• 제목/요약/키워드: Work delay

검색결과 613건 처리시간 0.027초

ON A FUNCTIONAL EQUATION FOR QUADRATIC INVARIANT CURVES

  • Zhang, Weinian
    • 대한수학회지
    • /
    • 제38권6호
    • /
    • pp.1179-1190
    • /
    • 2001
  • Quadratic invariant curve is one of the simplest nonlinear invariant curves and was considered by C. T. Ng and the author in order to study the one-dimensional nonlinear dynamics displayed by a second order delay differential equation with piecewise constant argument. In this paper a functional equation derived from the problem of invariant curves is discussed. Using a different method from what C. T. Ng and the author once used, we define solutions piecewisely and give results in the remaining difficult case left in C. T. Ng and the authors work. A problem of analytic extension given in their work is also answered negatively.

  • PDF

가상협동공간에서의 Haptic Display (Haptic Display in the Virtual Cooperative Workspace)

  • 류성모;최혁렬
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1995년도 추계학술대회 논문집
    • /
    • pp.284-289
    • /
    • 1995
  • This paper presents a haptic display of a cooperative work between the networked multiple users. Excluding the possibility of large timedelay among the users, it is presented the way of configuring individual haptic display systems including the computation of interaction forces, joint driving forces of haptic devices and simulation of the virtual objects. A haptic display system is developed consisting of two haptic display devices operated by two remote users and experimental results to show the validity of the proposed method are also presented.

  • PDF

TDD 기법을 이용한 적층식 석탑의 동특성 추출 (Extracting Modal Parameters of a Layered Stone Pagoda Using TDD Technique)

  • 김병화;문대중;이도형
    • 한국지진공학회논문집
    • /
    • 제19권3호
    • /
    • pp.103-108
    • /
    • 2015
  • This work introduces a modal testing and analysis results of the mock-up for a layered stone pagoda. The pagoda has been horizontally excited by an impact hammer. As to the measured acceleration time responses, the first five lower mode shapes and natural frequency are extracted by the TDD technique. It is observed that the time delay of a shear wave occurs through friction surfaces. Such phenomena cannot be described by using the traditional analytical models such as a continuum cantilever beam model or a discrete shear building model. However, the time delay typically affects only the phases of the pagoda system. The frequencies of the pagoda system are not affected by such time delay. It is found in the first time that the layered stone pagoda system has a set of closely placed modes in near of natural frequency. It is believed that such modes are due to the friction characteristics in friction surfaces. Based on the stick-slip friction model, it seems that the one of the closely placed mode can be a self-excited one.

동기화된 실시간 미디어 멀티캐스트 서비스에 적합한 오버레이 멀티캐스트 트리 구성 알고리즘 (Overlay Multicast Tree Construction Algorithm for Synchronized Real-time Media Multicast Service over the Internet)

  • 주현철;송황준
    • 한국통신학회논문지
    • /
    • 제31권11A호
    • /
    • pp.1037-1043
    • /
    • 2006
  • 본 논문은 인터넷 상에서 동기화된 실시간 미디어 멀티캐스트 서비스에 적합한 오버레이 멀티캐스트 트리를 구성하는 알고리즘을 제안한다. 제안하는 알고리즘은 멀티캐스트 송신 단에서 각 종단 시스템 사이의 전송 지연에 대한 평균과 변이를 최소화하는 트리 구성을 찾는다. 그러나 위의 문제는 NP-완전하므로, 이러한 문제의 계산 복잡도를 낮추면서, 근사해를 찾기 위한 방법으로 OGA (Orthogonal Genetic Algorithm)을 이용하였다. 실험 결과에서 제안하는 알고리즘이 기존 알고리즘에 비해 통기화된 실시간 미디어 데이터 전송을 위한 효과적인 트리를 구성한다는 것을 보인다.

IEEE 802.11e EDCA 무선랜의 매체 접속 지연 시간 및 정상 상태에서의 패킷 지연 분석 (Access delay and packet delay of EDCA in IEEE 802.11e wireless network)

  • 이유태;장종민;이계상;김동일;김창규
    • 한국정보통신학회논문지
    • /
    • 제12권8호
    • /
    • pp.1420-1426
    • /
    • 2008
  • 본 논문은 IEEE 802.11e 무선랜 환경에서 단말 수에 따른 각 AC(Access Category)별 포화 상태의 시스템 처리율과 관련한 기존 결과에 기반을 두어, IEEE 802.11e 무선랜 네트워크에서의 패킷 전송시간 간격을 통해, 각 AC별 매체 접속 지연 시간을 유도한다. 이 매체 접속 지연 시간을 서비스시간으로 갖는 대기행렬모형을 이용하여, 정상 상태에서의 각 AC별 대 기열의 길이와 패킷 지연 시간을 유도한다. 또한, 수치 해석과 모의 실험을 통하여 모형의 정확성을 검증하고 각 AC별 성능을 분석한다.

