• Title/Summary/Keyword: Wire rope

Search Result 120, Processing Time 0.03 seconds

Modeling of Multi-Boom Floating Crane for Lifting Analysis of Offshore Wind Turbine (해상 풍력 발전기 리프팅 해석을 위한 해상 크레인 멀티 붐 모델링)

  • Park, Kwang-Phil;Cha, Ju-Hwan;Lee, Kyu-Yeul
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.35 no.1
    • /
    • pp.115-120
    • /
    • 2011
  • The dynamic responses of a 5 MW wind turbine lifted by a floating crane with two elastic booms are analyzed. Dynamic equations of motions of a multibody system that consists of a floating crane, two elastic booms, and a wind turbine are derived. The six-degree-of-freedom (DOF) motions for the floating crane and the wind turbine are considered in the equations of motions. The hydrostatic force, the hydrodynamic force due to a regular wave, the mooring force, the wire rope force, and the gravitational force are considered as external forces. By solving the equations numerically, the dynamic responses of cargo are simulated. The simulation results are compared with those in the case of one elastic boom. Finally, the dynamic responses of the wind turbine lifted by the floating crane are analyzed under regular wave condition.

Design and Implementation of Monitoring System for Submarine Optical fiber Cable Work (해저 광케이블 작업을 위한 모니터링 시스템의 설계 및 구현)

  • 이태오;정성훈;임재홍
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2002.05a
    • /
    • pp.205-208
    • /
    • 2002
  • When establishing the submarine optical fiber table between international and domestic, marine survey in advance it grasps the submarine geological features which is accurate and a depth of water condition. And the route which is safe for selecting and submarine optical fiber cable laying it is a work which secures an ease one location. If also, the PLGR the submarine of optical fiber table root the sea contamination material (rope, wire and net) it removes in advance and if the submarine of the optical fiber cable ease it does to arrive safely. And it is a work the Plough and ROV laying work hour laying work efficiency improvement and laying equipment it will be able to protect. So, This paper presents the monitoring system of ship information management and operation for marine survey and PLGR work in submarine optical fiber table construction enterprise. In order to achieve these purpose, overall serial multi-port communication modulo of configuration, realtime processing for management and operation of receiving data, realtime graph and a printout are described.

  • PDF

The Effect of Towline and Bridle on the Slewing Motion of Barge (예인삭 및 브라이들이 부선의 회두운동에 미치는 영향)

  • Yu, Chol;Lee, Sang-Min
    • Journal of Navigation and Port Research
    • /
    • v.35 no.6
    • /
    • pp.483-488
    • /
    • 2011
  • When a tug-barge navigates in the water, maneuvering ability of a tug is affected by the slewing motion of barge. Therefore it is necessary to decrease the slewing motion of a barge for safe towing work. We chose two different types of barge model and investigated their motion depending on the existence of bridle, towing speed and length of towline. The experiments are performed in the still water using the wire rope for the towline. A longer towline makes the heading angle smaller. The towing speed does not largely affect the turning of barge. Finally, it is noted that the bridle of a towing line decrease the slewing motion of barge more effectively.

Integrated Analytical-Numerical Approach to Compute the Energy on Rock-fall Protection Fence (해석적-수치해석적 방법을 통한 낙석방지울타리에 작용하는 에너지 분석)

  • Kim, Hee Su;Hwang, Youngcheol;Jang, Hyun-Ick;Ban, Hoki
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.12
    • /
    • pp.57-64
    • /
    • 2019
  • A man-made slope has been increased due to the construction of road. This slope lies at risk of rock falling, induced mostly by heavy rainfall. The MOLIT (Ministry of Land, Infrastructure and Transport) recommends the specific dimension of rockfall protection fence (post, wire-rope, and mesh) which should resist 48~61 kJ. However, the energy absorption capacity of each component of rockfall protection fence is not clearly presented. Hence, this study made an effort to compute the energy absorption capacity of each component in analytical and numerical method, and compared with each other.

