• Title/Summary/Keyword: Work-Site Application

Search Result 259, Processing Time 0.028 seconds

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

Application of Magnetic Methods for finding the Egyptian archaeological features

  • Abdallatif Tareq Fahmy;Suh Mancheol;El-All Esmat Abd
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.157-179
    • /
    • 2004
  • The application of magnetic method for archaeoprospection has been carried out through two archaeological areas in Egypt, Abydos and Abu Sir, In order to find out tile ancient Egyptian archaeological features. The magnetic work at the selected archaeological site of Abydos area was carried out by gradiometer survey, while magnetic work at the selected archaeological site of Abu Sir area was carried out by gradiometer survey and magnetic susceptibility measurements. A gradiometer survey with raster of 0.5 m/0.5 m has been carried out on a surface area of $9600 m^2$ at Abydos area to relocate the buried Solar Boats. The magnetic data were processed using Geoplot software to treat the field noises and enhance the quality of the obtained images. The final magnetic images indicate the existence of 12 Solar Boats as well as tombs, remains of ancient rooms and walls. All of them are expected to belong to the Middle Kingdom, particularly from the 18th to 20th Dynasties. Two magnetic tools have been applied over a selected site of $25600 m^2$ at Abu Sir area in order to detect the hidden archaeological features nearby the Sun Temple. The acquisition of the magnetic data was initiated by the measurements of the topsoil magnetic susceptibility of 272 samples collected from the whole studied area, and then followed by the gradiometer survey to measure tile vertical gradient of the geomagnetic field over an area of $14400 m^2$. The magnetic susceptibility results show the presence of high concentration at the middle part of the study area with a little extension to the south western side, with maximum value of about $36{\times}10^5$ SI. They may indicate the proximity of ritual monuments. Also, they offered the site of interest for carrying out a gradiometer survey. The gradiometer results show tile existence of numerous distributed archaeological features made of mud-bricks with different shapes and sizes. They may indicate tombs, burial rooms, dissected walls; all of them are expected to belong to the 5th Dynasty of pharaohs, who used to build their buildings by mud bricks. The depth of the expected buried archaeological features has been estimated from tihe gradiometer. It is around 1.2m for deep features and 0.42 m for shallow features.

  • PDF

A Study on Shear Connector Performance Estimation for Plan Extension of RC Apartment Structures (철근콘크리트 공동주택의 평면확장을 위한 연결부의 전단성능 평가에 관한 연구)

  • Kim, Dong Baek
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.2
    • /
    • pp.27-34
    • /
    • 2015
  • Nowadays, remodeling cases for some apartment like Hyundai through the support of government are reported. Conventionally, balcony and aisle are extended for additional private area or balcony which is supported by new frame is extended. In extension work at site, dowel bar is conventionally inserted in old concrete slab for connection with old and new slab, however, an examination for structural safety is rarely performed prior to construction, if ever, vertical load is only considered for structural analysis. When conventionally connected structures are exposed to earthquake, the old and new structures have individual earthquake behavior with different mode, which may lead the elimination of resistance to earthquake in new structures. As of this reason, new detailing connection system which can have light weight and sufficient ductility performance is developed for application to domestic extension works. Additionally, user manual and specification are also developed for fertilization of application for the developed technology.

A Study on the Development of GPS and Data Logger for PDA (PDA를 위한 GPS 및 데이터 로거 개발에 관한 연구)

  • Kim, Dong-Hoi;Kim, Sung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.07d
    • /
    • pp.2364-2367
    • /
    • 2002
  • Recently PDA(Personal Digital Assistance) can be purchased at a lower cost than ever before. Therefore, it can be effectively used in various ways such as a personal information management system and wireless mobile internet application. Manufacturers of PDA try to develope various application modules for its extensive utilizations. In this work, a CF typed GPS and data logger module for PDA is designed. It can give us valuable informations about the precise position of measuring site and corresponding sensor values. The proposed CF module can make it possible for PDA to be used as a hand-held measurement device.

  • PDF

A study on the Research & Analysis of the Health and safety Managing's Understanding for practical Application of Construction Industry Risk Assessment - Focus on worker - (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choe, Su-Hwan;O, Tae-Geun;Lee, Yeon-Su;Lee, Jin-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.445-456
    • /
    • 2013
  • According to Department of labor guideline "2012-104 (2012.9.26.)" This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.

  • PDF

Design of a Wheeled Blimp

  • Sungchul Kang;Mihee Nam;Park, Changwoo;Kim, Munsang
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.30.5-30
    • /
    • 2001
  • This paper describes a new design of blimp having wheeled vehicle part. This system can work both on the ground using wheeled vehicle and in the air using the floating capability of the blimp part. The passive wheeled mechanism in the vehicle part enables the stable taking off, landing on as well as it is greatly helpful to keep a stationary position on the floor. On the other hand, the floating capability enables the wheeled blimp to fly freely regardless of the ground condition or obstacles. The wheeled blimp can be used as an agent robot for the tole-presence application. Using multimedia devices such as camera, speaker, LCD and microphone mounted on the blimp surface, this system can get necessary information at the local site and communicate with person from a distance. As a typical tele-presence application, the wheeled blimp is currently being developed to a tole-guidance robot working in public indoor areas such 35 exhibition halls, departments, hospitals, etc ...

