• 제목/요약/키워드: Work Productivity Analysis

검색결과 484건 처리시간 0.022초

운영형태별 수도사업 생산성 평가 (An evaluation of local waters productivity by operating types)

  • 김상문;이익규
    • 상하수도학회지
    • /
    • 제25권3호
    • /
    • pp.325-334
    • /
    • 2011
  • Market Environment around water work industry is rapidly changing. ISO, International Organization for Standardization, announced the international water work service standard for comparison and evaluation between nations and businesses. And developed countries in water work are introducing market principle for growth of nation's water industry and reinforcement of its competitiveness. Also, some local governments entrusted their water utilities for improvement of competitiveness of water work. However, as some failure cases from overseas came out with emphasis, there are many refuting perspective about entrusted operation achievements of domestic water market. Hence, this paper evaluated competitiveness of domestic local water utilities from the perspective of productivity. After evaluating productivity using Malmquist productivity index, the authors compared and analyzed whether there is a difference of productivity between two different operating types by using Mann-Whitney test. As a result of analysis, it has shown that local water utilities achieved higher productivity at entrusted operation type rather than direct operation type. The local water utilities which chose entrusted operation had increased the productivity 13.9% on total factor productivity(TFP) during experimenting period, while the local water utilities which chose direct operation had increased 0.2%. The background of achieving this high productivity in entrusted operation was analyzed as a result of the higher technological effectiveness of a special water company. The result of this study can be referred when local government needs to decide on what operating types they will use.

초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구 (A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building)

  • 홍보배;김용만;김주형;김재준
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

건설 프로젝트 생산성 평가를 위한 측정 기준 수립 (Establishment of Measurement Standards for Productivity Assessment in Construction Project)

  • 김준영;윤인석;정민혁;주선우;박성은;홍영민;조종우;박문서
    • 한국건설관리학회논문집
    • /
    • 제23권3호
    • /
    • pp.3-12
    • /
    • 2022
  • 일반적인 건설 프로젝트에서는 계획 수립에 표준품셈 등 작업 물량-투입 품의 비율을 생산성의 기준으로 활용한다. 이러한 방식의 생산성 기준은 표준화된 반복작업이 많은 프로젝트에서 실효성이 높으나, 복잡성이 높은 대규모 프로젝트의 표준적인 생산성 관리 기준으로 활용하기에는 한계가 있다. 이는 기존 프로젝트의 실적 데이터로부터 추출한 평균적 작업생산성보다는 당해 프로젝트의 생산성에 복합적으로 작용하는 다양한 작업중단 요인으로 인해 발생하는 비작업시간의 영향성이 크기 때문이다. 본 연구에서는 세부작업 프로세스에 작용하는 비작업요인의 영향성 산출을 통해 생산성을 평가하고 관리 포인트의 우선순위를 도출할 수 있는 생산성 측정 기준을 수립한다. 이를 위해 먼저 세부작업 프로세스와 유형별 비작업요인을 정의한 후, 이를 정량적으로 측정하기 위한 기법을 제안한다. 그리고 획득가능 생산성 개념을 활용하여 개선 가능한 생산성 향상의 정도와 각 비작업요인별 생산성 저하 영향도를 평가하는 방법론을 수립한다. 마지막으로 실제 현장에서 수집한 생산성 데이터를 토대로 사례분석을 수행하여 본 연구결과가 건설관리자에게 주요 생산성 관리 포인트에 대한 의사결정을 지원할 수 있음을 검증한다.

공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발 (Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects)

  • 강동완;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

보 철근공사 조립공법별 작업시간분석 (Work Time Analysis of Rebar Fabrication Method in Beam Construction.)