A Study on Type Classification of Erosion Control Dam using Ecosystem Connectivity (생태연결성을 고려한 사방댐 유형분류에 관한 연구)

  • Koo, Gil-Bon;Kim, Min-Sik;Kim, Chul;Yu, Seung-mun
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.3
    • /
    • pp.483-493
    • /
    • 2011
  • Erosion control dams play a primary role in preventing or controlling natural disasters (landslide and debris flow etc.) and also conserve ecosystem in forested watersheds. This study examines structural characteristics of the dams such as the height of ecosystem control and the ecosystem permeability of the erosion control dams under standard drawings and the existing construction works. The objective of this study was to characterize the type classification of erosion control dams as ecosystem. Average permeability was highest on eco-piller dam (63.0%), followed in increasing order by wire rope (13.9%), silt dam (10.9%), multifunctional dam (7.2%), and gravity dam (0.4%). The height of ecosystem control was highest on gravity dam (3.2 m), followed in increasing order by multifunctional dam (1.7 m), wire rope dam (1.2 m), silt dam (0.6 m), and eco-piller dam (0.0 m). Criteria for defining the height of ecosystem control was indefinite. We grouped erosion control dams into three functional types (eco-connection, eco-semi connection, and eco-disconnection) by considering physical and structural characteristics such as the ecosystem permeability and the height of ecosystem control. The type of eco-connection (permeability > 20%) had connection areas from streambed to adjacent riparian areas, and these connection areas serve as ecosystem corridors for fauna and flora. Typical wildlife species includes mammals, reptiles, amphibians, and fishes. The type of eco-semi connection (5% < permeability < 20%) had < 2 m in the eco-barrier height from streambed, however, this type of dams partially serve as wildlife corridors and often provide fish ways. The type of eco-disconnection (permeability < 5%) had > 2 m in the eco-barrier height from streambed, thereby preventing wildlife movement.

Follow-Up Survey Fire Truck Deterioration (소방자동차 노후화에 따른 고장 발생원인 추적조사 연구)

  • Lee, Jang-Won;Kim, Eui-Tae;Rie, Dong-Ho
    • Fire Science and Engineering
    • /
    • v.29 no.3
    • /
    • pp.59-64
    • /
    • 2015
  • This study analyzed results of the causes of failure in 1,022 fire trucks currently being used in South Korea (aerial ladder, aerial platform, pumper, and chemical fire trucks). The results show that 46% of aerial ladder trucks have defective in the elevator brake systems, 29% of aerial platform trucks have contamination in the hydraulic oil, 37% of pumpers have defective in the pneumatic cylinders of the air supply system, and 39% of chemical fire trucks have defective in the powder fire extinguishing systems. The principal reasons for malfunctions are deterioration of the apparatuses, and accumulated fatigue from repetitive use of certain components, such as pneumatic cylinders in the air supply system and wire rope jamming in rollers in the ladder apparatus. These manufacturing defects should be improved upon in the manufacturing process. As a result, the fire trucks, which are used for 5 years or more, need precise inspections in accordance with the Regulation on Fire Apparatus Maintenance. Fire apparatuses have a service life of 10 to 12 years or more. They need to be replaced or require life extension, and they should be kept in top shape with the best maintenance for public safety.

Development of a Systemized Flying Net for Safety Improvement in Architectural Building Construction (건설 공사의 안전성 향상을 위한 충돌방지형 시스템 플라잉넷의 개발)

  • Lee, Jeong-Ho;Park, Seon-Joo;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.71-80
    • /
    • 2011
  • Flying net should be installed on every 3 or 4 construction floor from 8m above ground according to the rule. In the apartment housing construction, flying net installation work has been recognized the most dangerous work among the whole works because a small mistake of labors might make their death accident. Sub-contractors specialized in flying net have been developing various flying net types. However, most works of installing flying net as working with the developed system are performed outside the apartment housing, so that the risk of fall in works of installing supports and unfolding net is still high. Furthermore, as using the previously developed flying net labors might bump into the frame or the wire rope for supporting so that it makes secondary accidents. The objective of this research is to produce the proto-type of anti-collision flying net system based on the result of problem analysis on the installation and detachment process and suggest the improved anti-collision flying net system, which is able to improve safety and field applicability by conducting field experiment and analyzing performance.

