분석모형을 중심으로-)

  • Lee Jin-Joo;Kwon Tae-Young;Joo Nam-Youn
    • Journal of the military operations research society of Korea
    • /
    • v.3 no.2
    • /
    • pp.49-77
    • /
    • 1977
  • Weapon systems are curcial instruments for the security of a nation and critical elements for the victory in a war. Since modern weapon systems tend to be capital-intensive with high precision and quality, they become more and more complex and diversified; their acquisition costs become huge; and their technological obsolescence becomes accelerated. Therefore, the systematic management of weapon acquisition process would be one of the most important defense tasks at the national level. To analyze such problems and find solutions, this paper has studied various aspects related to the efficient management of weapon system acquisition. After brief summarization of the general characteristics of weapon systems, their effectiveness, and developmental trend, the paper discusses the defense management policies and techniques for the weapon systems. Specifically, four alternative acquisition methods such as indigenous R & D, foreign purchase, co-production and joint-production are discussed and analyzed by systems approach. The systems analysis procedure to evaluate and select weapon acquisition method is as follows; 1) to analyze the merits and demerits of the alternative methods, 2) to screen unrealistic alternatives through the consideration of significant factors such as political, economic, military, technological, and social constraints, 3) to evaluate and select an optimal one among the remaining acquisition methods after the cost-effectivenss analysis. For the base of cost-effectivess analysis, cost analysis model as well as effectiveness analysis model of each acquisition method are developed.

  • PDF

Wireless Triggering Pulse Generation for Digital X-ray Imaging System (디지털 x-ray 영상시스템을 위한 무선 트리거 발생기)

  • Ko, Dae-Sik;Lee, Jae-Cheol;Lee, Joo-Shin
    • Journal of Advanced Navigation Technology
    • /
    • v.11 no.2
    • /
    • pp.163-169
    • /
    • 2007
  • In this paper, we propose a method of trigger pulse generation to capture the image on time by making a synchronization between the x-ray generator and digital x-ray image acquisition system. we designed a wireless trigger pulse generation circuit to make a synchronization between x-ray generator and digital image acquisition system and analysis its performance. When it starts to detect a certain level of x-ray radiation or above from the air, this method starts to generate a ACQ_START signal to indicate the timing for image acquisition starting from digital image acquisition system. Hence, when it starts to detect under certain level of x-ray signal from the air, this method starts to generate a ACC_END signal to indicate the timing for image acquisition stop from digital image acquisition system. Image acquisition is activated only this time between ACQ_START and ACQ_END signal. By doing this wireless detecting of x-ray signal from remote, we can get more accurate timing for capturing the x-ray image and any type of x-ray generator can be connected to digital image acquisition system, regards of wired protocol. This makes easy installation. We could get 3.5 line pair / mm resolution at 20 mAs of x-ray level with resolution chart. This is same or better image comparing to conventional wired result.

  • PDF

Acquisition Strategy for Constructing Local Archives: The Case of Busan Sanbokdoro Archives (마을 아카이브 구축을 위한 수집 전략 - 부산 산복도로 아카이브 사례를 중심으로 -)

  • Kim, Hwa-Kyoung
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.12 no.2
    • /
    • pp.143-161
    • /
    • 2012
  • In this study, the local archives suggested that consideration should be given to creating your strategy to the corridors of the local archives to Busan Sanbokdoro to build a acquisition of strategies to establish. First, the role of the local archives and organize the vision and goals of the Sanbokdoro archives. The residents of the region from the Sanbokdoro archives depending on the vision of the life orientation commands queue for archiving documentation strategies and acquisition plans were introduced. Sanbokdoro archives for specific topics, events, places, and so on, gather for a specific acquisition strategy and operating program through acquisition activities after the opening of the archives is to establish measures to acquisition the General acquisition.

A Plan for Building up the Rational Defense Acquisition System (합리적 국방획득체계 구축을 위한 방안)

  • Kim, Jong-Ha
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.2
    • /
    • pp.15-31
    • /
    • 2009
  • This paper examines several inefficient problems generated from a management process of defense acquisition system, and suggests several alternatives to remedy the current acquisition-related problems. This might help MND to reform the current DAPA's acquisition system. The offered elements are to, first, redefine function of mid-term plan & budget allocation between MND and DAPA, second, devise economic acquisition management and force development to build integrated management system of requirement-acquisition-operation & maintenance, third, build Workforce Management Act(WMA) and Professional Education System(PES) for strengthening expertise and institutionalizing manpower rotation of requirements & acquisition-related fields, fourth, implement weapon systems' Total Life Cycle Systems Management(TLCSM) and improve developmental & operational test and evaluation. These are essential elements in minimizing confusion & conflict emanating from surrounding acquisition program among MND-DAPA-Each Services.

