• Title/Summary/Keyword: Wind Energy Production

Search Result 272, Processing Time 0.023 seconds

Power Performance Testing and Uncertainty Analysis for a 3MW Wind Turbine (3MW 풍력발전시스템 출력 성능시험 및 불확도 분석)

  • Kim, Keon-Hoon;Hyun, Seung-Gun
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.6
    • /
    • pp.10-15
    • /
    • 2010
  • The installed capacity of wind turbines in KOREA are growing and enlarging by the central government's support program. Thus, the importance of power performance verification and its uncertainty analysis are recognizing rapidly. This paper described the power testing results of a 3MW wind turbine and analysed an uncertainty level of measurements. The measured power curves are very closely coincide with the calculated one and the annual power production under the given Rayleigh wind speed distribution are estimated with the 3.6~12.7% of uncertainty but, in the dominant wind speed region as 7~8m/s, the uncertainty are stably decreased to 6.3~5.3%.

Optimal Design of a Direct-Driven PM Wind Generator Aimed at Maximum AEP using Coupled FEA and Parallel Computing GA

  • Jung, Ho-Chang;Lee, Cheol-Gyun;Hahn, Sung-Chin;Jung, Sang-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.4
    • /
    • pp.552-558
    • /
    • 2008
  • Optimal design of the direct-driven Permanent Magnet(PM) wind generator, combined with F.E.A(Finite Element Analysis) and Genetic Algorithm(GA), has been performed to maximize the Annual Energy Production(AEP) over the entire wind speed characterized by the statistical model of wind speed distribution. Particularly, the proposed parallel computing via internet web service has contributed to reducing excessive computing times for optimization.

Prospects of wind energy on Penghu Island, Taiwan

  • Chen, Tsai-Hsiang;Tran, Van-Tan
    • Wind and Structures
    • /
    • v.20 no.1
    • /
    • pp.1-13
    • /
    • 2015
  • This study applied long-term wind speed data from Penghu and Dongjidao weather stations to simulate the wind energy production for eight onshore and one offshore wind farms at Penghu Island, Taiwan by a commercial software package, Wind Atlas Application Program (WAsP). In addition, the RET Screen software suite was also applied to analyze economic characteristics of these nine wind farms (WFs). The results show that the capacity factors (CFs) of the nine wind farms mentioned above are in the range of 44.5% to 49.1%. In addition, utilizing 1.8-MW wind turbines (WTs) for all onshore WFs was the most feasible selection among the four potential types of WTs (600, 900, 1,800 and 3,600 kW) considered. 3-MW WTs selected for the offshore WF can produce the most wind energy and the smallest wake loss among the three possible types of WTs (1, 2 and 3MW). As a consequence of implementing these WFs, the emission of about 680,977 tons carbon dioxide ($tCO_2$) into the local atmosphere in Penghu Island annually could be avoided. Finally, based on the payback periods achieved, the order of implementation of the considered WFs can be identified more clearly. Longmen WF should be the first priority, and the next one should be SiyuWF and so on. Besides, this study provides much useful information for WF planning on Penghu Island.

Case Study of Wind Farm Design Using OpenWind - Youngdeok Wind Farm (OpenWind를 이용한 풍력단지설계 사례연구 -영덕풍력단지)

  • Kim, Hyun-Goo;Hwang, Hyo-Jeong;Kim, Ju-Hyun;Ko, Soo-Hee;Jung, Woo-Sik
    • Journal of Environmental Science International
    • /
    • v.19 no.9
    • /
    • pp.1169-1175
    • /
    • 2010
  • A case study for the design of a wind farm in complex terrain was carried out using the wind farm site analysis software OpenWind, which has an open-source platform and is free to use. The Youngdeok Wind Farm, constructed on mountainous terrain in Korea, was chosen as a model site; the design process reproduced using OpenWind. A comparison of the positions of the wind turbine derived from the OpenWind optimization process and the current positions were in good agreement. The annual energy production predicted by OpenWind compared with the prediction by the micrositing software, WindSim, were also validated to within 1%. Therefore, it was confirmed that OpenWind can be used for a practical wind farm design project. It is also anticipating that this paper will provide a prototype process for the design of a wind farm site and offer a database for the post-evaluation of a constructed wind farm in Korea.

Comparative Analysis of Commercial Softwares for Wind Climate Data Analysis (풍력자원 계측자료 분석용 상용 소프트웨어 비교분석)

  • Kim, Hyun-Goo
    • New & Renewable Energy
    • /
    • v.6 no.2
    • /
    • pp.5-11
    • /
    • 2010
  • This paper reviews three commercial softwares for wind climate data analysis in wind resource assessment; WAsP/Observed Wind Climate, WindRose and Windographer. Windographer is evaluated as the best software because of its variety of input data format, analysis functions, easiness of user interface, etc. For a quantitative understanding of uncertainty depending on software selection, a benchmark is carried out with the met-mast observation dataset at the Gimnyeong Wind Turbine Performance Test Site. It is found that Weibull parameter calculation and air density correction have a dependency on the software so that such uncertainty should be considered when an analysis software is selected. It is confirmed that annual energy production calculated by WAsP using a statistical table of frequency of occurrence may have some error compared to a time-series calculation method used by the other softwares.

