At present the under ground power transmission systems have installed until 154KV XLPE power cable in Korea But, the large capacity underground power transmission systems have been required gradually with the increasing demand of electric power. Therefore, our company has developed 345KV XLPE cable. This paper describes the estimate details of the insulation thickness according to weibull plotting for 345KV XLPE power cable.
Kim, J.W.;Kim, H.K.;Park, K.H.;Lee, K.H.;Choi, Y.H.
Proceedings of the KIEE Conference
/
1992.07b
/
pp.903-906
/
1992
At present the XLPE insulated power Cables have installed until 154KV level in KOREA. Therefore, our company has developed 275KV XLPE cable as a means 345KV level-up of CV cable as well as exploitation of overseas markets. In this paper, the outline of design standards, manufacturing processes and test performance of 275KV CV cable are described.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.16
no.5
/
pp.179-184
/
2016
The usual way used by electric power stations to deliver high levels of generated power is via 6.6kV XLPE (or CV) cables. Depending on the manufacturing technique, installation environment, and usage conditions, the deterioration processes of the power cables start from the instant of operation. Cable junctions may break down in three years from the start of operation due to the manufacturing or construction defects. Otherwise they should be in good working order for 20-30 years. When the cable system (the cable itself and cable junctions combined) deteriorates, fire accidents happen due to the dielectric breakdowns. We have invented a device to monitor the deteriorating status of cables at Korean Western Power Co. Ltd. located in Taean, Chungcheongnam-do province. In this paper, we introduce the device hardware. Using the device, we have measured the insulation resistance and humidity in the sheath of the cables. We present, in analysed results, the effect of humidity on insulation resistance in cable sheaths.
Kim Gyun-Sig;Kim Byung-Hyun;Jeong Hyeon-Ki;Cha Kwang-Seok
Proceedings of the KSR Conference
/
2005.11a
/
pp.712-717
/
2005
In this thesis, it is investigated that the effect of the cross linked polyethylene(XLPE) insulator do to breakdown phenomenon by the insertion of the needle and bar electrode into XLPE which is used of electric power cable for the ultra-high voltage. The result of the partial discharge properties in the specimen showed that in case of the insertion of needle or bar electrode into XLPE, the effect of the inner discharge become large when the air void is bigger then the clearance of the electrode of the specimen. The closer the distance between the insulator and needle electrode, it takes less time to the insulation breakdown.
We show results that examine about electrical properties of XLPE insulated 6.6kV cable termination by mechanical damage. The cable used to produce the cable termination is 6/10kV tray XLPE fire retardant electric cable (6/10kV TFR-CV $35SQMM{\times}1C$) which is domestically made. We apply force to XLPE insulator and made mechanical defect using knife. Defected samples go through the withstand voltage test according to the IEEE std. 48 test regulations and lighting impulse (hereunder, IMP) withstand voltage test regulations. Then the effects of the scars shown during the construction process on electric accidents at the end part are analyzed.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2010.06a
/
pp.86-86
/
2010
Recently, CV, CNCV, CNCV-W cable are used to transmit and distribute electric power. And a lot of researchers put more effort to realize high performance. The dielectric breakdown strength characteristic is a standard to design insulators. Examination of that is a main factor to determine long term insulation performance, which is used to diagnose Insulation deterioration. In this paper, we prepared XLPE, XLPE/nano-filler, LDPE/nano-filler for comparing each of the dielectric breakdown strength characteristics.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.17
no.1
/
pp.207-212
/
2017
The cables installed to deliver high electric power from a generator at a thermoelectric power station are XLPE (or CV) cables. Depending on the installation and usage conditions, the cables in operation start deteriorating from the time of initial operation. Some cables can cause accidents due to faulty construction or other environmental factors. In order to prevent cable accidents, regular auditing of power cables is required. We have invented a measuring device for systematic surveillance and prevention of accidents, and installed the device at Korean Western Power Co. Ltd. which measures load currents through the cables. In this paper, we present the load current measured using our device, analyze the load characteristics by measures current, compare the ampacity defined by IEC standard, and present a basic data to obtain the temperature of cable conductors.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.17
no.3
/
pp.189-195
/
2017
The only method used in the power stations in order to deliver generated electric power is 6 kV XLPE (or CV) single core cables. Among many kinds of accidents happening in the power stations, the outbreak of fire due to the deterioration of live cables causes enormous socioeconomic losses. From the installation of the cables, the management and diagnose should be thoroughly made. Even though it differs depending on the installations and usage conditions, the cross-sectional area of cables is in shortage. The excessive allowable temperature caused from the current causes the deterioration of cables. In order to prevent an unexpected breakdown of live cables, we have invented a device to monitor and diagnose the status of cables. We have installed our device in the Korea Western Power Co., Ltd.. In this paper, we present our research results in situ that we have obtained by measuring the temperature of sheath, changing with the surrounding circumstances, especially ambient temperatures. We also show our study results of characteristics for temperature of sheath surface and load current at the ambient temperatures of $40^{\circ}C-10^{\circ}C$.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.30
no.3
/
pp.53-58
/
2016
The underground transmission lines which have been built to expand the suppling facilities will be continuously accompanying with high growth of the increase of power demand in the metropolitan area in recent years. So, it is necessary to maximize the ability and reliability of power supply with the current-carrying capability of the underground transmission lines. Design criteria of KEPCO is to be presented and used frequently. But it has to be studied about the installation methods of power cable buried in ground. In this study, we used the program for calculating the current-carrying capability of underground transmission power cables. We estimated the maximum permissible current values by the horizontal arrangement in the installation methods of power cable(154kV XLPE $600mm^2$) buried ducts in ground. To see the general tendency of the analysis, we researched a statistical analysis with such parameters as the maximum permissible current values. Through the regression analysis, we analyze the most highly values of the maximum permissible current on the Ra type duct arrangement.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.16
no.5
/
pp.185-190
/
2016
The high-power 6.6 kV XLPE (or CV) cables at Korean electric power stations have been in operation for the last 40 years. Most of the XLPE cables starts deteriorating in 6-8 years from the operating instant of time, some cables may be breakdown at any moment even though they were installed in recent years, causing, huge socioeconomic losses. In order to prevent unexpected cable accident, the operating status of power cables should be monitored in regularly, timely bases. We have invented a device in order to systematically monitor and prevent an abrupt accidents of high-power cables in operation at power station. It has been installed at Korean Western Power Co. Ltd. at Taean, and operating normally for the last 4 years. In this paper, we introduce the functions and operating principles of the measuring device, and present the relationship between humidity and insulation status of XLPE cables for the load of electric turbine generator.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.