• Title/Summary/Keyword: Works efficiency

Search Result 829, Processing Time 0.028 seconds

Maximum-Efficiency Tracking Scheme for Piezoelectric-Transformer Inverter with Dimming Control

  • Nakashima Satoshi;Ogasawara Hiroshi;Kakehashi Hidenori;Ninomiya Tamotsu
    • Proceedings of the KIPE Conference
    • /
    • 2001.10a
    • /
    • pp.7-10
    • /
    • 2001
  • This paper provides a solution for the problem of efficiency decrease caused by load variation. A novel control scheme of tracking the PT's operation frequency for the maximum efficiency is proposed. As a result, a high efficiency over $80\%$ has been achieved even under the output-current decrease down to $10\%$ of the full load current.

  • PDF

The Pruning Works Efficiency of Manual Pruning Saw (인력고지톱을 이용한 가지치기 작업능률)

  • Cho, Koo-Hyun;Oh, Jae-Heun;Park, Mun-Sueb;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.24 no.1
    • /
    • pp.47-51
    • /
    • 2008
  • The first pruning works of planted trees on forest area carry out when tree height reached at 6 meters. And the second works carry out when it grow to 12~13 meters of tree height. Pruning works are necessary for producing straight log without knar by tool or machine. Generally, the mechanized pruning works Self-propelled pruning machine, chain pruning saw and other tools are used in mechanized pruning works. However, manual pruning saw which is usually using pruning tool was for this study. To investigate the pruning works efficiency, Pinus densiflora, Pinus koraiensis and Pinus rigida which were distributed in Kangwon-Do was surveyed. Height of surveyed the trees were 10~16 meters and its pruning works range were 6.2~6.7 meters of tree height. As results, pruning works efficiency of Pinus densiflora, Pinus koraiensis and Pinus rigida were 3.14 min/tree, 5.06 min/tree and 4.44 min/tree, respectively. Also, possible pruning works of man-day for Pinus densiflora, Pinus koraiensis and Pinus rigida was 104, 64, and 81 trees, respectively.

  • PDF

Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

The On-Line Economic Load Dispatch Program of Kwangyang Steel Works (광양제철소의 실시간 경제운용 프로그램 개발)

  • Kim, Jae-Chul;Baek, Young-Sik;Lee, Hee-Choon
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.116-118
    • /
    • 2000
  • This paper proposes an efficient method of On-Line Economic Load Dispatch(ELD) using Evolutionary Programming(EP) technique at Kwangyang steel works. The economic operation of steel works is done by experienced engineer. So far, there is no formulation and algorithm of economic operation of steel works. In this paper, we propose the formulation and On-Line algorithm of economic operation of steel works. The EP technique is the kind of Evolutionary Computation(EC) which has become a candidate for many optimization applications due to its flexibility and efficiency. Based on the EP technique, the proposed algorithm is capable of not only solving the economic problem, but also obtaining the global optimal solutions within reasonable execution time. To validate our proposed approach, the algorithm is demonstrated on many sample systems and compared to actual values of steel works.

  • PDF

Evaluation of Efficiency of Snow Removal Operation Resources using Data Envelopment Analysis (DEA를 이용한 동절기 도로제설자재 운영 효율성 평가)

  • Kim, Jin Guk;Yang, Choong Heon;Park, Geun Hyoung
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.109-118
    • /
    • 2018
  • PURPOSES : This study evaluates the efficiency of snow removal operation resources using data envelopment analysis (DEA). The results of this study can help decision-making strategies, especially for resource allocation for snow removal works on national highways. METHODS : First, regional road management offices (DMUs) for efficiency evaluation were set up, and a database (for years 2012-2016) for analysis was formed. Second, DEA was carried out by selecting input and output variables based on the constructed database. Lastly, based on the results of the DEA, the efficiency of each regional road management office was evaluated. In addition, the potential for future improvement was determined. RESULTS : The results showed that there was a large variation in efficiency of snow removal operation resources by regional offices. CONCLUSIONS : The results of this study imply that the evaluation of efficiency for snow removal operation resources is important when decisions related to snow-removal strategies are made by road management offices.

