• Title/Summary/Keyword: Wiring technique

Search Result 55, Processing Time 0.028 seconds

A Study on Operating Position Sensing System of Pull Cord Switches Using Power Line Communication (전력선 통신을 이용한 풀 코드 스위치의 동작위치 인식 시스템에 대한 연구)

  • Choi, Nam-Sup;Lee, Buhm
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.10a
    • /
    • pp.745-748
    • /
    • 2003
  • This paper presents a study on pull cord switch system which is employed in various industry for emergency stop of the equipments. By using power line communication(PLC) technique, in this paper, a new method for operation position detection of pull cord switch is suggested without complicated wiring of separate cables which utilize only 2 lines. Also, using control function of PLC IC, a reset signal for each switch reset can be implemented in the switch status control/sensing device. Finally, this paper shows validity and practical applicability of the proposed operating position sensing system of pull cord switch by implementing the system and revealing the response time and signal through the PLC line.

  • PDF

Surgical Treatment of Olecranon Fractures

  • Koh, Kyoung-Hwan;Oh, Hyoung-Keun
    • Clinics in Shoulder and Elbow
    • /
    • v.20 no.1
    • /
    • pp.49-56
    • /
    • 2017
  • Since the olecranon fractures are caused by relatively low-energy injuries, such as a fall from standing height, they are usually found without comminution. Less commonly they can be developed by high-energy injuries and have severe concomitant comminution or injuries to surrounding structures of the elbow. Because the fracture by nature is intra-articular with the exception of some avulsion-type fracture, a majority of olecranon fractures are usually indicated for surgical treatment. Even if there is minimal displacement, surgical treatment is recommended because there is a possibility of further displacement by the traction force of triceps tendon. The most common type of olecranon fracture is displaced, simple non-comminuted fracture (that is, Mayo type IIA fractures). Although tension band wiring was the most widespread treatment method for these fractures previously, there is some trends toward fixation using locking plates. Primary goal of the surgery is to restore a congruent joint and extensor mechanisms by accurate reduction and stable fixation so that range of motion exercises can be performed. The literature has shown that good clinical outcomes are achieved irrespective of surgical fixation technique. However, since the soft tissue envelope around the elbow is poor and the implants are located at the subcutaneous layer, implant irritation is still the most common complication associated with surgical treatment.

A New Global Routing Techniques for Gate Array (Gate Array의 Global Routing 기법)

  • Lee, Byeong-Ho;Jeong, Jeong-Hwa;Im, In-Chil
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.22 no.3
    • /
    • pp.60-67
    • /
    • 1985
  • A new glut bel routing technique for gate array is described in this paper. In former global routers the position of pins is considered to be in the center of the cell. So it is impossible to exactly estimate the number of signal lines passing through each channel. As a result, an overflow occurs and the overflow violates 100% wiring in detailed routing pro-cesses. Besides this, there are some problems in former global routers, for example, design time and cost, etc. This paper proposed a new algorithm in which pins ordering is considered to solve these problems. Using this algorithm, a global router is developed. Program experiments show the efficiency of the proposed algorithm.

  • PDF

A Study on the Wiring Control Method of Hand & Auto Operation of an Easy Elevator (간이 승강기 수·자동 배선제어방식에 관한 연구)

  • 위성동;구할본
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.16 no.4
    • /
    • pp.351-357
    • /
    • 2003
  • An easy learning elevator originated is opened to compare the existed teaming equipment, and it had a high studied efficiency that the sequence control circuit can open and close with the wire. The structure of equipment to be controlled from the first floor to the fifth floors is demostrated by the constructive apparatus with the lamps to express the function of the open-close of the door according to the cage moving with a mechanical actuation of the forward reverse breaker and the motor of load, and the mechanical actuation of hand-operation control components of push-button S/W and L/S and relay etc. These components let connect each other in order to control of the elevator function with the auto program and the designed sequence control circuit. Consequently the cage could go and come till 1∼5 steps with an auto program of the elevator and the sequence control circuit. The sequence control circuit is controlled by the step of forward and reverse to follow as that the sensor function of L/S1 ∼ L/S5 let posit with the control switchs of S/W1 ∼ S/W5 of PLC testing panel and switchs of S/W1 ∼ S/W5 installed on the transparent acryl plate of the frame. In here, improved apparatus is the hand-auto operation combined learning equipment to study the principle and technique of the originate sequence control circuit and the auto program of PLC.

