• Title/Summary/Keyword: Xe-Gas Target

Search Result 8, Processing Time 0.024 seconds

Design of I-123 Nuclide Production System (I-123 핵종생산장치 시스템 설계)

  • Jung, Hyun-Woo;You, Jae-Jun;Kim, Byung-Il;Lee, Dong-Hoon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.6
    • /
    • pp.1462-1468
    • /
    • 2014
  • Xe gas is moved to target from GPM. It is used to feasible nuclear reaction from proton of 30MeV cyclotron being investigated by the Xe-124 gas target system. This system is divided into four parts. The hardware system was constructed by solidworks 3-D CAD and Helium supply is to cool the Havor foil. The Cooling water has the job of cooling down the temperature when Xe gas is being investigated in the target. Temperature and pressure gauges are attached to be checked easily. GPM has the part that prepares to transport Xe gas. There are storage vessel that stores Xe gas, the cold trap that filters humidity and impurity and lastly storage vessel that temporarily stores Xe gas. HCS using the helium is to clean and cool for each part. These parts are configured with SIEMENS PLC and PcVue monitoring program for more comfortable and easy maintenance.

Design of I-123 Nuclide production system (I-123 핵종생산장치 시스템 설계)

  • Jung, Hyun-Woo;You, Jae-Jun;Kim, Byung Il;Chun, KwonSoo;Lee, Ji-Seub;Park, Hyun;Choi, JunYong;Oh, Se-Young;Bang, Sang-Kwon;Lee, Dong Hoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.496-499
    • /
    • 2014
  • Xe Gas is moved to Target from GPM. It is Used to feasible nuclear reaction from proton of 30MeV Cyclotron being investigated by the Xe-124 Gas target System. This system is divided into four parts. Hardware was constructed by solidworks and Helium Supply is to cool the Havor Foil. Water has the job of cooling down the temperature when Xe Gas is being investigated in the target. Temperature and pressure gauges are attached to be checked easily. GPM(Gas Process Manifold) has the part that prepares to transport Xe Gas. There are Storage Vessel that stores Xe Gas, the cold trap that filters humidity and impurity and lastly storage vessel that temporarily stores Xe Gas. HCS(Helium Circulation System) using the Helium to cleaning and cooling. these parts are used to SIEMENS PLC and Pcvue Program. Because It is more comfortable and easy maintenance.

  • PDF

Prediction of 123I production using the monte Carlo code MCNPX (몬테 칼로 전산코드 MCNPX를 이용한 I-123 생산량 예측)

  • Yoo, Jae jun;Kim, Gyehong;Kim, Byung il;Lee, Donghoon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.816-818
    • /
    • 2014
  • Gas target chamber has been developed for producing $^{123}I$ which is radiopharmaceuticals for diagnosis of thyroid cancer, and modeled how to occur nuclear reaction between chamber and $^{124}Xe$ with energy 30MeV inside the gas target chamber by using the MCNPX. The beam energy was lost as the beam spread when beam hit inside the gas target chamber. The cooling water was used not to change the gas target chamber as loss of energy transfer to the thermal energy. Spiral cooling line was designed for cooling the target chamber efficiently. By using the c30 cyclotron, $^{124}Xe(p,2n)$, $^{124}Xe(p,n)$, $^{124}Xe(p,pn)$ nuclear reactions were studied. In this study, we predict the production yield.

  • PDF

The Study on the MgO thin film prepared by magnetron sputtering and its electrical characteristics (스파트링 방법으로 제작된 MgO와 그 전기적 특성에 관한 연구)

  • 박정후;조정수;박명호
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 1997.07a
    • /
    • pp.169-172
    • /
    • 1997
  • MgO dielectric pprotection layer is ppreppared by R.F. reactive magnetron spputtering with Mg target under various conditions of spputtering ppressure, time and substrate tempperature. Discharge characteristics of ppDpp is also studied as a pparameter of MgO pprepparation conditions. As the working ppressure and substrate tempperature was increase, the discharge voltage was decreased. Two kinds of MgO ppreppared both spputtering and E-beam methods were stable after annealing at 35$0^{\circ}C$ for 120min. discharge voltage under 3 mixed gas(He+Xe0.2%+Ne30%) was V=130V, V=102V and ${\gamma}$ coefficient was twiced as much as that of dielectric layer.

