• Title/Summary/Keyword: Workspace Safety Management

Search Result 11, Processing Time 0.025 seconds

A SIMULATION MODEL FOR DECIDING AN OPTIMIZED 3D SHAPE OF CONSTRUCTION WORKSPACE CONSIDERING RESOURCES IN BIM ENVIRONMENT

  • Hyoun Seok Moon;Hyeon Seung Kim;Leen Seok Kang;Byung Soo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.163-168
    • /
    • 2013
  • A construction workspace is considered as a critical factor to secure constructability and safety of a project. Specially, optimized size of each workspace helps to minimize any conflicts between workspaces, works and resources within a workspace in the construction site. However, since an existing method for making a decision workspace's size depends on generally experiences of managers and work conditions of activity, it is difficult to perform safe works considering feasible workspace size. The workspace size is changed according to the quantity of resources allocated into each activity as time progresses. Accordingly, it is desirable that optimized workspace size considering input size of resources is determined. To solve these issues, this study configures an optimized model for deciding standard size of workspaces by simple regression analysis and develops a visualized scenario model for simulating the optimized workspace shape in order to support BIM (Building Information Modeling) environment. For this, this study determines an optimized resource shape size considering maximum working radius of each resource and constructs its visual model. Subsequently, input size of resources for each activity is estimated considering safety execution area of resources and workspaces. Based on this, an optimized 3D workspace shape is generated as a VR simulation model of a BIM system based on the suggested methodologies. Moreover, operational feasibility of the developed system is evaluated through a case study for a bride project. Therefore, this study provides a visualized framework so that project managers can establish an efficient workspace planning in BIM environment. Besides, it is expected that constructability, productivity and safety of the project will be improved by minimizing conflicts between workspace and congestions between resources within a workspace in the construction phase.

  • PDF

4D BIM based Workspace Planning Process in Building Construction Project (4D BIM 기반의 건설프로젝트 작업공간 계획 프로세스)

  • Choi, Byungjoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Hyunsoo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.175-187
    • /
    • 2013
  • Each participant in building construction project requires their own workspace to execute their activities. In this environment, inappropriate workspace planning in construction site causes workspace conflicts which result in a loss of productivity, safety hazard and poor-quality issues. Therefore, workspace should be regarded as one of the most important resources and constraints have to be managed at construction site. However, current construction planning techniques such as Gantt chart, network diagram and critical path method have proven to be insufficient to workspace planning. This paper contains formalized process for workspace planning in 4D BIM environment to prevent workspace related problems in construction project. The proposed process in this paper represents workspace occupation status for each activity and suitable solutions for identified workspace conflicts by integrating workspace attributes and activity execution plan. Based on the result of this study, project manager will be able to prevent probable workspace conflicts and negative effect on project performance by devising appropriate workspace plan during preconstruction phase.

RAPID GEOMETRIC 3D MODELING FOR AUTOMATED CONSTRUCTION EQUIPMENT

  • Jo, Yong-Gwon;Hass, Carl T.
    • Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.55-60
    • /
    • 2003
  • Unstructured workspaces which are typical in construction contain unpredicable activities as well as changing environments. Most automated and semi-automated construction tasks require real-time information about the local workspace in the form of 3D geometric models. This paper describes and demonstrates a new rapid, local area geometric data extraction and 3D visualization method for unstructured construction workspaces that combines human perception, simple sensors, and descriptive CAD models. The rapid approach will be useful in construction in construction in order to optimize automated equipment tasks and to significantly improve safety and a remote operator's spatial perception of the workspace.