  • 김주용;김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

철골세우기의 현장생산성 측정 및 영향요인 분석 (Productivity Measurement and Analysis on Factors in Steel Erection)

  • 이지용;허영기;안방률
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

작업측정기법을 적용한 학교급식시스템의 유형별 작업 및 노동생산성 비교분석 (Comparative Analysis on Work and Labor Productivity in School Foodservice Systems)

  • 양일선
    • Journal of Nutrition and Health
    • /
    • 제30권6호
    • /
    • pp.690-703
    • /
    • 1997
  • The purpose of this study were to analyze work function and labor productivity in school foodservice systems through work sampling methodology. Conventional foodservice were classified into 5 group depending on the number of meals served. Commissary school foodservices were also classified into 5 group by cluster analysis using the number of meals served, the number of satellite schools, and the duration of time for delivery of food. Work measurement through work sampling methodology was conducted in at 5 conventional and 21 commissary food -services during 3 consecutive days from September to October in 1995. Results from work measurement through work sampling methodology were as followed : The most prevalent work functions was cleaning (26.5%) and then processing (25.1%) in conventional while it was processing (30.9%) and then cleaning(25.2%) in commissary school foodservice. Delay was 22.9% and 19.7% respectively. Mean labor minutes per meal of conventional and commissary foodservics were 4.57 and 4.09 minutes, respectively : no significant difference in labor minutes per meal existed between the two systems. but mean labor minutes per meal of commissary foodsevices(1.79min) was significantly lower than that of conventional foodservice(2.33min) during work time before service (p<0.05). Productivity was significantly lower in foodservices which served less than 400 servings ; n significant differences existed among 401-70, 701-1,100 and 1,101-1,500 meals. The highest productivity was in conventional school foodservices which served 1,501-1,900meals. Labor minutes per meal of commissary school foodservice which served less than 400meals per day was significantly lower than those of foodservice which served 401-1,900meals (p<0.05). Labor minutes per meal, preparation and cleaning were positively correlation in two school foodservice systems.

  • PDF

공동주택 철근공사의 현장분석을 통한 생산성에 관한 연구 (Productivity Analysis of Rebar Works in Apartment Housing Construction Project)

  • 하기주;최민권;이동렬;하영주;하민수;하재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.165-166
    • /
    • 2010
  • In this study, it was accomplished to analyze the productivity and manpower through the activity of rebar work for the application of rational construction cost in apartment house. And the rebar work is very important in the view of the expense and safety, and durability in the construction of R/C structure. Also the rebar work is very affected with productivity owing to the lack of manpower and materials cost rise.

  • PDF

특수 플랜트 형틀공종의 생산성 및 영향요인 분석 (Analysis of the Productivity and Influence Factor for Special-Plant Formwork)

  • 허영기;임진호;오재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2013
  • In the field of nuclear power construction, management and the systematic construction is very necessary. For more efficiently managing, analysis of influence factors and productivity is indispensable now. On this research, we collected the data from the nuclear power plant which is located in Korea. We analyzed the productivity and influence factors. As a result, productivity was 0.75(㎡/man·hour).On one hand, the productivity should be personnel, weather and whether there is a night duty or not. On the other hand, work crew depends upon operators, formwork amount, the presence or absence of night duty.

  • PDF

초고층 골조공사의 바닥 거푸집별 생산성 분석;기준층 3일 공정을 중심으로 (The Productivity Analysis by Slab Formwork of Structural Frame Work in Tall Building Construction)

  • 김태훈;신윤석;조성수;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 추계 학술논문 발표대회
    • /
    • pp.115-118
    • /
    • 2007
  • A tall building construction is needed to reduce the construction duration for project profitability. Reducing the cycle time of typical floor in the structural frame work which have the largest duration in the whole construction, greatly affects construction duration. Nowadays, some projects are accomplished in the 3 day cycle. In order to accomplish efficiently 3 day cycle, productivity information of similar projects is supported. Therefore, this study proposed labor productivity and application by slab formwork to construct by the 3 day cycle. In order to perform an analysis, we selected 3 cases and analyzed the labor productivity on the basis of the amount of slab forms, labors, and durations. Then, we performed the questionnaire to analyze the application by formwork of tall building construction engineers. This study will contribute to establish a reasonable scheduling in structural frame work of a new similar project.

  • PDF