• 제목/요약/키워드: Wind Power System

검색결과 1,648건 처리시간 0.029초

제주와 강원 지역의 낙뢰특성 및 풍력발전기의 낙뢰피해 비교 연구 (A Comparative Study on Lightning Characteristics and Lightning Damage to Wind Turbines of Jeju and Gangwon Region)

  • 양달승;김경보;고경남
    • 동력기계공학회지
    • /
    • 제18권5호
    • /
    • pp.137-143
    • /
    • 2014
  • An investigation on lightning characteristics and damage to wind turbines was performed on Jeju and Gangwon regions. The lightning data from January 2010 to September 2013 detected by IMPACT ESP were collected and analyzed in detail. Hangyeong and Seongsan wind farms of Jeju province and Taebaek, Changjuk, Taegisan and Gangwon wind farms of Gangwon province were selected for this study. Lightning rates and lightning damage events at the six wind farms were compared with each other. Lightning maps for the two regions were drawn using lightning frequency data. As a result, lightning frequency of Gangwon region was higher than that of Jeju region, while lightning strength of Gangwon was weaker than that of Jeju. Lightning rates were assessed to be good for all of the six wind farms. No lightning damage to wind turbines occurred at the two wind farms of Jeju, while some lightning damage to wind turbines took place at the four wind farms of Gangwon.

대학교 캠퍼스 소형풍력발전기 설치 및 발전량 예측에 관한 연구 (The Prediction of the location and electric Power for Small Wind Powers in the H University Campus)

  • 조관행;윤재옥
    • KIEAE Journal
    • /
    • 제12권1호
    • /
    • pp.127-132
    • /
    • 2012
  • The energy consumption in the world is growing rapidly. And the environmental issues of climate become a important task. The interest in renewable energy like wind and solar is increasing now. Especially, by reducing power transmission loss, a small wind power is getting attention at the residential areas and campus of university. In this study, we attempted to estimate and compare the wind energy density using wind data of AWS (Automatic Weather Station) of H University. In this case of a campus, the weibull distribution parameter C is 2.27, and K is 0.88. According to the data, the energy density of the small wind power is 12.7 W/m2. We did CFD(Computational Fluid Dynamics) simulations at H University campus by 7 wind directions(ENE, ESE, SE, NW, WNW, W, WSW). In the results, we suggest 4 small wind powers. The small wind power generating system can produce 4,514kWh annually.

풍력발전기 운영시스템의 설계 (The Design of Operating System on Wind Power Plant)

  • 양수영;권준아;김원중
    • 한국전자통신학회논문지
    • /
    • 제6권1호
    • /
    • pp.135-141
    • /
    • 2011
  • 현재 전 세계적으로 신재생에너지에 대한 수요가 증가함에 따라, 국내의 풍력발전기 산업도 더욱 활발해지고 있다. 선진국에서는 이미 많은 풍력발전기를 보유하고 운영/제어하는 기술을 가지고 있지만, 우리나라의 풍력발전기과 관련된 기술은 많이 뒤져 있다. 따라서, 최근 국내에 설치되어 운용중인 대부분의 풍력발전기에서 활용 중인 운영 시스템은 대부분 외산 제품을 도입하여 사용하고 있는 실정이다. 선진국들은 이미 확보한 최적화된 운영 및 제어 기술력을 바탕으로 자국의 풍력발전기 산업을 보호하면서, 전 세계적으로 거대한 시장을 형성하고 있다. 본 연구에서는 풍력 발전기의 효율적인 운영과 제어를 지원하기 위한 풍력발전기 운영 프로토타입 시스템 HMI(Human Machine Interface)을 설계하였다.

동기기를 사용한 계통연계형 가변속 풍력발전 시스템의 AC-DC-AC 컨버터 구현 및 제어 (Implementation and Control of AC-DC-AC Power Converter in a Grid-Connected Variable Speed Wind Turbine System with Synchronous Generator)

  • 송승호;김성주;함년근
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제54권12호
    • /
    • pp.609-615
    • /
    • 2005
  • A 30kW electrical power conversion system is developed for a variable speed wind turbine. In the wind energy conversion system(WECS) a synchronous generator with field current excitation converts the mechanical energy into electrical energy. As the voltage and the frequency of the generator output vary according to the wind speed, a 6-bridge diode rectifier and a PWM boost chopper is utilized as an ac-dc converter maintaining the constant dc-link voltage with only single switch control. An input current control algorithm for maximum power generation during the variable speed operation is proposed without any usage of speed sensor. Grid connection type PWM inverter converts dc input power to ac output currents into the grid. The active power to the grid is controlled by q-axis current and the reactive power is controlled by d-axis current with appropriate decoupling. The phase angle of utility voltage is detected using software PLL(Phased Locked Loop) in d-q synchronous reference frame. Experimental results from the test of 30kW prototype wind turbine system show that the generator power can be controlled effectively during the variable speed operation without any speed sensor.