  • PDF

A Study on the Application Method of Construction Site Direct Construction System - Centered on domestic construction case - (건설현장 직접시공제도의 활용방안에 대한 연구 - 국내 건설 사례 중심으로 -)

  • Baek, Jae-Chul;Ock, Jong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.11
    • /
    • pp.171-180
    • /
    • 2019
  • This research proposed the Direct Construction System for construction corporations as a strategy intended to perform cause analysis of construction technician shortage matter and solve resulting problems, and in view of the outcomes from the application of this system to the projects and workshops, it was verified that unsteady employment, lack of career prospect, and conditions of work environment can be resolved. In addition, from corporations' perspective, it is considered that by clarifying the abovementioned three problems, fundamental complications of construction administration, quality control, safety supervision, and cost management were settled, concluding forthcoming advancement of domestic construction business quality fell far behind developed counties.

A Study on the Awareness of Firefighters on the Introduction of Drones and the Operation and Application of drones - Focusing on the Firefighters of Jeollanam-do (소방드론 도입에 따른 소방공무원의 인식과 드론의 운용 및 활용에 대한 연구 - 전라남도 소방공무원을 중심으로)

  • Ha, Kang Hun;Kim, Jae Ho;Choi, Jae Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.332-340
    • /
    • 2021
  • The purpose of this study was to present a method for the application of drones through analysis after surveying Jeollanam-do firefighters regarding the recognition, operation, field of application, necessary field of work, and the need for education on fire drones. As a result of the survey, 80.29% of respondents were found to be willing to operate drones, and the fields of work for which drones were considered the most necessary were in the order of rescue, fire suppression, life safety, first aid, and others. Besides, 77.38% of respondents thought that drones could contribute to the prevention of safety accidents for firefighters, and 70.13% of respondents thought that it would be appropriate to recruit firefighting drone operators through changing positions, and respondents chose firefighters in their 40s as the most suitable age group for firefighting drone operation. Also, 82.84% of respondents said they would participate in drone training, and they recognized that the use of drones could contribute to solving the physical problems caused by the aging of firefighters, and that drone training would also help firefighters manage their retirement. The fields where firefighting drones are used were investigated in the order of searching for requestors, checking on-site information, and checking on-site prior risk. In this study, a difference analysis for each group was performed according to the drone operation experience. There was a statistically significant difference in the items of safety measures for requestors. The results of variance analysis by work experience confirmed that there were statistically significant differences in a total of eight items, including four items related to the field of use of drones, and the age group of the drone operating crew, and whether or not to help retirement management.

A Study on the Technological Improvement of Strut as a Permanent Structure (구조물 겸용 흙막이 스트러트 공법의 개선 연구)

  • Kim, Sun-Kuk;Hong, Won-Kee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.186-193
    • /
    • 2008
  • The SPS, Strut as a Permanent System, method is widely adopted for the main structural member in addition to temporary strut function for the shuttering of excavation work. Although the SPS method has contributed to cost saving, time reduction, enhancement of structural stability, improvement of construction environment and so on at the building construction site, it caused the problems of increase of basement height and additional work for fire protection of steel structure. The increase of basement height caused the increase of shuttering depth and excavation, and the fire protection caused the additional cost as well as the deterioration of construction environment. In order to improve the problems, this paper is to propose a modularized hybrid structural system(HSD). The detail of the system is introduced and the structural performance and constructibility are proved through the experiment and site application.

Estimation of Application on the Site of SRC Method for the Ground Reinforcement in Marine Clay (해성점토층에서 SRC 지반보강에 관한 현장적용성 평가)

  • Lee, Seungjun;Lee, Seogyoung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.1
    • /
    • pp.23-32
    • /
    • 2013
  • Currently, the west coast has focused on large-scale investment and development, such as harbor construction work and land reclamation projects, with soft ground grouting issues being the major concern. In addition, grouting for soft ground reinforcement is definitely considered that construction purpose, soil condition, construction situation, and construction costs. The SRC method, which is a high pressure injection method, can easily produce well-distributed strength regardless of soil characteristics and is environmentally friendly. Therefore in this study, the SRC method was applied to marine clay on the west coast where located Jeongok-ri, Seosin-myeon, Hwaseong-si, Gyeonggi-do, Korea as well as estimated of the ground reinforcement and the application on the site. The results of the application on the site by SRC method indicated age 28 day strength is $14,700{\sim}31,800kN/m^2$ which is satisfied the criterion of unconfined compressive strength that more than $5,333kN/m^2$. Therefore the result that the SRC method constructed marine clay on the west coast indicated the outstanding strength as well as excellent durability.