Management Efficiency of Forest Tending Works by Using Data Envelopment Analysis (DEA(Data Envelopment Analysis)기법을 이용한 숲가꾸기 사업의 경영 효율성 분석)

  • Woo, Hee Sung;Woo, Jong Choon;Won, Hyun Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.4
    • /
    • pp.729-736
    • /
    • 2012
  • Korea Forest Service is recently focused on forest tending works for promoting in green jobs. The purpose of forest tending work is not only maintaining ecologically stable forest stand structure but also developing commercial forest. These trends are also emphasized by creation of various benefits and expanding carbon absorption in forest management. For achieving these purposes, Management efficiency of output was analized by the inputs such as labor cost, material cost and expense cost using DEA technique. The results show that, 19 sub-compartments are appeared to be the optimal in the efficiency of the forest tending works among total 52 sub-compartments. Among those there were 5 sub-compartment 8-0-3, 9-3-3, 6-0-3, 7-0-6, 1-0-5 and 3-0-3 to be considered in the high reference. The high reference areas mean those areas which is well accomplished in forest tending works as the desirable model.

POSCO's Research and Development works on rare earth reduced NdFeB magnets production process

  • Yuh, Junhan
    • Proceedings of the Korean Magnestics Society Conference
    • /
    • 2013.12a
    • /
    • pp.90-90
    • /
    • 2013
  • Since discovery, NdFeB permanent magnet has replaced application of the conventional magnets rapidly because of its superior physical and mechanical properties. With increasing consumption of power combined with energy resource depletion, energy efficiency is becoming more and more inportant. According to recent reports, almost almost half of the electric power is consumed by motor, and NdFeB magnets which are the core component of the motor play a key role on improving energy efficiency of the devices. In parallel with finding alternatives energy resources, research works improving energy efficiecy have been conducted world wide. Althogh NdFeB magnets usage have been expanded to various applications, key materials such as Nd and Dy, resouces lean heavily on specific area, China. Magnetic industry revently experienced skyrocketing price fluctuatioin of rare earth at around 2008. Chineses government's regulations worsened the situation and arose a necessity to develop methods to minimize rare earth use. In this presentation, POSCO's recent research works on rare earth reduction is presented including novel powder alloying method using nitrate precursors. Also, future R&D plans for rare earth free magnets is briefly introduced as well.

  • PDF

Design of Manipulator End Effectors for Pier Column Construction (교각 기둥시공을 위한 매니퓰레이터 엔드 이펙터 설계)

  • Chung, Taeil;Lee, Sang-Won;Lee, Sang-Yoon;Ryu, Jee-Hwan
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.3
    • /
    • pp.207-215
    • /
    • 2021
  • There is a risk of serious injury to workers who work at height in pier construction process. By using auto climbing formwork system that does not need to dismantle and reinstall formworks, it is possible to improve work efficiency and safety of workers. However, auto climbing formwork system still requires workers to work on a pier for rebar connection works and so on. In order to eliminate works by workers on the pier, robot manipulators with special end effectors are proposed. Through analysis of works on the pier, three specialized end effectors which are a gripper, a rebar coupler press, and a concrete vibrator, are suggested. Also, new pier construction scenario by the suggested system is confirmed using 3d modeling. It is expected that the proposed system and method enables pier construction without workers on piers. It will increase safety and efficiency of pier construction.

The On-Line Economic Load Dispatch Program of Kwangyang Steel Works (광양제철소의 실시간 경제운용 프로그램 개발)

  • Kim, Jae-Chul;Baek, Young-Sik;Lee, Hee-Choon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.7
    • /
    • pp.318-323
    • /
    • 2001
  • This paper proposes an efficient method of On-Line Economic Load Dispatch(ELD) using Evolutionary Programming(EP) technique at KwangYang steel works. The economic operation of steel works is done by experienced engineer. So far, there is no formulation and algorithm of economic operation of steel works. In this paper, we propose the formulation and On-Line algorithm of economic operation of steel works. The EP technique is the kind of Evolutionary Computation(EC), which has become a candidate for many optimization applications due to its flexibility and efficiency. Based on the EP technique, the proposed algorithm is capable of not only solving the economic problem, but also obtaining the global optimal solutions within reasonable execution time. To validate our proposed approach, the algorithm is demonstrated on many sample systems and compared to actual values of steel works.

  • PDF