• Title/Summary/Keyword: Wolsong Unit-1

Search Result 60, Processing Time 0.025 seconds

Assessment on Aging Management of Delayed Neutron Monitoring System Tubing for Continued Operation of Wolsong Unit 1 (월성1호기 계속운전 관련 결함연료위치탐지계통 배관의 열화관리평가)

  • Song, Myung Ho;Kim, Hong Key;Lee, Young Ho
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.2
    • /
    • pp.14-20
    • /
    • 2011
  • The end of design lifetime for Wolsong unit 1 will be reached on 20th November in 2012. So the license renewal documents for the continuous operation of Wolsong unit 1 is under reviewing now. Major components of primary system such as pressure tubes, feeder pipes including delayed neutron monitoring system tubing are being replaced and many components of secondary system are also being repaired. In this paper, the assessment on the wear degradation of delayed neutron monitoring system tubing(on the other hand, DN tube was called) was performed for the ageing management of the same component. The wear defects of this component was one of causes that resulted in heavy water leakage accidents. Therefore design specifications of Wolsong uint 1 and heavy water leakage accidents of pressurized heavy water reactors were reviewed and causes of wear defect for DN tubes were analyzed. Wear propagation equations based on the heavy water leakage history were made and the proper repairing time was possible to be expected if the continued operation was considered. Finally design change items of DN tubes that were conducted for the long term operation of Wolsong unit 1 are introduced.

Wolsong Unit 1 Steam Generator Aging Management for Continued Operation (월성 1호기 계속운전을 위한 증기발생기 열화관리)

  • Song, Myung Ho;Kim, Hong Key;Lee, Jung Min
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.6 no.2
    • /
    • pp.28-33
    • /
    • 2010
  • As a part of license renewal for the continued operation of Wolsong unit 1, the periodic safety review report was submitted near the end of design lifetime, 2012, and now is under reviewing. Major components of primary system such as pressure tubes, feeder pipes and so on are being replaced and many components of secondary system are also being repaired. So the license renewal of Wolsong unit 1 is expected to be acquired without significant issues. But on the other hand, steam generators of Wolsong unit 1 had the good performance and therefore the replacement and repair for the steam generator are not needed. Recently it is reported that some cracks were detected in a few of european steam generator with Alloy 800 tubes and the cause of cracks was the outer diameter stress corrosion cracking(ODSCC) due to the concentration of chemical impurities on the outer surface of tube. Accordingly the overall review on this issue was performed. The long-term operation is likely to results to form the concentration mechanism for the tube corrosion as the sludge build-up in the secondary side of steam generator and the crack in the crevice between tube and tube-sheet and expansion transitions is apt to be occurred. In this paper, the history of steam generator inspection and operation of Wolsong unit 1 are reviewed and the reliability of steam generator tube is evaluated and the steam generator aging management program for Wolsong unit 1 is introduced.

  • PDF

Development of Regulatory Technology on Aging for Continued Operation of Wolsong Unit 1 (월성1호기 계속운전 경년열화 규제기술 개발)

  • Kim, Hong Key;Song, Myung Ho;Nho, Seung Hwan;Kim, Se Chang
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.4
    • /
    • pp.57-62
    • /
    • 2011
  • As NPPs' operating times increase, the integrity of nuclear components is continually degraded due to aging effects of systems, structures and components. In addition, for the case of continued operation beyond design life, additional aging effects occurred during the extended operating period lead to more degradation of the integrity of nuclear components. Therefore, it is very important to mange and evaluate the aging to secure the safety of NPPs. Wolsong unit 1 is approaching to its design life of 30 years in 2012. The license renewal documents for continued operation of Wolsong unit 1 Is under reviewing now. In this paper, regulatory technologies for continued operation of Wolsong unit 1 developed by KINS will be introduced. That technologies include the safety review guidelines, regulatory guides for aging management program and regulatory program for audit calculation.

OVERVIEW OF CONTAINMENT FILTERED VENT UNDER SEVERE ACCIDENT CONDITIONS AT WOLSONG NPP UNIT 1

  • Song, Y.M.;Jeong, H.S.;Park, S.Y.;Kim, D.H.;Song, J.H.
    • Nuclear Engineering and Technology
    • /
    • v.45 no.5
    • /
    • pp.597-604
    • /
    • 2013
  • Containment Filtered Vent Systems (CFVSs) have been mainly equipped in nuclear power plants in Europe and Canada for the controlled depressurization of the containment atmosphere under severe accident conditions. This is to keep the containment integrity against overpressure during the course of a severe accident, in which the radioactive gas-steam mixture from the containment is discharged into a system designed to remove the radionuclides. In Korea, a CFVS was first introduced in the Wolsong unit-1 nuclear power plant as a mitigation measure to deal with the threat of over pressurization, following post-Fukushima action items. In this paper, the overall features of a CFVS installation such as risk assessments, an evaluation of the performance requirements, and a determination of the optimal operating strategies are analyzed for the Wolsong unit 1 nuclear power plant using a severe accident analysis computer code, ISAAC.

Reliability Analysis of Diesel Generators of Wolsong Unit 1

  • Park, S. Y.;Kim, S. H.;Kim, K. Y.;Kim, T. W.;Y. S. Cho
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.502-507
    • /
    • 1997
  • As a maintenance optimization project to improve the safety of Wolsong NPP (Nuclear Power Plant), reliability of diesel generators are estimated based on the operating experience, and improvement options are suggested. A reliability measure is suggested for the estimation of reliability for standby safety systems to reflect availability. It is assessed that the reliability of diesel generators can be much improved if the suggested improvement options are implemented.

  • PDF

Periodic Safety Review of Wolsong Unit 1 - Environmental Impact as gaseous and liquid effluents (월성 1호기 주기적안전성평가 - 기체 및 액체 방사성폐기물에 의한 환경영향)

  • 김성민;이은미;김미자;이갑복;정양근;엄희문
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.455-462
    • /
    • 2003
  • According to Korean nuclear code requires Periodic Safety Review(PSR) every 10 years should be perform for operating reactor, and selects the eleven PSR safety factors. Among them the review objective of the environmental impact is to determine whether the operator has an adequate programme for surveillance of the environmental impact of the nuclear power plant based on current safety standards. In this paper, the environmental impact in PSR of Wolsong Unit 1 was reflected current safety standards as of the evaluation date. As a result, all items generally satisfied the standards, and the staff also verified that the population dose due to the operation of Wolsong Unit 1 was controlled safely as of the evaluation date.

  • PDF