• Title/Summary/Keyword: Work-in-Process Management

Search Result 1,890, Processing Time 0.029 seconds

On-site Quality Control Support Tools Based on Mobile BIM - Focusing on Quality Management Work - (모바일 BIM기반 현장 감리업무 지원도구 - 품질관리업무를 중심으로 -)

  • Song, Jingxu;Yu, Jungho;Kim, Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.27-37
    • /
    • 2020
  • In order to reduce the possible quality problems in the construction stage. This research will develop a quality management support tool based on Mobile BIM. In order to develop the tools of this study, the procedures of domestic quality management work were analyzed, and 12 functions were derived to solve the existing problems, and the process of mapping checklists by work type and BIM model objects was performed. Finally, through the questionnaire survey on the usefulness of the tool in the actual field, the possibility of props in actual supervision business is verified.

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures (대공간 건축물 지붕공사의 시공기법선정을 위한 기초연구)

  • Kim, Daegil;Hong, Jooyoung;Lee, Myungdo;Eom, Jinup;Kim, Daewon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.247-248
    • /
    • 2016
  • Globally the interest of large-scale structure has been increasing for the use in various social and cultural events. However various problems for building large-scale structure in South Korea are expected in terms of construction method and site management due to the lack of experience. Construction method and planning significantly affects on making decisions. There are only theoretical approach for constructing large-scale building in domestic with the limited experience of constructing constrained size structure. Through Analytic Hierarchy Process with experts, derived decision factors mostly used construction method in construction of large-scale structure. Derived factors from this study will support making decisions for field management in constructing large-scale structure.

  • PDF

Analysis of the Risk Factors and Design of the Safety Management Application for the Panel Line in a Shipyard (조선소 판넬라인의 위험요인 분석 및 안전관리 Application 개발)

  • Oh, Hyunsoo;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.6
    • /
    • pp.160-165
    • /
    • 2012
  • The process of panel line in the shipyard produce the panel of outside planking which is located the side and bottom of a ship. The stiffeners or plates are welded onto the plates in this process. In this study, the panel line was performed to work process analysis and was analyzed into the IDEF0(Integration Definition) model that is functional modeling methodology. Also the panel line was analyzed to find out the risk factor and expected accident/safety guide from each process. And then this outputs were applied to the IDEF0 model. The mobile application which is designed by ooCBD(Object-oriented Component Based Development) method is able to use the output data of the process analysis in the panel line. This mobile application could be used by employees and safety managers without regard for working location and time.

A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work (지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

Developing a Model to Explain the Process of Technology Transfer at Entrepreneurial University

  • Soleimani, Mohsen;Tabriz, Akbar Alem;Shavarini, Sohrab Khalili
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.4
    • /
    • pp.298-306
    • /
    • 2016
  • The gap between universities, scientific centers and industrial-production units is one of higher education concerns. In academic entrepreneurship, the university work simultaneously in education, research and entrepreneurship. The universities play a key and important role in providing educational opportunities in economic development. This research aims to develop and expand science as well as help managers to explain the process of technology transfer in entrepreneurial university. This research is applied-developmental type and on the other hand, data driven theories have been used in this study. Current model is generally tried to meanwhile compensate previous shortcomings, include some strengths such as considering domestic factors of Iran as well as update effective factors on the process of technology transfer. Finally the suggested model has been compared with existing well-known models that each one of those models have some drawbacks which have been tried to be minimized in suggested model as much as possible.

Correlation Analysis between Fatigue and Performance Shaping Factor for Alternation Worker's (Focused on the Semiconductor industry) (교대근무자의 피로와 수행영향인자 간의 상관관계 분석 (반도체 산업을 중심으로))

  • Yoon, Yong-Gu;Park, Peom
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.303-316
    • /
    • 2008
  • For the past 25 years, Korean semiconductor has experienced enormous growth to be the highest production country in the world. Semiconductor industry is very time sensitive and driven by technology and process, and requires 24-hour full operation. The environment includes many different types of equipment, utilities, different gases and toxic chemicals as well as high voltage electricity. We have performed a survey with 3-shift engineers and workers in one line. The content of the questionnaire was about the correlation between fatigue and performance shaping factor (work type and work ability), and as a result we were able to deduce the correlation, p-value and the pattern of scatter plot. The shape of the model was made of 4 blocks for fatigue, 5 blocks for work type and 5 blocks for work ability, i. e. 14 blocks in total. As a conclusion to this findings, there was a correlation between fatigue and work type and work ability specifically in semiconductor industry, and we need some effort to reduce this.

  • PDF

Countable-grid Scheduling Method (CSM) and CSM-based Soft-logic Algorithm Development for Automated Construction Scheduling and Visualization (건설 공정계획 자동화와 시각화를 위한 가산 그리드 공정계획 기법(CSM)과 CSM기반 소프트로직 알고리즘 개발 연구)

  • Choi, Heungsoon;Moon, Seonghyeon;Chi, Seokho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.65-77
    • /
    • 2022
  • Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process.

A Case Study of Computer Application for Work Study and Standard Time Data in Mid-Level Factory having Working Circumstances of Multi-Item and Multi Process Type -Mainly Focused on the Case of Man-Machine Chart- (다품종 및 다공정 환경 중소기업의 현장직 사원에 대한 작업분석 및 표준설정을 위한 Computer Application 사례연구 -M/M Chart Case를 중심으로-)

  • Yoo, Wang-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.2
    • /
    • pp.127-142
    • /
    • 1994
  • In these days, the PCs are widely used in the mid-level factory. But they have low-effectiveness for using them. The main reason should be the lack of useful and practical software in the market. This Case study aimed at the support of the software using DB Language to get M/M chart for aquiring work study and standard time data in the mid-level factory having multi-item and multi-process type. CVA (Chronocycle Video Analysis) is applied to get basic standard time data and working list. Standard time, Sequence of working and allowance time or rate for man and machine will be readily obtained through the menu when the software executing. Detailed program list is systematically shown in Appendix.

  • PDF