• 제목/요약/키워드: Wind farm design

검색결과 82건 처리시간 0.024초

해상풍력단지 내부그리드의 전력손실비용에 관한 연구 (A Study on the Power Loss Cost of Inner-Grid in the Offshore Wind Farm)

  • 신제석;김성열;배인수
    • 조명전기설비학회논문지
    • /
    • 제28권3호
    • /
    • pp.72-77
    • /
    • 2014
  • The cross-section area of cable in the Offshore Wind Farm (OWF) is smaller than that in the onshore wind farm. Because the power loss in OWF is large relatively, the power loss is a key element for the economic evaluation of OWF design. The availability of wind turbine in OWF and the size of OWF are larger than those of onshore wind farm. If the economic evaluation of OWF ignores the availability of wind turbines, the power loss cost of OWF is overpriced. Since there are so many wind turbines, also, the calculation of power loss should be more accurate. In this paper, a method to calculate power loss is proposed for the design of big and complex inner-grid in OWF. The 99.5MW OWF is used for case study to see what effect the proposed method have on the power loss cost.

성산 풍력발전단지의 연간발전량 예측 정확도 평가 (Accuracy Assessment of Annual Energy Production Estimated for Seongsan Wind Farm)

  • 주범철;신동헌;고경남
    • 한국태양에너지학회 논문집
    • /
    • 제36권2호
    • /
    • pp.9-17
    • /
    • 2016
  • In order to examine how accurately the wind farm design software, WindPRO and Meteodyn WT, predict annual energy production (AEP), an investigation was carried out for Seongsan wind farm of Jeju Island. The one-year wind data was measured from wind sensors on met masts of Susan and Sumang which are 2.3 km, and 18 km away from Seongsan wind farm, respectively. MERRA (Modern-Era Retrospective Analysis for Research and Applications) reanalysis data was also analyzed for the same period of time. The real AEP data came from SCADA system of Seongsan wind farm, which was compare with AEP data predicted by WindPRO and Meteodyn WT. As a result, AEP predicted by Meteodyn WT was lower than that by WindPRO. The analysis of using wind data from met masts led to the conclusion that AEP prediction by CFD software, Meteodyn WT, is not always more accurate than that by linear program software, WindPRO. However, when MERRA reanalysis data was used, Meteodyn WT predicted AEP more accurately than WindPRO.

수치해석 기반 해상풍력단지 공존어업설비 기본설계 적정성 평가 (Basic design assessment of coexistent cage aquaculture an offshore wind farm based on numerical analysis)

  • 경두현;이호엽;강금석;박성민;강수원;김찬주
    • 풍력에너지저널
    • /
    • 제15권1호
    • /
    • pp.30-42
    • /
    • 2024
  • This paper examines the design feasibility of cage aquaculture coexistent with an offshore wind farm in the southwestern sea of South Korea. Among the many types of fish farms, 2 × 3 cage aquaculture was selected for the investigation and the initial design including mooring lines, bridles, etc. was drawn with iterative numerical simulations using Orcaflex. Experimental campaigns were conducted to validate the numerical results, and they were found to be in good agreement with the experiments. Using a validated numerical model, the tension of mooring lines and the deformed volumes of the facility were examined under given operating and survival conditions. The validated model will be further used to investigate various aspects of the cage farm design for design optimization.

다중 배제분석을 이용한 강원도 내 풍력발전단지 유망후보지 선정 (The Selection of Promising Wind Farm Sites in Gangwon Province using Multi Exclusion Analysis)

  • 박웅식;유능수;김진한;김관수;민덕호;이상우;백인수;김현구
    • 한국태양에너지학회 논문집
    • /
    • 제35권2호
    • /
    • pp.1-10
    • /
    • 2015
  • Promising onshore wind farm sites in Gangwon province of Korea were investigated in this study. Gangwon province was divided into twenty five simulation regions and a commercial program based on Reynolds averaged Navier-Stokes equation was used to find out wind resource maps of the regions. The national wind atlas with a period 2007-2009 developed by Korea institute of energy research was used as climatologies. The wind resource maps were combined to construct a wind resource map of Gangwon province with a horizontal spatial resolution of 100m. In addition to the wind resource, national environmental zoning map, distance from substation, residence and automobile road, Beakdudaegan mountain range, terrain slope, airport and military reservation district were considered to find out promising wind farm sites. A commercial wind farm design program was used to find out developable wind farm capacities in promising wind farm site with and without excluding environmental protection regions. The total wind farm capacities with and without excluding the protection regions were estimated to be 46MW and 598MW, respectively, when a 2MW commercial wind turbine was employed.

풍속 예측모델 기반 풍력발전단지의 퍼지 모델링 및 강인 안정도 해석 (Fuzzy Modeling and Robust Stability Analysis of Wind Farm based on Prediction Model for Wind Speed)

  • 이덕용;성화창;주영훈
    • 제어로봇시스템학회논문지
    • /
    • 제20권1호
    • /
    • pp.22-28
    • /
    • 2014
  • This paper proposes the fuzzy modeling and robust stability analysis of wind farm based on prediction model for wind speed. Owing to the sensitivity of wind speed, it is necessary to study the dynamic equation of the variable speed wind turbine. In this paper, based on the least-square method, the wind speed prediction model which is varied by the surrounding environment is proposed so that it is possible to evaluate the practicability of our model. And, we propose the composition of intelligent wind farm and use the fuzzy model which is suitable for the design of fuzzy controller. Finally, simulation results for wind farm which is modeled mathematically are demonstrated to visualize the feasibility of the proposed method.