청년 취업 1인가구의 일과 여가의 균형에 대한 연구 (Work-Leisure Balance of Employed Young-Single-Households)

  • 양지명;정영금
    • 가족자원경영과 정책
    • /
    • 제23권2호
    • /
    • pp.17-40
    • /
    • 2019
  • The purpose of this study is to analyze the present condition of work-leisure balance and its influencing factors in employed young single households. Three groups of sample households-work-oriented, balanced, and leisure-oriented-were compared by factors related to work and leisure. Six cases were interviewed to obtain qualitative data on the subjective meaning of work-life balance and its influencing factors. The results showed different characteristics between the three groups based on the various work- and -leisure- related factors: average weekly working hours of the week, number of vacation days per year, weekday leisure time, degree of weekday freedom, and sufficiency of the leisure cost. In addition, the characteristics considered desirable for quality of life differed between groups. Finding the meaning of life through work and leisure was very important for those respondents, who have an unstable position in the labor market, and who want to delay making decisions on moving into the marriage and family-building phase recognized as a major development task for Korean adults.

Labor Productivity Model for Reinforced Concrete Construction Projects

  • Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.983-989
    • /
    • 2009
  • This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.

  • PDF

CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

NOVA System을 이용한 CMP Automation에 관한 연구 (The Study for the CMP Automation with Nova Measurement System)

  • 김상용;정헌상;박민우;김창일;장의구
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2001년도 추계학술대회 논문집 Vol.14 No.1
    • /
    • pp.176-180
    • /
    • 2001
  • There are several factors causing re-work in CMP process such as improper polish time calculation by operator. removal rate decline of the polisher, unstable in-suit pad conditioning, slurry supply module problem and wafer carrier rotation inconsistancy. And conclusively those fundimental reason for the re-work rate increasement is mainly from the cycle time delay between wafer polish and post measurement. Therefore, Wafer thickness measurement in wet condition could be able to remove those improper process conditions which may happen during the process in comparison with the conventional dried wafer measurement system and it can be able to reduce the CMP process cycle time. CMP scrap reduction by overpolish, re-work rate reduction, thickness control efficiency also can be easily achieved. CMP Equipment manufacturer also trying to develop integrated system which has multi-head & platen, cleaner, pre & post thickness measure and even control the polish time from the calculated removal rate of each polishing head by software. CMP re-work problem such as over & under polish by target thickness may result in the cycle time delay. By reducing those inefficient factors during the process and establish of the automatic process control, CLC system need to be adopted to maximize the process performance. Wafer to Wafer Polish Time Feed Back Control by measuring the wafer right after the polish shorten the polish time calculation for the next wafer and it lead to the perfact Post CMP target thickness control capability. By Monitoring all of the processed the wafer, CMP process will also be stabilize itself.

  • PDF

NOVA System을 이용한 CMP Automation에 관한 연구 (The Study for the CMP Automation wish Nova Measurement system)

  • 김상용;정헌상;박민우;김창일;장의구
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2001년도 추계학술대회 논문집
    • /
    • pp.176-180
    • /
    • 2001
  • There are several factors causing re-work in CMP process such as improper polish time calculation by operator, removal rate decline of the polisher, unstable in-suit pad conditioning, slurry supply module problem and wafer carrier rotation inconsistency. And conclusively those fundimental reason for the re-work rate increasement is mainly from the cycle time delay between wafer polish and post measurement. Therefore, Wafer thickness measurement in wet condition could be able to remove those improper process conditions which may happen during the process in comparison with the conventional dried wafer measurement system and it can be able to reduce the CMP process cycle time. CMP scrap reduction by overpolish, re-work rate reduction, thickness control efficiency also can be easily achieved. CMP Equipment manufacturer also trying to develop integrated system which has multi-head & platen, cleaner, pre & post thickness measure and even control the polish time from the calculated removal rate of each polishing head by software. CMP re-work problem such as over & under polish by target thickness may result in the cycle time delay. By reducing those inefficient factors during the process and establish of the automatic process control, CLC system need to be adopted to maximize the process performance. Wafer to Wafer Polish Time Feed Back Control by measuring the wafer right after the polish shorten the polish time calculation for the next wafer and it lead to the perfect Post CMP target thickness control capability. By Monitoring all of the processed the wafer, CMP process will also be stabilize itself.

  • PDF