Security Monitoring System for Apartment House Building Using Paver Line Carrier (전력선 통신을 이용한 집단주택 안전관리 시스템)

  • Kim, In-Soo;Kim, Kwan-Ho;Kim, Yo-Hee
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.476-478
    • /
    • 1993
  • Instead of installing new communication wiring to each house in the apartment house building. the power distribution network. which is already installed in the building. can be use as communication medium. In a safty management, by adoption of power line communication system, at remote we can monitor safty related sensors such as fire, gas leakage, burglar intrusion and emergency call which are located at each house. From this viewpoint, we developed security monitoring system for apartment house building using power lines. Security monitoring system consists of Power Line Communication-Sub Controller (PLC-SC). Power Line Communication-Main Controller (PLC-MC) and Management System (MS). Between a PLC-MC and a PLC-SC, the transmission rate is 1200 bps in power lines and modulation technique is frequency shirt keying (FSK). In between a PLC-MC and a MS, the transmission rate is 1200 bps in communication line (RS-485). As a result of this research. transmission loss is 0.1dB per meter of intrabuilding distribution network. Transmission can be reach in 250 meters. So it is enough to communicate for security monitoring system in apartment house building.

  • PDF

Reliability Assessment Methods for Electronic Component Removed Environmental Materials - focused on Printed Wiring Board without Pb and Br - (환경물질을 제외한 전자부품의 신뢰성평가 방법 연구 -Pb와 Br을 제거한 PWB를 중심으로-)

  • Lee Jong-Beom;Cho Jai-Rip
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.393-404
    • /
    • 2005
  • The environmental problem is a main subject of the 21C and an environment destruction phenomenon by various kinds of environmental materials is reaching serious level. Nations to be classified as the environmental developed country, are born again environmental rich country. And they earn a large income by trade Every kind environmental resource in an international commercial transaction. Especially, the study that a reliability assessment method to prevent to reliability problem to be happened when the solder lead(lead-free solder), non-cd component, non-bromide component(without the polybrominated biphenyls(PBB) and polybrominated diphenyl ethers(PBDE))and hexavalent chromium(Cr VI) clearance component and mercury-free applied to electronic equipment is progressed. As the result of the study for applying of a reliability assessment technique of lead-free solder that recognized the most of urgent problem at the company, combination accelerated life test could taken by adding and appling the part of a humidity acceleration part to Eyring Model which is proposed by R.E.Thomas. The reliability assessment methods study of PWB clean environmental materials is expected to respond to a reliability elevation and environmental material regulation policy spreading all over the world by beginning form Europe.

  • PDF

Evaluation of the Cu Target Fabricated by the SPS Technique and its Sputtered Film (방전플라즈마 소결법에 의해 제조된 Cu 타겟과 스퍼터링 박막의 특성평가)

  • Hyun, Hye Young;Kim, Min Jung;Yoo, Jung Ho;Yang, Jun-Mo;Oh, Ik Hyun;Lee, Seung Min;Oh, Yong Jun
    • Korean Journal of Metals and Materials
    • /
    • v.49 no.3
    • /
    • pp.250-255
    • /
    • 2011
  • The basic properties and electrical characteristics of sputtering films deposited with a commercial cast target and Spark Plasma Sintering (SPS) were compared and analyzed. From the results, the Cu film prepared heating $60^{\circ}C/min$ (SPS process) showed a similar specific resistance compared to the commercial cast Cu film. Also, auording to the results of XRD, SIMS, and TEM. There was not much difference in the crystal structure and impurities between the two films. Consequently, the SPS Cu target was found to have quite similar properties with the commercial one and it is expected to be applied in futare research to the metal wiring material for semiconductor/display devices.

Prevention of Complication and Management of Unfavorable Results in Reduction Malarplasty (광대뼈 축소성형술 시 합병증의 예방과 불만족스러운 결과에 대한 해결방안)

