Containment Filtered Vent Systems (CFVSs) have been mainly equipped in nuclear power plants in Europe and Canada for the controlled depressurization of the containment atmosphere under severe accident conditions. This is to keep the containment integrity against overpressure during the course of a severe accident, in which the radioactive gas-steam mixture from the containment is discharged into a system designed to remove the radionuclides. In Korea, a CFVS was first introduced in the Wolsong unit-1 nuclear power plant as a mitigation measure to deal with the threat of over pressurization, following post-Fukushima action items. In this paper, the overall features of a CFVS installation such as risk assessments, an evaluation of the performance requirements, and a determination of the optimal operating strategies are analyzed for the Wolsong unit 1 nuclear power plant using a severe accident analysis computer code, ISAAC.
Zhi Zheng;Yong Wang;Shuai Huang;Xiaolan Pan;Chunyang Su;Ye Sun
Nuclear Engineering and Technology
/
제55권6호
/
pp.2053-2068
/
2023
Following a loss of coolant accident (LOCA), prestressing concrete containment vessels (PCCVs) may experience high thermal load as well as internal pressure. The high temperature stress would increase the risk of premature damage to the containment, which reduces the safety margin during the increasing internal pressure. However, current investigations cannot clearly address the issues of thermal-pressure coupling effect on damage propagation and thus safety of the containment. Thus, this paper offers three simple and powerful damage parameters to differentiate the severity of damage of the containment. Moreover, despite of the temperature action severely threatening the pressure performance of the containment, the research regarding the improvement of the resistant performance of the containment is quite scarce. Therefore, in this paper, a comprehensive comparison of damage propagation and mechanism between conventional and fiber-reinforced concrete (FRC) containments is performed. The effects of fiber characteristics parameters on damage propagation of structures following the LOCA are also specifically revealed. It is found that the proposed damage indices can properly indicate state of damage in the containment body and the addition of fiber can be used to obviously mitigate the damage propagation in PCCV considering the thermal-pressure coupling.
Dehjourian, Mehdi;Rahgoshay, Mohammad;Sayareh, Reza;Jahanfarnia, Gholamreza;Shirani, Amir Saied
Nuclear Engineering and Technology
/
제48권4호
/
pp.975-981
/
2016
The containment response during the first 24 hours of a low-pressure severe accident scenario in a nuclear power plant with a two-loop Westinghouse-type pressurized water reactor was simulated with the CONTAIN 2.0 computer code. The accident considered in this study is a large-break loss-of-coolant accident, which is not successfully mitigated by the action of safety systems. The analysis includes pressure and temperature responses, as well as investigation into the influence of spray on the retention of fission products and the prevention of hydrogen combustion in the containment.
This paper presents a new approach to the evaluation of an accident management strategy when an operator action is involved. This approach classifies the failure in implementing a given strategy into 4 possible mechanisms, and provides their corresponding quantification methods : 1) the failure to formulate correct intention by operators, 2) the failure to take an adequate action following a correct diagnosis, 3) the failure of a system operation following an adequate action, and 4) the failure due to a delayed action. The proposed method was applied to assess a cavity flooding strategy that uses containment spray system (CSS), and the result shows that the method is more appropriate in evaluating accident management strategies when human action is involved.
In this study, we conducted a pilot study on the multiple spurious operations (MSO) analysis in the fire probabilistic safety assessment (PSA) of domestic nuclear power plant (NPP) to identify the degree of influence of the operator actions used in the MSO mitigation strategies. The MSO scenario of the domestic reference NPP selected for this study is refueling water tank (RWT) drain down event. It could be caused by spurious operations of the containment spray system (CSS) of the reference NPP. The RWT drain down event can be stopped by the main control room (MCR) operator actions for stopping the operation of CSS pump or closing the CSS motor operated valve if the containment spray actuation signal (CSAS) is spuriously actuated. Outside the MCR, it can be stopped by operator actions for closing the CSS manual valves or motor operated valve or stopping the operation of CSS pump. The quantification result of a fire PSA model that takes into account all recovery actions for the RWT drain down event lead to risk reduction by about 95%, compared with quantification result of fire PSA model without considering them. Among the various operator actions, the recovery action for the spurious CSAS operations and the operator action for the manual valve are identified as the most important operator actions. This study quantitatively showed the extent to which the operator actions used as MSO countermeasures have affected the fire PSA quantification results. In addition, we can see the rank of importance among the operator recovery actions in quantitative terms.