  • PDF

Factors Affecting the Minimum Detectable Activity of Radioactive Noble Gases (방사성 노블가스 측정을 위한 최소검출방사능 산출의 조절인자)

  • Park, Ji-young;Ko, Young Gun;Kim, Hyuncheol;Lim, Jong-Myoung;Lee, Wanno
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.3
    • /
    • pp.301-308
    • /
    • 2018
  • Anthropogenic radioactive noble gases formed by nuclear fission are significant indicators used to monitor the nuclear activity of neighboring countries. In particular, radioactive xenon, owing to its abundant generation and short half-life, can be used to detect nuclear testing, and radioactive krypton has been used as a tracer to monitor the reprocessing of nuclear fuels. Released radioactive noble gases are in the atmosphere at infinitesimal amounts due to their dilution in the air and their short half-life decay. Therefore, to obtain reliable and significant data when performing measurement of noble gases in the atmosphere, the minimum detectable activity (MDA) for noble gases should be defined as low as possible. In this study, the MDA values for radioactive xenon and krypton were theoretically obtained based on the BfS-IAR system by collecting both noble gases simultaneously. In addition, various MDA methods, confidence level and analysis conditions were suggested to reduce and optimize MDA with an assessment of the factors affecting MDA. The current investigation indicated that maximizing the pretreatment efficiency and performance maintenance of the counter were the most important aspects for Xe. In the case of Kr, since sample activities are much higher than those of Xe, it is possible to change the target MDA or to simplification of the analysis system.

A Study on the Sputtering-resistant Properties of MgO Thin-film in the AC Plasma Display Panel (PDP) (AC Plasma Display Panel (PDP)에서 MgO 박막의 내스퍼터성에 관한 연구)

  • Ji, Seong-Won;Yeo, Jae-Yeong;Lee, U-Geun;Jo, Jeong-Su;Park, Jeong-Hu
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.48 no.5
    • /
    • pp.361-366
    • /
    • 1999
  • The life of AC PDP depends largely on the sputtering-resistant property of the protecting layer such as MgO thin-film. However, it is very difficult to measure the sputtering-resistant property in the stable driving conditions of AC PDP. In this paper we have suggested a high speed measurement technique of the sputtering-resistant property of MgO thin-film by applying the MgO thin-film as the target of RF magnetron sputtering system. We have also applied this method to the e-beam MgO and sputter-MgO and e-beam MgO superior to sputter-MgO 3 times over. Also, the relation of Xe gas partial pressure(X) and sputtered thickness(Y) was Y=3.4X+13.5.

  • PDF

Activation Reduction Method for a Concrete Wall in a Cyclotron Vault

  • Kumagai, Masaaki;Sodeyama, Kohsuke;Sakamoto, Yukio;Toyoda, Akihiro;Matsumura, Hiroshi;Ebara, Takayoshi;Yamashita, Taichi;Masumoto, Kazuyoshi
    • Journal of Radiation Protection and Research
    • /
    • v.42 no.3
    • /
    • pp.141-145
    • /
    • 2017
  • Background: The concrete walls inside the vaults of cyclotron facilities are activated by neutrons emitted by the targets during radioisotope production. Reducing the amount of radioactive waste created in such facilities is very important in case they are decommissioned. Thus, we proposed a strategy of reducing the neutron activation of the concrete walls in cyclotrons during operation. Materials and Methods: A polyethylene plate and B-doped Al sheet (30 wt% of B and 2.5 mm in thickness) were placed in front of the wall in the cyclotron room of a radioisotope production facility for pharmaceutical use. The target was Xe gas, and a Cu block was utilized for proton dumping. The irradiation time, proton energy, and beam current were 8 hours, 30 MeV, and $125{\mu}A$, respectively. To determine a suitable thickness for the polyethylene plate set in front of the B-doped Al sheet, the neutron-reducing effects achieved by inserting such sheets at several depths within polyethylene plate stacks were evaluated. The neutron fluence was monitored using an activation detector and 20-g on de Au foil samples with and without 0.5-mm-thick Cd foil. Each Au foil sample was pasted onto the center of a polyethylene plate and B-doped Al sheet, and the absolute activity of one Au foil sample was measured as a standard using a Ge detector. The resulting relative activities were obtained by calculating the ratio of the photostimulated luminescence of each foil sample to that of the standard Au foil. Results and Discussion: When the combination of a 4-cm-thick polyethylene plate and B-doped Al sheet was employed, the thermal neutron rate was reduced by 78%. Conclusion: The combination of a 4-cm-thick polyethylene plate and B-doped Al sheet effectively reduced the neutron activation of the investigated concrete wall.