• 제목/요약/키워드: Work Management

검색결과 9,012건 처리시간 0.033초

옹벽(콘크리트 옹벽)의 안전작업 지침 개요 (Research on the safety working instructions in the retaining wall construction (concrete retaining wall))

  • 오기택;강경식
    • 대한안전경영과학회지
    • /
    • 제18권1호
    • /
    • pp.25-33
    • /
    • 2016
  • This guidance purpose is setting Safety Health work instruction for prevent accident such as falling from heights work, collapse and trapped under the heavy equipment and Sediment collapse during retaining wall work by unsder the Industry Safety and Health rules.

Service-Oriented Organizational Citizenship Behavior in Restaurants: An Empirical Study from Pakistan

  • BHUTTO, Sana Arz;JAMAL, Yasir;RAFIQ, Asim;NISA, Noor Un;SAIFULLAH, Saifullah;HUSSAIN, Munir
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권11호
    • /
    • pp.67-77
    • /
    • 2021
  • The aim of this study is to investigate the role of employee engagement as a mediator between the High-Performance Work System and the Service-Oriented Organizational Citizenship Behavior (Service-Oriented OCB). Furthermore, work-life balance as a moderator, the impact Service-Oriented OCB on customer satisfaction will be investigated. This study employs a quantitative methodology for which questionnaires were distributed to sixty restaurants in Karachi, and a sample of 418 responses was collected for structural equation modeling analysis. Smart PLS software was used to analyze the structure model. The results show that HPWS has a positive impact on Service-Oriented OCB. It is assumed that the role of work engagement as a mediator between HPWS and Service-Oriented OCB is significant. This study found that Service-Oriented OCB has a positive impact on customer satisfaction. Work-life balance was also found to have a moderating influence. The findings confirmed the black box mechanism and the HPWS procedures in restaurants. This study suggests implementing effective HPWS practices to influence employees' work engagement, which leads to Service-Oriented OCB and employees being able to optimize their performance to influence customer satisfaction. The study contributes to the existing body of knowledge in human resource management.

울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석 (An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park)

  • 성백진;이재근;최종희
    • 한국조경학회지
    • /
    • 제31권6호
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

워크샘플링에 의한 학교급식 전담직원의 직무분석 (Work Measurement of Dietetic Staff through Work Sampling Methodology in School Foodservice Systems)

  • 양일선;이영은;차진아;유태용;정라나
    • Journal of Nutrition and Health
    • /
    • 제35권2호
    • /
    • pp.263-271
    • /
    • 2002
  • The purpose of this study was to determine the standard work time of dietetic staff through work sampling methodology in school flood service systems. Work measurement through work sampling methodology was conducted in five conventional, five commissary and five joint management flood service systems over two consecutive weeks in October 1999. Statistical analysis was performed on the SAS/Win 6.12 package program for Kruskal-Wallis test and multiple comparison. Observed data were satisfied with a confidence level of 95% and a confidence interval of $\pm$ 0.05. The results of this study can be summarized as follows. The actual time spent by dietetic staff members in conventional, commissary, joint-management flood servile systems was 2,394, 2,521 and 2,110 minutes per week, respectively. Transportation time of each flood service systeml and ILO allowance rate (11%) was applied. Thus, the standard work time per week of dietetic staff members in conventional, commissary, joint-management flood service systems was 2,746.14, 2,861.58 and 2,520.81 minutes, respectively. The standardized index was 1.04, 1.08 and 0.95 men in conventional, commissary, and joint-management flood service systems, respectively. Regardless of the school flood service system, those with "the duty of cooking and distribution management" had the longest labor time, while those with "duty of nutritional education" had the shortest labor time.

Factors Associated with Middle Managers' Work Motivation: Evidence from SMEs in Vietnam

  • NGUYEN, Huong Thanh;NGUYEN, Nguyen Danh;TRAN, Binh Van
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권11호
    • /
    • pp.1009-1019
    • /
    • 2020
  • This study presents an exploratory investigation of SMEs in Vietnam to understand the impact of personal-level factors on middle managers' work motivation and the moderating role of work environment. A survey of 450 middle managers (MMs) in 150 Hanoi's SMEs was conducted. The findings of this research showed a significant positive impact of Achievement (ACHV), Recognition (RECOG), and Responsibility (RESP) on work motivation of MMs under the investigation. Furthermore, the result indicated that the work environment affects the relationship between personal-level factors and work motivation of participants. Consequently, both work environment improvement and strategies related to personal-level factors need to be taken into consideration. Especially, Recognition and transparency in Responsibility are appreciated in organizations with a low level of work environment satisfaction. However, there were no indications that Participation (PAR) and Communication (CMM) have a considerable impact on work motivation of respondents, being neither low level nor high level of work environment satisfaction. Based on the findings, recommendations are suggested for Vietnam's SMEs to improve work motivation of MMs, by (i) developing standards with emphasis on their achievement, (ii) paying attention to organizational culture focusing on the responsibility of this managerial level, and (iii) building an adequate incentive system, especially non-financial incentives.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

건설공사의 안전관리정보시스템 개발;터널공사 중심으로 (Safety Management Information System in Construction Work;Focus on Tunnel Work)

  • 박종근;백신원
    • 한국안전학회지
    • /
    • 제23권4호
    • /
    • pp.72-78
    • /
    • 2008
  • In any form of construction work, it is essential that accidents be prevented at every stage from foundation preparation to build completion. For this, it is necessary to use models that can assess risk and provide instruction for safe work processes so that the risk of accidents is reduced. Currently, however, very few models can perform these tasks. In this paper, we presents a model that assesses risk quantitatively by analyzing risk factors involved in stage of construction such as foundation work, erection work, structural work, equipment work, finishing work and etc work. The model performs assessment based on examples of accidents and by investing actual conditions during construction. In addition, we presents in this paper a safety management system was developed to assess risk during construction and to effectively train laborers.

건설공사 상대적 위험도 산정 (Estimating Relative Risk Level of Construction Work)

  • 손기상;양학수;갈원모
    • 한국안전학회지
    • /
    • 제21권5호
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

빌딩공사의 안전관리정보시스템 개발 (A Development on the Safety Management Information System in Building Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제20권4호
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

A Prediction of Work-life Balance Using Machine Learning

  • Youngkeun Choi
    • Asia pacific journal of information systems
    • /
    • 제34권1호
    • /
    • pp.209-225
    • /
    • 2024
  • This research aims to use machine learning technology in human resource management to predict employees' work-life balance. The study utilized a dataset from IBM Watson Analytics in the IBM Community for the machine learning analysis. Multinomial dependent variables concerning workers' work-life balance were examined, categorized into continuous and categorical types using the Generalized Linear Model. The complexity of assessing variable roles and their varied impact based on the type of model used was highlighted. The study's outcomes are academically and practically relevant, showcasing how machine learning can offer further understanding of psychological variables like work-life balance through analyzing employee profiles.