Reinforced polyurethane foam (RPUF) is one of the important materials of Mark III type insulation systems used in liquefied natural gas (LNG) cargo containment systems. However, RPUF is the most difficult material to use with regard to its safety assessment, because there is little public and reliable data on its mechanical properties, and even some public data show relatively large differences. In this study, to investigate the structural response of the system under compressive loads such as sloshing action, time-dependent characteristics of RPUF were examined. A series of compressive load tests of the insulation system including RPUF under various temperature conditions was carried out using specimens with rectangular section. As a result, the relationship between deformation of RPUF and time is linear and dependent on the loading rate, so the concept of strain rate could be applied to the analysis of the insulation system. Also, we found that the spring constant tends to converge to a value as the loading rate increases and that the convergence level is dependent on temperature.
엔터프라이즈 네트웍의 크기가 커지고 그 관리 범위가 넓어짐에 따라 분산 망 관리 시스템의 수용을 요구하게 되었고 또한 표준 프레임웍들간의 상호 연결 및 작용이 필요하게 되었다. 이 논문에서는 네트웍 관리 프레임웍인 SNMP도메인과 분산 객체 기술의 하나인 CORBA도메인간의 통합 관리를 위한 구현 방안을 제시한다. 표준에서 사용하는 직접 변환은 객체 지향적인 특성을 표현하고 있지 않으며, action을 위한 속성의 정의가 다른 속성과 구별되지 않는 등의 한계를 지니고 있다. 이러한 한계점은 추상적 변환 방법을 통해 새로운 클래스의 정의, 명확한 메쏘드 정의라는 방법으로 충분히 극복될 수 있다. 직접 변환의 편리함과 추상적 변환의 효율적인 관리 정보의 구축이라는 장점을 이용한 직접 변환과 추상적 변환의 혼용을 통한 정보 모델 변환 방법을 이용한 게이트웨이의 개발 방법을 제시한다. 이러한 통합 관리 시스템 구축은 CORBA/SNMP 간의 효율적인 통합 관리를 제공한다.
To prevent major cracking and failure during earthquakes, it is important to design reinforced concrete liquid storage structures, such as water and fuel storage tanks, properly for the hydrodynamic pressure loads caused by seismic excitations. There is a discussion in recent Codes that most of the base shear applied to liquid containment structures is resisted by inplane membrane shear rather than by transverse flexural shear. The purpose of this paper is to underline the importance of the membrane force system in carrying the base shear produced by hydrodynamic pressures in both rectangular and cylindrical tank structures. Only rigid tanks constrained at the base are considered. Analysis is performed for both tall and broad tanks to compare their behavior under seismic excitation. Efforts are made to quantify the percentage of base shear carried by membrane action and the consequent procedures that must be followed for safe design of liquid containing storage structures.
인간의 화석연료 사용, 도시화, 경작 등으로 인해 온실가스의 농도는 계속 증가하여 기후변화가 나타나고 있는 추세이다. 이로 인해 20세기는 재난의 발생이 돌발적이고 대형화되고 있으며, 피해 규모 역시 점차 증가하는 실정이다. 따라서 과거와 다른 양상의 신종 재난에 대해 국토를 보존하고 국민의 생명과 재산을 보호하기 위해서는 재난탐지위성(탑재체) 개발이 시급히 요구된다. 본 논문에서는 불규칙한 미래재난에 대해 광역적이고, 한국지형에 최적화된 재난 관측과 재난발생 시 신속한 선제 대응을 위한 기술개발 연구를 수행하고자 한다. 이를 위해 재난 탐지 특화 탑재체 설계를 위해 10개의 재난 유형별 위성영상 활용 사례를 바탕으로 테크트리를 작성하고 국외의 유사 활용위성센서인 Landsat-8, Worldview-3, ALOS-2를 참고하여 재난탐지에 최적화된 위성 센서 기술요구조건을 분석하였다.
Molten corium-concrete interaction (MCCI) is one of the most important phenomena that can lead to the potential hazard of late containment failure due to basemat penetration during a severe accident. In this study, MCCI analytical models of the CORQUENCH code were prepared through verification calculations of several experiments, which had been performed using concrete types similar to those of the calandria vault floor in CANDU-6 plants. The behaviors of thermal-hydraulic variables related to MCCI phenomena were analyzed under the conditions of dry floor and water flooding during the severe accident stemming from a hypothetic station blackout. Uncertainty analyses on the ablation depth were also carried out. It was estimated that the concrete ablation was not interrupted due to the continuous MCCI process under the dry condition but was terminated within 24 hours under the water flooding condition. It was confirmed that the water flooding as a mitigating action was effective to achieve the quenching and thermal stabilization of the melt discharged from the calandria vessel, showing that the present models are capable of reasonably simulating MCCI phenomena in CANDU-6 plants. This study is expected to provide the technical bases to the accident management strategy during the late-phase severe accidents.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.