• Title/Summary/Keyword: Work process model

Search Result 1,761, Processing Time 0.023 seconds

Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Development of Nexus for BIM and Documents based on Maintenance Process (유지보수공사 프로세스기반 BIM-문서 넥서스 구축)

  • Han, Ji-Ho;Park, Sang-Hun;Yoon, Sun-Jae;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.168-169
    • /
    • 2021
  • Maintenance is carried out over a long period of time, and various documents are utilized in the maintenance work. In maintenance work which is progressed simultaneously in a short period of time, it is important to provide relevant information to the parties in a timely manner. As the types of work increase, manager needs more time and effort to select and utilize the documents. It is necessary to have an information system that supports the person in charge by grasping work procedures for each construction and providing the necessary documents and information for that step. This paper proposes an process based nexus model that can provide necessary documents to the parties to the work steps by linking the maintenance work process and BIM. Through the nexus model presented, manager can efficiently acquire the necessary documents and utilize them for the construction works currently being carried out.

  • PDF

Next Generation Knowledge Management A Process Integrated Model of Knowledge Asset Utilization (업무-지식 통합기반의 차세대 지식경영 모델)

  • Sohn, Jung Hoon Derick;Seo, Kyong Ran
    • Knowledge Management Research
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2010
  • Despite the well accepted necessity and importance of knowledge management, cases of successful knowledge management are not easy to find. With a case study of a Korean organization, this research introduces an integrated knowledge management model, in which knowledge and work processes are combined to improved knowledge performance. Knowledge-work process integration facilitates knowledge asset creation, transfer, and utilization, through which inefficiencies in knowledge utilization may be removed and knowledge contribution to business performance may be enhanced. Knowledge-work process integration may further be aligned with innovation processes, enabling systematic and continuous knowledge based process innovation.

  • PDF

A Study on the Business Process Model for sustainable Supply Chain (지속가능한 공급사슬(Supply Chain)을 위한 비즈니스 프로세스 모델 연구)

  • Ahn, Kyeong Rim;Lee, Ju Yeon
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.1
    • /
    • pp.181-193
    • /
    • 2014
  • The environment of supply chains is rapidly changed to global and eco-freindly work process. However, at current environment, it is not easy to grasp work flow and to analyze energy efficiency. Improving energy efficiency and visibility for goods flow can contribute to increases in customer attitudes and reductions in overall production costs Additionally, it can lead to increases in work efficiency and reductions in overall production costs. Until recently, efforts to improve energy performance focused on manufacturing industry. Those efforts have expanded to the supply chain. In this paper, we perform business process modeling about supply chain for visibility and sustainability - information and component flows - from assembly plants to logistics. This paper defines the work and information flows by modeling the underlying logical structures of the supply chain and the business processes that determine impact of visibility and sustainability. We model processes using the modeling methodology specified by UN/CEFACT. This methodology explains business process functionality and business transactions by UML diagram. The output of this paper would be useful in grasping work flow and capturing the used energy.

Development of BIM-based Work Process Model in Construction Phase (시공단계의 BIM기반 건설사업관리 업무절차 모델 개발)

  • Yu, Yongsin;Jeong, Jiseong;Jung, Insu;Yoon, Hobin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.133-143
    • /
    • 2013
  • BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.

Design and Implementation of Mobile Agent Model Supporting the Optimal Path Search through Traffic Sense (트래픽 감지를 통한 최적 경로 탐색 이동 에이전트 모델 설계 및 구현)

  • Kim Kwang-jong;Ko Hyun;Kim Youngja;Lee Yon-sik
    • Journal of Korea Multimedia Society
    • /
    • v.7 no.10
    • /
    • pp.1421-1435
    • /
    • 2004
  • When various work was given from user, the existing mobile agent model migrated from node to node and process the work at the point that much traffics according to passive routing schedule are happened, until it makes service the work result, time cost of round work process for the distributed nodes are increased. Therefore, the existing agent systems need migration method to solve the problems of agent size increment or a lack of interoperability among agent systems. To solve these problems in this thesis, we design and implement an CORBA-based Mobile Agent Model(CMAM) for the efficient work process into the distributed nodes, when the mobile agents are migrated among the nodes, using an optimal path search by sensing of network traffic.

  • PDF

Development of Field Programmable Gate Array-based Reactor Trip Functions Using Systems Engineering Approach

  • Jung, Jaecheon;Ahmed, Ibrahim
    • Nuclear Engineering and Technology
    • /
    • v.48 no.4
    • /
    • pp.1047-1057
    • /
    • 2016
  • Design engineering process for field programmable gate array (FPGA)-based reactor trip functions are developed in this work. The process discussed in this work is based on the systems engineering approach. The overall design process is effectively implemented by combining with design and implementation processes. It transforms its overall development process from traditional V-model to Y-model. This approach gives the benefit of concurrent engineering of design work with software implementation. As a result, it reduces development time and effort. The design engineering process consisted of five activities, which are performed and discussed: needs/systems analysis; requirement analysis; functional analysis; design synthesis; and design verification and validation. Those activities are used to develop FPGA-based reactor bistable trip functions that trigger reactor trip when the process input value exceeds the setpoint. To implement design synthesis effectively, a model-based design technique is implied. The finite-state machine with data path structural modeling technique together with very high speed integrated circuit hardware description language and the Aldec Active-HDL tool are used to design, model, and verify the reactor bistable trip functions for nuclear power plants.