• Title/Summary/Keyword: a feasibility study

Search Result 6,130, Processing Time 0.034 seconds

Technical Feasibility Study on Live-line Maintenance Robot System for Overhead Distribution Lines (가공 배전선로 활선 정비 로봇 시스템의 기술 타당성 검토)

  • Joon-Young, Park;Yoon-Geon, Lee;Young-Sik, Jang
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.49-53
    • /
    • 2022
  • The distribution live-line work method is an operation method of working in a state in which electricity flows through overhead distribution lines to minimize inconvenience to electric customers due to power failure. In June 2016, to strengthen the safety of electrical workers, Korea Electric Power Corporation announced that it would in principle abolish the rubber glove method, in which workers wore protective equipment such as rubber gloves and performed their maintenance work. In addition, KEPCO announced that it would develop a short-range live working method using smart sticks and an advanced live-line maintenance robot system where workers work without touching wires directly. This paper is a preliminary study for the development of the live-line maintenance robot system, and deals with the results of analyzing the technical feasibility of whether the live works performed by workers can be replaced by robots or not.

A Case Study for the Economic Feasibility Model and Analysis of a GDHS Given Geothermal Temperature (기대지열온도하에서 GDHS의 경제성분석 사례연구)

  • Yang, Moon-Hee;Kim, Tai-Yoo;Lee, Sang-Kyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.1
    • /
    • pp.115-127
    • /
    • 1997
  • A GDHS(Geothermal District Heating System) is a heating system supplying a group of districts with heat extracted from geothermal sources. The advantages of GDHS include saving fuel consumption as well as reducing air pollution. This paper presents a case study for the economic feasibility model and analysis of a GDHS with which central/individual heating systems are replaced. Configuring to a simplified GDHS which consisits of subsurface systems, surface systems, and transmission/distribution systems, we find out the properties of the system and the model parameters affecting the initial investment/operating costs in order to develop a classical economic feasibility model given geothermal temperature. Based on our model parameter space, we analyzed the geothermal development project of the Jejoo Island probabilistically given prior information such as the expected geothermal power, the demand size and the length of transmission/distribution pipes.

  • PDF

Feasibility test for dynamic gait of quadruped walking robot (4각 보행로봇의 동적 걸음새 평가)

  • 김종년;홍형주;윤용산
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.14 no.6
    • /
    • pp.1455-1463
    • /
    • 1990
  • In this study the feasibility of a dynamic gait for a given quadruped walking robot is investigated through a computer simulation of the walking with certain drivings of the actuators. Two planar inverted pendulums are used to represent the dynamic model of the leg of the walking robot. It's gait motion is assumed to be periodic and symmetric between left and right sides only with half cycle delay. The dynamics of the walking robot is simplified by introducing two virtual legs to produce two planar inverted pendulums in two orthogonal planes and on the basis that certain legs in pair act as one. The feasibility of the dynamic gait motion is established from the following two necessary conditions:(1) The position and velocity of a foot must satisfy the stroke and velocity requirements.(2) The gait motion should be periodic without falling down. The gait feasibility test was applied to a walking robot design showing the specific acceptable speed range of the robot in trot. Also it showed that the higher body height may produce the faster trot gait.