제주 남동부 지역을 대상으로 한 WindPRO의 발전량 예측에 관한 연구 (Study on the Power Performance on WindPRO Prediction in the Southeast Region of Jeju Island)

  • 현승건;김건훈;허종철
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.184.1-184.1
    • /
    • 2010
  • In order to research the way to evaluate wind resource without actual Met Mast data, this paper has been carried out on the southeastern region of Jeju island, Korea. Although wind turbine has been an economical alternative energy resource, misjudging the prediction of lifetime or payback period occurs because of the inaccurate assessment of wind resource and the location of wind turbine. Using WindPRO(Ver. 2.7), a software for wind farm design developed by EMD from Denmark, wind resources for the southeastern region of Jeju island was analyzed, and the performance of WindPRO prediction was evaluated in detail. Met Mast data in Su-san 5.5Km far from Samdal wind farm, AWS in Sung-san 4.5km far from Samdal wind farm, and Korea Wind Map data had been collected for this work.

  • PDF

지형에 따른 육상풍력발전단지 난류강도 및 피로 하중 비교 분석 (Comparison Analysis of Turbulence Intensity and Fatigue Load of Onshore Wind Farms According to Terrain)

  • 김영휘;김민지;백인수
    • 풍력에너지저널
    • /
    • 제14권4호
    • /
    • pp.57-67
    • /
    • 2023
  • This study aimed to investigate differences in turbulence intensity and turbine loads among onshore wind farms located in various types of terrain. To achieve this, simulations were conducted for two onshore wind farms with identical wind turbines and capacity but situated on complex and flat terrains. The simulations used meteorological data gathered over a 10-year period from automatic weather stations nearest to the wind farms. WindSim and WindPRO software tools were employed for wind field and load analysis, respectively. The simulation results revealed that wind farm A, situated on complex terrain, exhibited significantly higher effective turbulence intensity than wind farm B on flat terrain, as expected. Consequently, the load indices of several wind turbines exceeded 100 % in wind farm A, indicating that the turbines could not reach their design lifespan. From the simulation study, aimed at reducing both the effective turbulence intensity and turbine loads, it became evident that while increasing turbine spacing could decrease effective turbulence intensity to some extent, it couldn't completely resolve the issue due to the inherently high ambient turbulence intensity on complex terrain. The problem with wind turbine loads could only be completely resolved by using wind turbines with a turbine class of A+, corresponding to a reference turbulence intensity of 0.18.

해상풍력발전단지 연간발전량 예측을 위한 MERRA 재해석 데이터 적용 타당성 연구 (A Feasibility Study on Annual Energy Production of the Offshore Wind Farm using MERRA Reanalysis Data)

  • 송원;김현규;변준호;백인수;유능수
    • 한국태양에너지학회 논문집
    • /
    • 제35권2호
    • /
    • pp.33-41
    • /
    • 2015
  • A feasibility study to estimate annual energy production of an offshore wind farm was performed using MERRA reanalysis data. Two well known commercial codes commonly used to wind farm design and power prediction were used. Three years of MERRA data were used to predict annual energy predictions of the offshore wind farm close to Copenhagen from 2011 to 2013. The availability of the wind farm was calculated from the power output data available online. It was found from the study that the MERRA reanalysis data with commercial codes could be used to fairly accurately predict the annual energy production from offshore wind farms when a meteorological mast is not available.

Design and analysis of offshore wind structure

  • Young-Suk You;Min-Young Sun;Young-Ho Lee
    • Advances in Computational Design
    • /
    • 제8권3호
    • /
    • pp.191-217
    • /
    • 2023
  • The objective of this study was to evaluate the foundation structure of a 3.6-MW wind turbine generator (WTG) installed offshore in Western Korea. The ultimate limit state (ULS) and fatigue limit state (FLS) of the multi-pile steel foundation (MSF) installed at the Saemangeum offshore wind farm were structurally investigated using the finite element (FE) software, ANSYS Workbench 19.0. According to the ULS analysis, no plastic deformation was found in any of the components constituting the substructure. At the same time, the maximal stress value reached the calculation limit of 335 MPa. According to the FLS results, the stress concentration factor (SCF) ranged from 1.00 to 1.88 in all components. The results of this study can be applied to determine the optimal design for MSFs.

이용률 관점에서의 최적 풍력발전기 선정에 대한 연구 (Investigation on Selecting Optimal Wind Turbines in the Capacity Factor Point of View)

  • 우재균;김병민;백인수;유능수;남윤수
    • 한국태양에너지학회 논문집
    • /
    • 제31권5호
    • /
    • pp.60-66
    • /
    • 2011
  • Selecting optimal wind turbine generators for wind farm sites in the capacity factor point of view is performed in this study. A program to determine the best wind turbine generator for the maximum capacity factor for a site was developed. The program uses both the wind characteristics of the site of interest and the power curves of the wind turbines. The program developed was applied to find out optimal wind turbine generators of three different sites in complex terrain and successfully yielded the best site dependent wind turbine generators. It was also used to determine the best wind turbine generator of the wind farm currently operating in Korea and proved its usefulness. The program and methodology developed in this study considered to be very useful at the initial design stage of the wind farm to determine the best wind turbine generators for the site of interest.