The Effect of Knowledge Acquisition through OntoRule: XRML Approach (온톨로지를 활용한 자동화된 지식 습득 방법론 및 효과 분석)

  • Park, Sang-Un;Lee, Jae-Kyu;Kang, Ju-Young
    • Journal of Intelligence and Information Systems
    • /
    • v.11 no.2
    • /
    • pp.151-173
    • /
    • 2005
  • We developed a methodology of rule acquisition from texts such as Web pages which utilizes ontology in identification of rule components. We expect that the proposed methodology can reduce the bottleneck of rule acquisition and contribute to the utilization of rule based systems. As parts of our research, we designed an ontology for rule acquisition named OntoRule and proposed a rule acquisition methodology through OntoXRML which is an acquisition tool using OntoRule. Also, we evaluated our approach by calculating missed recommendations and wrong recommendations of rule components in rule acquisition experiments over three online bookstores.

  • PDF

The Study of Strategies for acquisition of moving object location

  • Min, Kyoung-Wook;Jang, In-Seung;Park, Jong-Hyun
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.111-116
    • /
    • 2002
  • The types of service using location Information are being various and extending it's domain as wireless internet technology is developing and it's application part is widespread, so it is prospected that LBS (Location-Based Services) will be killer application in wireless internet services. This location information is basic and high value-added information, and this information services make prior GIS (Geography Information System) to be useful to anybody. The acquisition of this location information from moving object is very important part for these LBS. After this, when LBS is familiar to everybody, we can predict that LBS system load is so heavy for the acquisition of so many subscribers and vehicles. Moving object database (MODB) system manages objects like subscribes and vehicles that are moving and have telecommunication terminal checked one's location. MODB is consists of 4 part, moving object location acquisition part, moving object location storage part, moving object query processing part, and moving object application p art. In this MODB system, acquisition of moving object location part must provide guarantee location information as well as reduce telecommunication overhead. In this paper, we study of problems in acquisition a huge number o f moving objects location and design some acquisition strategies to reduce telecommunication overhead. And after implementation these strategies, we estimate performance of this system and quality of information.

  • PDF

RESEARCH OF COMMUNICATION SCHEDULING BETWEEN COMPUTER I/O AND S/W FOR ACQUISITION OF SATELLITE SENSORED DATA

  • Koo, Cheol-Hea;Park, Su-Hyun;Kang, Soo-Yeon;Yang, Koon-Ho;Choi, Sung-Bong
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.196-199
    • /
    • 2006
  • Various communication mechanisms have been developed to acquire a meaningful data from sensors. The key requirement during the sensor data acquisition is determinism and reduction of time dependency. It is a fundermental level of satellite data management for controlling satellite operation software data acquisition from sensors or subsystem. Satellite operation software has various software modules to be operated in addition to data acquisition. Therefore, unnecessary time delay shall be minimized to perform the data acquisition. As the result, interrupt method might be prefered than polling method because the former can decrease the restriction of design during implementation of data acquisition logic. The possible problems while using interrupt method like as interrupt latency caused by delaying of interrupt processing time are analyzed. In this paper, communication mechanism which can be used to interface with satellite computer and subsidary subsystem by using interrupt is presented. As well, time dependency between software scheduling and data acquisition is analyzed.

  • PDF

The Effects of Training on Chemical Problem-Solving Learning (연습이 화학문제 해결에 미치는 효과)

  • Lee, Myung-Ja;Kim, Mi-Young;Lee, Jin-Hee
    • Journal of The Korean Association For Science Education
    • /
    • v.16 no.3
    • /
    • pp.295-302
    • /
    • 1996
  • The purpose of this study was to investigate the effects of training and use of worked-example on chemical problem-solving learning. Schema acquisition and rule automation are the basic components of skilled problem-solving, which are dependent on appropriately focused attention and sufficient cognitive resources. Training and use of worked-example facilitate schema acquisition and rule automation, so improve problem-solving learning. The subjects of this study were 60 high school students. The average age was 17 years old. Then, they were randomly assigned to each groups and the chemical reaction problems used as experimental materials. The independent variables of this study were training and use of worked-examples and dependent variables were time for solution and the number of error. The results of this study were as follows; 1. The worked-example groups spent significantly less time on solution for acquisition problems than the conventional problem groups. 2. The long-acquisition groups spent significantly less time on solution for acquisition problems than the short-acquisition groups. 3. The modified worked-example groups did not spend significantly less time on solution for acquisition problems than the worked-example groups.

  • PDF