Feasibility and Acceptability of Workers' Health Surveillance for Fire Fighters

  • Plat, Marie-Christine J.;Frings-Dresen, Monique H.W.;Sluiter, Judith K.
    • Safety and Health at Work
    • /
    • v.2 no.3
    • /
    • pp.218-228
    • /
    • 2011
  • Objectives: The objective of this study was to test the feasibility and acceptability of a new workers' health surveillance (WHS) for fire fighters in a Dutch pilot-implementation project. Methods: In three fire departments, between November 2007 and February 2009, feasibility was tested with respect to i) worker intent to change health and behavior; ii) the quality of instructions for testing teams; iii) the planned procedure in the field; and iv) future WHS organisation. Acceptability involved i) satisfaction with WHS and ii) verification of the job-specificity of the content of two physical tests of WHS. Fire fighters were surveyed after completing WHS, three testing teams were interviewed, and the content of the two tests was studied by experts. Results: Feasibility: nearly all of the 275 fire fighters intended to improve their health when recommended by the occupational physician. The testing teams found the instructions to be clear, and they were mostly positive about the organisation of WHS. Acceptability: the fire fighters rated WHS at eight points (out of a maximum of ten). The experts also reached a consensus about the optimal job-specific content of the future functional physical tests. Conclusion: Overall, it is feasible and acceptable to implement WHS in a definitive form in the Dutch fire-fighting sector.

Feasibility study of the energy supply system for horticulture facility using dynamic energy simulation (동적 에너지 시뮬레이션을 이용한 시설원예용 에너지 공급시스템의 경제성 분석)

  • Yu, Min-Gyung;Cho, Jeong-Heum;Nam, Yujin
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.103-109
    • /
    • 2015
  • Recently, the usage of renewable energy system has been recommended because of the energy saving and depletion of fossil fuel. Especially, ground source heat pump system(GSHP) has a high efficiency by using annual stable ground temperature. Also, wood pellet is low cost and a high calorific value compared to fossil fuel. However, only small number of farms have applied renewable energy system to horticultural facility because of a high initial costs and uncertainty of its cost efficiency. In this study, in order to analyze the feasibility for the horticulture, TRNSYS simulation based on the standard horticultural facility was conducted in different weather and covering material conditions. Then, comparative feasibility analysis of each energy supplying system was conducted. As a result, we have found out that a high initial cost of renewable energy system was recovered by the economics of the energy cost. Due to the energy cost reduction, the payback periods were 10-11 years in the case of GSHP and 4-6 years in the case of wood pellet boiler.

Trick or Treat? Equity Concerns in the Preliminary Feasibility Study of the Republic of Korea

  • LEE, JONGYEARN
    • KDI Journal of Economic Policy
    • /
    • v.42 no.4
    • /
    • pp.91-116
    • /
    • 2020
  • As a project appraisal tool, the preliminary feasibility study (PFS) has contributed to enhancing the efficiency of public investment decision-making in the Republic of Korea over the last two decades. To overcome the limitations of the efficiency-oriented cost-benefit analysis, the PFS accommodates equity concerns among regions, namely balanced regional development (BRD) analysis. This study attempts to gauge the contributions of BRD analysis to PFS results. Specifically, it addresses how effectively policy efforts to promote decision-making have been implemented in the PFS stage while also considering the balance between equity and efficiency in terms of the trade-off between them, the degree to which they influence the results, and whether the consideration of equity is in fact actually reflected in seriously underdeveloped regions as intended. The study finds that the PFS results over the last two decades have been largely in line with the background and policy objectives. Based on the findings of the study, needs for institutional improvement are suggested, including enhancements in the analysis of regional economic ripple effects and taking into account the psychological factors pertaining to the evaluators in the overall judgment.

A study on the status and improvement of preliminary feasibility study of culture and tourism projects (문화.관광부분사업의 예비타당성조사 실태분석 및 개선방안 연구 -운용관리비용 분석을 중심으로-)

  • Sun, Shu-Li;Kim, Ju-Hyung;Shin, Sung-Wooi;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.129-138
    • /
    • 2007
  • According to the preceding research outcomes, feasibility studies on public construction projects were incorrect and subjective. To resolve the problems, Korean government initiated Preliminary Feasibility Study (PFS) system prior to undertaking the main feasibility study. The PSF can be categorized into four areas such as road, railroad, harbor, airport, and Culture & Tourism (C&T). Especially when it comes to complex due to the introduction of five-weekday working system and local $government^{\circ}{\phi}s$ self administrative system. As a result, the standardization and legislation of the PSF can not be operated effectively. Accordingly this paper seeks to 1) identify actual condition of conducted PSF in C&T; 2) set up analytical model considering cost factor of economical efficiency and seek obstacles of PSF system; 3) suggest improvement plan for construction PSF projects.