Magnetic Flux Leakage based Damage Quantification of Steel Bar (누설자속기법을 이용한 강봉의 손상 정량화 기법)

  • Park, Jooyoung;Kim, Ju-Won;Yu, Byoungjoon;Park, Seunghee
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.1
    • /
    • pp.63-70
    • /
    • 2017
  • In this paper, a magnetic flux leakage(MFL) based steel bar damage detection was first researched to quantify the signals from damages on the wire rope. Though many researches inspecting damages using a MFL method was proceeded until the present, the researches are at the level that diagnose whether damages are or not. This has limitation to take measures in accordance with the damage level. Thus, a MFL inspection system was modeled using a finite element analysis(FEM) program dealing with electromagnetism problems, and a steel bar specimen was adopted as a ferromagnetic object. Then, an experimental study was also carried out to verify the simulation results with a steel bar which has same damage conditions as the simulation. The MFL signals was nearly not affected by the increase of the inspection velocity, and the magnitudes of the signals are not identical according to the change of the defect width even the defects have same depth. On the basis of the analysis, the signal properties from the damages were extracted to classify the type of damages, and it could be confirmed that classification of damages using extracted signal properties is feasible.

A Quantitative Risk Analysis of Related to Tower Crane Using the FMEA (타워크레인의 정량적 위험성 평가가법에 관한 연구(FMEA 기법 위주))

  • Shim, Kyu-Hyung;Rie, Dong-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.34-39
    • /
    • 2010
  • The purpose of this study is to suggest objective evaluation model as a plan to utilize as opportunity in establishing judgment standard of mutual inspection criteria and to upgrade inspection ability by reviewing and analyzing level of danger and importance in advance based on inspection results of inspection institutions regarding tower cranes used in construction fields. Tower crane is a mechanical device transporting construction supplies and heavy materials to places over 20~150M high from the ground for the period ranging from a short time of 2~3 months to two years after being installed in construction sites in vicinity of buildings or structures and is an important facility indispensable for construction sites. However, since use period after installation is short and professional technical ability of technicians working on-site about of tower crane is poor, systematic and quantitative safety management is not carried out As a part of researches on procedure of RBI(Risk Based Inspection) possible to apply to Knowledge Based System based on knowledge and experiences of experts as well as to tower cranes for solving these problems, quantitative RPN(Risk Priority Number) was applied to RPN utilizing technique of FMEA(Failure Mode and Effect Analyses). When general RBI 80/20 Rule was applied parts with high level of risks were found out as wire rope, hoist up/down safety device, reduction gear, and etc. However, since there are still many insufficient parts as risk analyses of tower crane were not established, it is necessary for experts with sufficient experiences and knowledge to supplement active RBI techniques and continuous researches on tower cranes by sharing and setting up data base of important information with this study as a starting point.

Regional cooperation of NOWPAP MERRAC against marine litter from sea-based activities in the Northwest Pacific region (북서태평양 지역의 해상기인 해양쓰레기 저감을 위한 NOWPAP 방제지역활동센터의 지역협력 활동현황 분석 및 향후 발전방향)

  • Noh, Hyon-Jeong;Oh, Jeong-Hwan;Kang, Seong-Gil;Kang, Chang-Gu
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.11 no.3
    • /
    • pp.150-159
    • /
    • 2008
  • The marine litter generated as by-products of human activities and economic development enters to the sea through rivers or stream Indirectly, and through sea-based activities directly. It is commonly comprised of materials that degrade very slowly, such as various plastic products, polystyrene, glass, rubber, metal, wood, derelict fishing nets, wire, rope and so on. Such litter is found in the water column and on the seafloor as well as coastal areas In the Northwest Pacific region. It causes injury or death of human and other living organisms and also accident or damage of the vessel. It is not only a problem of country but also regional and/or global problem because it is transported by currents and winds from one country to another. In this regard, Northwest Pacific Action Plan (NOWPAP) Marine Litter Activity (MALITA) project had been carried out during 2006-2007 biennium and NOWPAP Regional Action Plan on Marine Litter (RAP MALI) has been also continuously implemented in the 2008-2009 biennium as next phase step of MALITA. MERRAC, one of four Regional Activity Centres (RACs) of NOWPAP, has developed monitoring guidelines, sectoral guidelines, and brochures related to sea-based marine litter and port reception facilities and services through MALITA project. Based upon these output, MERRAC will continuously implement relevant activities of RAP MALI in order to help to establish and improve a regional mechanism to deal with the sea-based marine litter problem. This paper aims to introduce MERRAC activities under MALITA and RAP MALI, and to suggest several recommendations to reduce marine litter in the NOWPAP region.

  • PDF