Design and Implementation of Workspace Safety Management System based on RFID using Variable Radio Wave Oscillation (가변적 전파발진을 이용한 RFID기반 작업장 안전관리 시스템 설계 및 구현)

  • Min, So-Yeon;Lee, Kwang-Hyoung;Jang, Seung-Jae;Lee, Keun-Wang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.8
    • /
    • pp.3660-3669
    • /
    • 2011
  • Demands for systemized management of workers' safety systemically in construction sites have been increased. Industrial accidents at work places are often happened by risk factors of construction sites, and also it brings a lot of loss as the correct direction for workers about locations to work is not delivered properly. In this paper, a safety supervision system for construction sites is designed and implemented to figure out the location of workers accurately and to provide the information about the status of works and workers in real-time by personal device which is based on RFID. The system designed in this paper achieved high performance in its function and efficiency through a performance test, compared with existing analogous systems.

Development of the Maintenance Process Using Virtual Prototyping for the Equipment in the MSM's Unreachable Area of the Hot cell

  • Lee, Jong-Youl;Song, Tai-Gil;Kim, Sung-Hyun;Yoon, Ji-Sup
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1354-1358
    • /
    • 2003
  • The process equipment for handling high level radioactive materials like spent fuels is operated in a hot cell, due to high radioactivity. Thus, this equipment should be maintained and repaired optimally by a remotely operated manipulator. The master-slave manipulators(MSM) are widely used as a remote handling device in the hot cell. The equipment in the hot cell should be optimally placed within the workspace of the wall-mounted slave manipulator for the maintenance operation. But, because of the complexity in the hot cell, there would be some parts of the equipment that are not reached by the MSM. In this study, the maintenance process for these parts of the equipment is developed using virtual prototyping technology. To analyze the workspace of the maintenance device in the hot cell and to develop the maintenance processes for the process equipment, the virtual mock-up of the hot cell for the spent fuel handling process is implemented using IGRIP. For the implementation of the virtual mock-up, the parts of the equipment and maintenance devices such as the MSM and servo manipulator are modeled and assembled in 3-D graphics, and the appropriate kinematics are assigned. Also, the virtual workcell of the spent fuel management process is implemented in the graphical environment, which is the same as the real environment. Using this mock-up, the workspace of the manipulators in the hot cell and the operator's view through the wall-mounted lead glass are analyzed. Also, for the dedicated maintenance operation, the analyses for the detailed area of the end effectors in accordance with the slave manipulator's position and orientation are carried out. The parts of the equipment that are located outside of the MSM's workspace are specified and the maintenance process of the parts using the servo manipulator that is mounted in the hot cell is proposed. To monitor the process in the hot cell remotely, the virtual display system by a virtual camera in the virtual work cell is also proposed. And the graphic simulation using a virtual mock-up is performed to verify the proposed maintenance process. The maintenance process proposed in this study can be effectively used in the real hot cell operation and the implemented virtual mock-up can be used for analyzing the various hot cell operations and enhancing the reliability and safety of the spent fuel management.

  • PDF

A Study on the Awareness of Safety and Health for Practical Application of Risk Assessment in Construction Industries -Focused on Worker- (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choi, Soo Hwan;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.2
    • /
    • pp.60-65
    • /
    • 2013
  • On the basis of the guideline "2012-104(2012.9.26.)" notified by the ministry of employment and labor, this paper provided the baseline data and the improvement proposal in applying risk assessment to a construction site by group interview & survey of construction workers. The worker's awareness and action plan of safety and health were investigated by numerical analysis. From the result of group interview and the survey of construction workers, it was found that most of construction workers feel the danger during the work. The results also shows that risk assessment can help to change & raise the awareness of safety and to reduce the industrial disaster. In addition, simple safety management activity such as TBM & active education of safety will be necessary for safe workspace and the active TBT(tool box talk) which combines TBM & the education of safety will be also effective.