Valuation of Public Data Using Stated Preference Method: The Case of Agriculture Soil Database (진술선호방법을 이용한 공공 데이터의 가치 평가: 농업토양정보 데이터베이스 사례)

  • Lee, Sang-Ho;Ha, Sung-Ho;Jeong, Ki-Ho
    • The Journal of Information Systems
    • /
    • v.27 no.4
    • /
    • pp.149-165
    • /
    • 2018
  • Purpose As Korean economy has been sluggish in recent years, firms' interest in publicly financed projects has increased due to the relatively increasing proportion in the economy. Since 1999, publicly financed projects in Korea need to undergo preliminary feasibility study to evaluate economic efficiency and policy quality if they are larger than a certain scale. The benefits of public projects are one of the most important factors in the preliminary feasibility study but are difficult to estimate due to their nature. Design/methodology/approach This study estimates the benefits of the agricultural soil information database, a public database in Korea. The method used in the study is the stated preference method which is formally used in Korea's preliminary feasibility study. Data are collected through surveys and a logit model is constructed to be estimated by the maximum likelihood estimation method. Findings As the first study evaluating a public database, this study can be used as a baseline in all public database projects developed in the future. In addition, this study can contribute to improving the understanding of both private companies and public organizations who are interested in the cost-benefit analysis and estimation procedure for the publicly financed projects.

Development of Beam-Column Connection for The New Apartment Structural System (장수명 공동주택용 보-기둥 접합부 시공방법 개발)

  • Yoon, Tae-Ho;Hong, Won-Kee;Kim, Sun-Kuk;Park, Seon-Chee;Yun, Dai-Young
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.145-151
    • /
    • 2010
  • Bearing wall system was used extensively in most multi-residential apartment buildings in Korea. However, bearing wall apartments have the lack of architectural plan flexibility, remodelling-incompatible, causing serious economic losses in terms of construction waste. Recently, many researchers have studied the use of Rahmen structure as a potential alternative. The beam-column connection in the paper for long-life apartment housing forms connection of a Rahmen structure utilizing the advantages of steel and reinforced concrete. In addition, reduction of cast-in place concrete and construction schedule is expected by using precast concrete. Reduction effect of quantity decreased construction costs and $CO_2$ emission of key construction materials. However, verifying the feasibility of new construction method entails numerous challenges. Accordingly, the purpose of this study is to analyze the construction feasibility of sleeve, coupler, and pressure welding connections for long-life apartment building structure. A 3D modeling software was used to perform the analysis, and a real scale model was created to verify the results of construction feasibility. By verifying the construction feasibility of beam-column connections, this study will contribute to the efficient application of these methods on construction sites.

Feasibility Study of Superconducting Fault Current Limiter Application to Korean Power System

  • Kim, Hak-Man;Kim, Jong-Yul
    • Progress in Superconductivity and Cryogenics
    • /
    • v.5 no.1
    • /
    • pp.103-106
    • /
    • 2003
  • The short circuit current problem is one of the operational problems that need to be solved by power system engineers in Korea. It is an important issue in the Seoul metropolitan area especially because of highly meshed configuration. Currently, it is regulated by changing 154 kV system configuration from loop connection to radial system, by splitting of the bus where load balance can be achieved, and by upgrading circuit breaker rating. A development project for 154 kV/2 KA SFCL application to 154 kV transmission system after 2010 is proceeding. In this paper, a feasibility study of superconducting fault current limiter (SFCL) is carried out in Seoul metropolitan area to find out the effects of its application and feasibility. This study shows that it can reduce fault current considerably, and as it can minimize the upgrading of circuit breaker rating, the economic potential of SFCL is evaluated positively.