• 제목/요약/키워드: Work in process

검색결과 8,686건 처리시간 0.03초

공동주택 마감공사 중요도 기반 작업지연 요인 분석 (Delay Factors Based on the Importance of Finish Work in Apartment Construction Project)

  • 이승훈;이상효;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석 (An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park)

  • 성백진;이재근;최종희
    • 한국조경학회지
    • /
    • 제31권6호
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

공동주택 하자감정업무 표준절차개발을 위한 사례분석 (Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building)

  • 박준모;서덕석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF

노동과 건강 불평등, 그 근원은 어디인가? (What is the Origin of Inequalities in Work and Health?)

  • 손미아
    • Journal of Preventive Medicine and Public Health
    • /
    • 제38권3호
    • /
    • pp.241-251
    • /
    • 2005
  • There has been an enormous increasing trend of widening gap of social inequalities since economic crisis at the end of 1997 in Korea. Since then, Korean society has deteriorated in economic and social conditions; the unemployment rate, temporary or casual workers and absolute poverty have increased. This paper presents the origin of inequalities in work and health in Korea. The origin of inequalities in work begins with the relationship between the capitalist and labourers in the capitalist mode of production. The conception and execution are dissolved in the work process in the capitalist mode of production. Thus, captitalists become control over ther labour process from workers. An alienation of the work process from the workers. The distribution of work is the majour source if inequalities in many countries as well as Korea. This paper presents the increasing tendency of unhealthy states such as mortality, early death, morbidity, physical work load, workplace injury amongst the under-privileged: ordinary workers, unemployed people, casual workers and socially deprived people in Korea.

Discovering Temporal Work Transference Networks from Workflow Execution Logs

  • Pham, Dinh-Lam;Ahn, Hyun;Kim, Kwanghoon Pio
    • 인터넷정보학회논문지
    • /
    • 제20권2호
    • /
    • pp.101-108
    • /
    • 2019
  • Workflow management systems (WfMSs) automate and manage workflows, which are implementations of organizational processes operated in process-centric organizations. In this paper, wepropose an algorithm to discover temporal work transference networks from workflow execution logs. The temporal work transference network is a special type of enterprise social networks that consists of workflow performers, and relationships among them that are formed by work transferences between performers who are responsible in performing precedent and succeeding activities in a workflow process. In terms of analysis, the temporal work transference network is an analytical property that has significant value to be analyzed to discover organizational knowledge for human resource management and related decision-making steps for process-centric organizations. Also, the beginning point of implementinga human-centered workflow intelligence framework dealing with work transference networks is to develop an algorithm for discovering temporal work transference cases on workflow execution logs. To this end, we first formalize a concept of temporal work transference network, and next, we present a discovery algorithm which is for the construction of temporal work transference network from workflow execution logs. Then, as a verification of the proposed algorithm, we apply the algorithm to an XES-formatted log dataset that was released by the process mining research group and finally summarize the discovery result.

유전자 알고리즘을 이용한 조선 소조립 로봇용접공정의 최적화 (Optimization of Robot Welding Process of Subassembly Using Genetic Algorithm in the Shipbuilding)

  • 박주용;서정진;강현진
    • Journal of Welding and Joining
    • /
    • 제27권2호
    • /
    • pp.57-62
    • /
    • 2009
  • This research was carried out to improve the productivity in the subassembly process of shipbuilding through optimal work planning for the shortest work time. The work time consist of welding time, moving time of gantry, teaching time of robot and robot motion time. The shortest work time is accomplished by even distribution of work and the shortest welding sequence. Even distribution of work was done by appling the simple algorithm. The shortest work sequence was determined by using GA. The optimal work planning decreased the total work time of the subassembly process by 4.1%. The result showed the effectiveness of the suggested simple algorithm for even distribution of work and GA for the shortest welding sequence.

유지보수공사 프로세스기반 BIM-문서 넥서스 구축 (Development of Nexus for BIM and Documents based on Maintenance Process)

  • 한지호;박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2021
  • Maintenance is carried out over a long period of time, and various documents are utilized in the maintenance work. In maintenance work which is progressed simultaneously in a short period of time, it is important to provide relevant information to the parties in a timely manner. As the types of work increase, manager needs more time and effort to select and utilize the documents. It is necessary to have an information system that supports the person in charge by grasping work procedures for each construction and providing the necessary documents and information for that step. This paper proposes an process based nexus model that can provide necessary documents to the parties to the work steps by linking the maintenance work process and BIM. Through the nexus model presented, manager can efficiently acquire the necessary documents and utilize them for the construction works currently being carried out.

  • PDF

단말기 독립성과 비용의 효율성 제공을 위한 단조 재공 관리 시스템 (A Device-Independent and Cost-Effective Forging Work-in-Process Control System)

  • 정동원
    • 정보처리학회논문지D
    • /
    • 제19D권3호
    • /
    • pp.221-228
    • /
    • 2012
  • 이 논문에서는 특정 단말기에 대한 독립성을 보장하고 비용의 효율성을 제공하는 새로운 단조 재공 관리 시스템을 제안한다. 지금까지 효율적인 재공 또는 재고 관리를 통해 프로세스 생산성을 향상시키기 위한 다양한 연구가 진행되어 왔으며, 특히 바코드, RFID, 영상인식과 같은 다양한 IT 기술의 접목이 시도되었다. 그러나 단조 재공 관리 환경의 특성상 이러한 접근방법은 많은 문제점을 야기한다. 따라서 이 논문에서는 기존 접근방법의 한계를 극복할 수 있는 새로운 단조 재공 관리 시스템을 제안한다. 제안 시스템은 스마트 모바일 기기의 GPS 정보를 이용하여 객체를 식별하고 객체의 위치를 정확하게 관리한다. 따라서 특별한 식별태그가 요구되지 않으며, 식별태그를 판독하기 위한 특정 단말기가 요구되지 않는다. 이를 통해 기존 접근방법의 문제점을 해결하고 전체적인 단조 재공 관리 프로세스의 생산성을 향상시킨다.

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

물류 프로세스 표준화 연구 (The Study of Logistics Process Standardization)

  • 박순호;박수민
    • 디지털산업정보학회논문지
    • /
    • 제7권1호
    • /
    • pp.173-183
    • /
    • 2011
  • Global logistics including Korea had developed at various fields through the developed IT technology. In addition, in changing into Internet based digital economy times, economic and logistics activities became extending into worldwide over the cross-border. Logistics activity performed by off-line rapidly changed in real environment. But, unfortunately business process modeling about the whole logistics was not happened, even though process modeling had done by transport stages or logistics entities. Therefore, it is difficult to grasp the whole logistics. Additional cost and time was requested due to no association between logistics entities and invisibility. So, this paper has to be process modeling for logistics industry domain. For objective modeling, work area shall be divided and it extracts general work process per each area. And then it defines subprocess of general work process. Cargo tracking in logistics industry domain means to grasp the status and present states at transportation or storage stage. This paper defines business process and data model for electronic processed work area using the UN/CEFACT standard modeling methodology.