해상풍력 발전사업의 합리적 절차를 위한 제도개선 방안 : 인허가를 중심으로 (System Improvement Measures for Rational Procedures of Offshore Wind Power Generation Projects : Focusing on Permits)

  • 강석규;문정갑;조문관
    • 수산경영론집
    • /
    • 제54권2호
    • /
    • pp.59-76
    • /
    • 2023
  • This study is to propose ways to improve the system for rational procedures for offshore wind power generation projects. The results of this study are summarized as follows. In order to quickly distribute and develop offshore wind power projects, the permitting period should be shortened through special laws, the government actively intervenes to support the formation and operation of privat-public councils to ensure residents' acceptance. In this way, it can be competitive in the future energy market. Above all, a special law (proposal) related to offshore wind power currently pending in the National Assembly should be passed as soon as possible. Finally, the government and local governments that manage public waters should provide active administrative support based on system improvement measures in consideration of these permits, and the project's main body should minimize damage to the marine environment and ecosystem. Through these subject-specific roles, offshore wind power generation will be able to reduce carbon emissions and help establish a sustainable energy production system.

농형 유도발전기와 권선형 유도발전기의 특성비교 (Comparison of Squirrel cage and Wound induction generator characteristics in Wind Power System)

  • 김찬기;이원교;임철규
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2005년도 전력전자학술대회 논문집
    • /
    • pp.469-471
    • /
    • 2005
  • Wind farms employs induction generators which are two type, one is Squirrel cage for fixed speed wind turbines and the other is Wound induction generator (doubly fed induction generator DFIG) for variable speed wind turbines. this paper describes grid connection scheme of wind power system using two type induction generators and simulation results show the characteristics of two type induction generators.

  • PDF

HESS가 연계된 상명풍력발전단지의 모델링과 해석 (Modeling and Analysis of Sangmyeong Wind Farm with HESS)

  • 신현;김일환
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2019년도 전력전자학술대회
    • /
    • pp.422-423
    • /
    • 2019
  • In accordance with the Carbon-Free Island by 2030 policy of Jeju Special Self-Governing Province, renewable energy sources are increasing in Jejudo Island. Due to the intermittent output characteristics of wind turbines, one of the renewable energy sources, which can cause unbalanced system conditions between the demand load and the power generation of Jejudo Island. The Korea Power Exchange limits the output of wind turbines for stabilizing the Jeju power system. Therefore, this paper proposes a method to supply a limited output of Sangmyeong Wind Farm in Jeju Power system to Energy Storage System(ESS) and Water Electrolysis Device(WED). The voltage and frequency fluctuation of the Jeju power system is checked accordingly. The simulation results are performed using the PSCAD/EMTDC program.

  • PDF

풍력발전시스템의 적응백스테핑 속도제어기 설계 (Design of an Adaptive Backstepping Speed Controller for the Wind Power Generation System)

  • 현근호
    • 전기학회논문지P
    • /
    • 제54권4호
    • /
    • pp.211-216
    • /
    • 2005
  • In this paper a robust controller using adaptive backstepping technique is proposed to control the speed of wind power generation system. To make wind power generation truly cost effective and reliable, advanced and robust control algorithms are derived to on-line adjust the excitation winding voltage of the generator based on both mechanical and electrical dynamics. This method is shown to be able to achieve smooth and asymptotic rotor speed tracking, as justified by analysis and computer simulation.

Hybrid Secondary Voltage Control combined with Large-Scale Wind Farms and Synchronous Generators

  • Kim, Jihun;Lee, Hwanik;Lee, Byongjun;Kang, Yong Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권2호
    • /
    • pp.399-405
    • /
    • 2014
  • For stable integration of large-scale wind farms, integration standards (Grid codes) have been proposed by the system operator. In particular, voltage control of large-scale wind farms is gradually becoming important because of the increasing size of individual wind farms. Among the various voltage control methods, Secondary Voltage Control (SVC) is a method that can control the reactive power reserve of a control area uniformly. This paper proposes hybrid SVC when a large-scale wind farm is integrated into the power grid. Using SVC, the burden of a wind turbine converter for generating reactive power can be reduced. To prove the effectiveness of the proposed strategy, a simulation study is carried out for the Jeju system. The proposed strategy can improve the voltage conditions and reactive power reserve with this hybrid SVC.

Optimal Power Control Strategy for Wind Farm with Energy Storage System

  • Nguyen, Cong-Long;Lee, Hong-Hee
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.726-737
    • /
    • 2017
  • The use of energy storage systems (ESSs) has become a feasible solution to solve the wind power intermittency issue. However, the use of ESSs increases the system cost significantly. In this paper, an optimal power flow control scheme to minimize the ESS capacity is proposed by using the zero-phase delay low-pass filter which can eliminate the phase delay between the dispatch power and the wind power. In addition, the filter time constant is optimized at the beginning of each dispatching interval to ensure the fluctuation mitigation requirement imposed by the grid code with a minimal ESS capacity. And also, a short-term power dispatch control algorithm is developed suitable for the proposed power dispatch based on the zero-phase delay low-pass filter with the predetermined ESS capacity. In order to verify the effectiveness of the proposed power management approach, case studies are carried out by using a 3-MW wind turbine with real wind speed data measured on Jeju Island.