Development of the Maintenance Process Based on Graphic Simulation for the Parts of the Equipment at the outside of the MSM′s Workspace in a Hot Cell (그래픽 전산모사를 이용한 핫셀 사각지역 내 장치부품 유지보수공정 개발)

  • 이종열;김승현;송태길;박병석;윤지섭
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.1 no.1
    • /
    • pp.55-64
    • /
    • 2003
  • In this study, the maintenance process by the servo manipulator has been developed for the parts of the equipment, which we unable to reach out by the Master-Slave Manipulator(MSM) in a hot cell. To do this, a virtual mock-up is implemented using the iか prototyping technology. Using this mock-up, the workspace of the manipulators in the hot cell and the operator's view through the wall-mounted lead glass have been analyzed. In addition, the path planning of the servo manipulator using the collision detection function of the virtual mock-up has been established. From these, the maintenance process for the parts of the equipment, which are located at the outside of the MSM's workspace using the servo manipulator has been proposed and verified through the graphic simulation. It is revealed that the proposed remote maintenance process of the equipment can effectively be used in the real hot cell operation. It is also believed that the implemented virtual mock-up of the hot cell can effectively be applied in analyzing the various hot cell operation and enhancing the reliability and safety in a hot cell remote handling for the spent fuel management.

  • PDF

Development of the Maintenance Process by the Servo Manipulator for the Parts of the Equipment outside the MSM′s Workspace in a Hot Cell (소형 고하중 조작기를 이용한 사각지역 내 장치부품 보수공정 개발)

  • 이종열;김성현;송태길;박병석;윤지섭
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.337-344
    • /
    • 2003
  • In this study, the maintenance process by the servo manipulator for the parts of the equipment that cannot be reached by MSM in the hot cell was developed. To do this, the virtual mock up is implemented using virtual prototyping technology. And, Using this mock-up, the workspace of the manipulators In the hot cell and the operator's view through the wall-mounted lead glass are analyzed. And the path planning of the servo manipulator using the collision detection of the virtual mockup is established. Also, the maintenance process for the parts of the equipment that are located out area of the MSM's workspace by the servo manipulator is proposed and verified through the graphic simulation. The proposed remote maintenance process of the equipment can be effectively used in the real hot cell operation. Also, the implemented virtual mock-up of the hot cell can be effectively used in analyzing the various hot cell operation and in enhancing the reliability and safety of the spent fuel management.

  • PDF

3D Spatial Information Acquisition for Construction Operation and Maintenance on a Construction Site (효율적인 건설공사와 유지관리를 위한 건설현장에서의 3차원 공간 정보 획득)

  • Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.188-193
    • /
    • 2004
  • 3D spatial-modeling can be used in various safety-enhancement applications and for as-built data acquisition in project-control systems. The objective of the research reported herein was to provide spatial-modeling methods that represent construction sites in an efficient manner and to validate the proposed methods by testing them in an actual construction environment. Algorithms to construct construction-site scenes and to carry out coordinate transformations in order to merge data from different acquisition locations are presented. Field experiments were conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.

  • PDF

"MODEL SPELL CHECKER" FOR PRIMITIVE-BASED AS-BUILT MODELING IN CONSTRUCTION

  • Kwon Soon-Wook;Frederic Bosche;Huh Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.163-171
    • /
    • 2004
  • This research investigates a Modeling Spell Checker that, similarly to Word Spell Checker for word processing software, would conform as-built 3D models to standard construction rules. The work is focused on the study of pipe-spools. Specifically pipe diameters and coplanarity are checked and corrected by the Modeling Spell Checker, and elbows are deduced and modeled to complete models. Experiments have been conducted by scanning scenes of increasing levels of complexity regarding the number of pipes, the types of elbows and the number of planes constituting pipe-spools. For building models of pipes from sensed data, a modeling method, developed at the University of Texas at Austin, that is based on the acquisition of sparse point clouds and the human ability to recognize geometric shapes has been used Results show that primitive-based models obtained after scanning construction sites can be corrected and even improved automatically, and, since such models are expected to be used as feedback control models for equipment operators, the higher modeling accuracy achieved with the Modeling Spell Checker could potentially increase the level of safety in construction. Result also show that some improvements are still needed especially regarding the co-planarity of pipes. In addition, results show that the modeling accuracy significantly depends on the primitive modeling method, and improvement of that method would positively impact the modeling spell checker.