  • Yang, Jung Hak;Lee, Ji Hyuck;Yang, Doo Byung;Chung, Jae Young
    • Archives of Plastic Surgery
    • /
    • v.35 no.4
    • /
    • pp.465-470
    • /
    • 2008
  • Purpose: Reduction malarplasty is a popular aesthetic surgery for contouring wide and prominent zygoma. However a few patients complain postoperative results and want to revise the midfacial contour. We analyzed the etiology of unfavorable results and treated unsatisfied midfacial contours after reduction malarplasty. Methods: Total 53 patients were performed secondary operation for correction of unfavorable results after primary reduction malarplasty from elsewhere. Midfacial contour was evaluated with plain films and three-dimensional computed tomography. Unfavorable midfacial contours were corrected by secondary malarplasty. Flaring of zygomatic arch was reduced with infracturing technique and prominent zygomatic body was reduced with shaving. Drooped or displaced zygoma complex has been suspended to higher position and fixed with interosseous wiring. As adjuvant procedure, autologous fat injection has been performed in the region of depressed zygomatic body region. Results: The etiology of unfavorable midfacial contour after reduction malarplasty was classified into 7 categories: undercorrection of zygomatic arch(n=8), undercorrection of zygomatic arch and undercorrection of zygomatic body(n=6), undercorrection of zygomatic arch and overcorrection of zygomatic body(n=28), overcorrection of zygomatic body(n=3), simple asymmetry(n=4), malunion(n=2) or nonunion(n=2). Slim and balanced malar contour was achieved with treatment. And most of the patients were satisfied with the results of the surgery. Conclusion: To prevent the unfavorable results after reduction malarplasty, complete analysis of facial contour, choice of appropriate operation technique, precise osteotomy under direct vision, and security of zygoma position are important.

Targeting a Safe Entry Point for C2 Pedicle Screw Fixation in Patients with Atlantoaxial Instability

  • Chun, Hyoung-Joon;Bak, Koang-Hum
    • Journal of Korean Neurosurgical Society
    • /
    • v.49 no.6
    • /
    • pp.351-354
    • /
    • 2011
  • Objective : This investigation was conducted to evaluate a new, safe entry point for the C2 pedicle screw, determined using the anatomical landmarks of the C2 lateral mass, the lamina, and the isthmus of the pars interarticularis. Methods : Fifteen patients underwent bilateral C1 lateral mass-C2 pedicle screw fixation, combined with posterior wiring. The C2 pedicle screw was inserted at the entry point determined using the following method : 4 mm lateral to and 4 mm inferior to the transitional point (from the superior end line of the lamina to the isthmus of the pars interarticularis). After a small hole was made with a high-speed drill, the taper was inserted with a 30 degree convergence in the cephalad direction. Other surgical procedures were performed according to Harm's description. Preoperatively, careful evaluation was performed with a cervical X-ray for C1-C2 alignment, magnetic resonance imaging for spinal cord and ligamentous structures, and a contrast-enhanced 3-dimensional computed tomogram (3-D CT) for bony anatomy and the course of the vertebral artery. A 3-D CT was checked postoperatively to evaluate screw placement Results : Bone fusion was achieved in all 15 patients (100%) without screw violation into the spinal canal, vertebral artery injury, or hardware failure. Occipital neuralgia developed in one patient, but this subsided after a C2 ganglion block. Conclusion : C2 transpedicular screw fixation can be easily and safely performed using the entry point of the present study. However, careful preoperative radiographic evaluation, regardless of methods, is mandatory.

Arthroscopic Treatment of Fractures of the Intercondylar Eminence of the Tibia Using Pull-Out Wire (견인강선을 이용한 경골극 견열 골절의 관절경적 치료)

  • Kim, Hyun Kon;Kim, Sung Jae;Hahn, Myung Hoon;Kang, Yong Ho;Jung, Hwan Yong
    • Journal of the Korean Arthroscopy Society
    • /
    • v.2 no.1
    • /
    • pp.45-50
    • /
    • 1998
  • Recently, a variety of arthroscopic techniques have been reported for the treatment of the displaced tibial eminence fracture. The purpose of this study was to describe details of arthroscopic technique using pull-out wire and to evaluate the results. Eleven patients with irreducible type II and type III tibial eminence fractures underwent the arthroscopic reduction and internal fixation using double strand pull-out wiring. The anterior cruciate ligament tibial drill guide was utilized for the reduction of fracture and passage of the guide pins. The tibial eminence fracture was firmly fixed with double strand 26-gauge pull-out wire(0.45mm diameter). Fracture union was achieved at 7.2 weeks (range, six to eight weeks) after operation. All cases were united at the last follow-up. Subjectively, nine patients had no pain and no restriction of daily activities. Two patients with combined injuries had limitation of knee motion(10 to 130 degrees, respectively) and one patient showed mild anterior laxity. Early rehabilitation was enabled without loss of reduction and breakage of pull-out wire. The arthroscopic reduction and internal fixation using pull-out wire showed good results including early rehabilitation, early fracture union, minimal morbidity, and no requirement of the second operation for hard ware removal.

  • PDF