• Title/Summary/Keyword: Work Schedule

Search Result 596, Processing Time 0.026 seconds

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park (울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석)

  • 성백진;이재근;최종희
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.6
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

Association between unpredictable work schedule and work-family conflict in Korea

  • Sang Moon Choi;Chan Woo Kim;Hyoung Ouk Park;Yong Tae Park
    • Annals of Occupational and Environmental Medicine
    • /
    • v.35
    • /
    • pp.46.1-46.12
    • /
    • 2023
  • Background: As unpredictable work schedule (UWS) has increased worldwide, various studies have been conducted on the resulting health effects on workers. However, research on the effect of UWS on workers' well-being in Korea is still insufficient. This study aimed to investigate the relationship between UWS and work-family conflict (WFC) using 6th Korean Working Conditions Survey (KWCS). Methods: Both UWS and WFC were measured using self-reported questionnaires, using data from the 6th KWCS conducted between 2020 and 2021, including 31,859 participants. UWS was measured by questions regarding the frequency of changes in work schedules and limited advanced notice. WFC was measured by questions regarding work to family and family to work conflicts. Logistic regression analysis was conducted to investigate the association between UWS and WFC. Results: The prevalence of UWS was higher among men, those under 40 years old, service and sales workers and blue-collar workers, and those with higher salaries. Workplace size also influenced UWS prevalence, with smaller workplaces (less than 50 employees) showing a higher prevalence. The odds ratio (OR) for WFC was significantly higher in workers with UWS compared to workers without UWS after adjusting for gender, age, marital status, occupation, salary, education, weekly working hours, shift work, company size, and having a child under the age of 18 years, employment status (OR: 3.71; 95% confidence interval: 3.23-4.25). Conclusions: The analysis of nationwide data revealed that UWS interferes with workers' performance of family roles, which can lead to WFC. Our findings suggest that it is crucial to implement policies to address unfair work schedule management, promoting a healthier work-life balance and fostering a conducive environment for family responsibilities.

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

Analysis of Progress Schedule and Delay Element of Frame Works in Apartments (아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구)

  • 최은준;최민권;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

An Overview of Korean Resource-Based Relativ Value Scale (상대가치 개발의 총괄)

  • 김한중;손명세;조우현;박은철;이선희;강형곤;허영주;원종욱;김양균
    • Health Policy and Management
    • /
    • v.5 no.2
    • /
    • pp.202-229
    • /
    • 1995
  • In Korea, Resource-Based Relative Value Scale(RBRVS) is suggesting to the alternative of Korean Medical Fee Schedule. This study developed to methodology of RBRVS applicable to Korean situation and applied to services of internal medicine and general surgery. Our methodology of RBRVS is basically same to Hsiao's. But there are some differences between our method and H냐매's because Korean medical situation differs to American. The first difference is method of measurement of work. The Unit of work in our study is total work including intra-servic work and pre-/post-service work. Secondly, in extrapolation, we use primary data gathered to small group of physician. Tertially, in measurement of practice cost, we directly survey to budget data of hosptials and analyse practice costs by service. Some results are presented in a companion article.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.