Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

Analysis on the Walking Volumes of a Hexapod System with General 3R Link Legs (일반적 3R 링크를 갖는 6각 보행로봇 다리의 보행체적에 대한 해석)

  • Han, Gyu-Beom;Yang, Chang-Il;Baek, Yun-Su
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.7
    • /
    • pp.2205-2212
    • /
    • 1996
  • In order to move the body of a walking robot translationally, and step over the obstacles, the walking robot must have at least 3 degrees of freedom for each leg. Therefore each leg of the general walking robots can be composed of 3-link system with 3 revolute joints. In this paper, the colsed form of inverse kinimatic solutions is shown for this general 3R linkage. Moreover, in order to have efficient walking volume in rough terrain, the workspace of each log is obtained considering the twist angles and the offsets in D-H parameters. When we design a walking robot, the information of the walking volume is needed for planning desired trajectories of the feet effectively. Appropriate knowledge of the walking volume can also be used to maximize linear or angular velocity of minimize power of stress. However, since it is impossible to obrain the information of walking volume in 3-D space directly from the kinematic equations, the walking volume can be searched through the edge detection algorithm using the triangle tracer with closed from inverse kinematic solutions. In this study, we present the closed form inverse kinematic solutions for 3R linkage model, and the walking volume of 6 legged walking robot which is modeled after the darking bettle, Eleodes obscura sulcipennis, through the method of edge detection for an arbitrary 2 dimensional shape using triangle tracer.

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

A Survey on the Spaces in Police Substation for Improving Area Standards (지역경찰관서 면적기준 개선을 위한 실태조사)

  • Kang, Kyung-Yeon;Han, Gi-Sung;Lee, Kyung-Hoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.2
    • /
    • pp.3-11
    • /
    • 2020
  • The police substation includes work spaces for civil services, interviews, and meetings, etc, and private spaces for rest, showers and cafeterias and so on. Since a large number of rooms for each function should be installed in a relatively small building, it is important to develop an area standard for efficient space organization in consideration of the functional characteristics and usage patterns of each space. The purpose of this study is to suggest the way for improving the area standards for spaces in police substation based on the results of existing standards analysis and case study. For this objective, architectural documents of 161 police substations built after 2013 in Korea were comparatively analyzed. Sixteen of these facilities were selected for field survey and investigated how the workspace and private area were organized and used. The results of investigation showed that there were a number of problematic cases, such as spaces not installed or insufficient, spaces used for two or more functions, spaces installed even though they are not included in the standards. It was mainly due to the fact that several important spaces which had been installed in most police substations were not included in the existing standards. The ways for improvement were suggested like following four points: (1) Modifying the criteria for classifying facility size, (2) Modifying the lists of the required spaces, (3) Specifying the basis of calculation for each space in detail, and (4) Differentiating the way to organize spaces according to the facility size.

Design of Integrated Process-Based Model for Large Assembly Blocks Considering Resource Constraints in Shipbuilding (자원제약을 고려한 조선 대조립 공정의 통합 프로세스 기반 모델 설계)

  • Jeong, Eunsun;Jeong, Dongsu;Seo, Yoonho
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.2
    • /
    • pp.107-117
    • /
    • 2019
  • Because shipbuilding is single-product production with limited resources, production management technology is essential to manage the resources effectively and maximize the productivity of ship-process. Therefore, many shipbuilding companies are conducting research on ship production plan and process considering various constraints in the field by applying modeling and simulation. However, it is difficult to provide accurate production plan on sudden schedule and process changes, and to understand the interconnectivity between the processes that produce blocks in existing research. In addition, there are many differences between the production planning and field planning because detailed processes and quantity of blocks can not be considered. In this research, we propose the integrated process-based modeling method considering process-operation sequences, BOM(Bill of materials) and resource constraints of all the scheduled blocks in the indoor system. Through the integrated process-based model, it is easy for the user to grasp the assembly relationship, workspace and preliminary relationship of assembly process between the blocks in indoor system. Also, it is possible to obtain the overall production plan that maximizes resource efficiency without the separate simulation and resource modeling procedures because resource balancing that considers the amount of resource quantity shared in the indoor system is carried out.