Assessment of Wind Turbine Load and Performance Effects by Yaw Control (풍력 터빈의 요 제어에 따른 하중 및 성능 영향성 평가)

  • Kim, Jin;Kim, Ji Yon;Koh, Jang Wook;Kweon, Ki Yeong
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.46-52
    • /
    • 2013
  • The wind generally includes turbulence characteristics in nature. So the yaw errors between wind turbine direction and wind direction occur due to turbulence fluctuation. The yaw errors affect the fatigue load of wind turbine system and power reduction. The components of turbulence intensity are different from those of each site where the wind turbines are installed. We studied that the fatigue load and power efficiency are improved by controlling yaw motions. In this study, we controlled the averaged yaw error time according to site conditions by turbulence intensity.

Power Performance Testing and Uncertainty Analysis for a 1.5MW Wind turbine (1.5MW 풍력발전시스템 출력 성능시험 및 불확도 분석)

  • Kim, Keon-Hoon;Ju, Young-Chul;Kim, Dae-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.4
    • /
    • pp.63-71
    • /
    • 2006
  • The installed capacity of wind turbines in KOREA are growing and enlarging by the central government's support program. Thus, the importance of power performance verification and its uncertainty analysis are recognizing rapidly. This paper described the Power testing results of a 1.5MW wind turbine and analysed an uncertainty level of measurements. The measured power curves are very closely coincide with the calculated one and the annual power production under the given Rayleigh wind speed distribution are estimated with the $4.7{\sim}22.0%$ of uncertainty but, in the dominant wind speed region as $7{\sim}8m/s$, the uncertainty are stably decreased to $7{\sim}8%$.

Current Situation of Renewable Energy Resources Marketing and its Challenges in Light of Saudi Vision 2030 Case Study: Northern Border Region

  • AL-Ghaswyneh, Odai Falah Mohammad
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.3
    • /
    • pp.89-94
    • /
    • 2022
  • The Saudi Vision 2030 defined the directions of the national economy and market towards diversifying sources of income, and developing energy to become less dependent on oil. The study sought through a theoretical review to identify the reality of the energy sector and the areas of investment available in the field of renewable energy. Findings showed that investment in the renewable energy sector is a promising source according to solar, wind, hydrogen, geothermal energy and burning waste than landfill to extract biogas for less emission. The renewable energy sector faces challenges related to technology, production cost, price, quantity of production and consumption, and markets. The study revealed some recommendations providing and suggested electronic marketing system to provide investors and consumers with energy available from renewable sources.

Reassessment of Economic Feasibility for a Wind Farm on Jeju Island Considering Variable Jeju SMP (변동 제주 SMP를 적용한 제주도 육상풍력단지의 경제성 재평가)

  • Kim, Hyo-Jeong;Ko, Kyung-Nam;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.5
    • /
    • pp.41-50
    • /
    • 2013
  • Economic feasibility study using weighted average variable Jeju System Marginal Price, SMP, was conducted for Gasiri wind farm of Jeju Island. To predict the variable Jeju SMP, generator share ratio for SMP was calculated from the real time wind power production and the power demand data for years. Also, sensitivity analysis on Net Present Value, NPV, and Benefit/Cost Ratio, B/C ratio, were performed to clarify which factors are more important in assessing economic feasibility. The result shows that the Gasiri wind farm has a minimum of 110 billion won and a maximum of 132 billion won difference between fixed and variable SMP. Also, Capacity Factor, C.F., had the highest sensitivity for NPV, followed by SMP. Accordingly, when economic analysis for a potential wind farm site is carried out, the variable SMP as well as C.F. should be considered for more accurate assessment of the wind farm.

The Effects of Wind Power Generation Exports on the National Economy (풍력발전 해외수출의 경제적 파급효과 분석)

  • Jin, Se-Jun;Jeong, Dong-Won;Kwon, Yong-O;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.281-291
    • /
    • 2012
  • Recently, global economy has recovered and aspects of the renewable energy industry in the global competition is more fierce, the new growth engines of the major countries, including the United States and China, industry promotion policy as being deployed. Major advanced countries and Korea also invested a lot of money to wind power development as a part of renewable energy development and promoting the construction of wind power generation. The global wind power generation market is expected to further increase the scale to about 70 billion US dollars, thus, Korea as well as the installation of domestic wind power overseas actively considering. This study uses input-output analysis to estimate the role of wind power generation sector exports national economy. More specifically, this study shows what national economy effect of production-inducing effect, value-added inducing effect, and employment-inducing effect are explored with demand-driven moel. After define wind power generation sector what small sized of Input-Output table 168 sectors among 11 sectors, this study pays particular and close attention to wind power generation sector by taking the sector as exogenous specification and then investigating economic impacts of it. The wind power generation exportation case of overseas 100 billion won, production-inducing effect, value-added inducing effect, and employment-inducing effect are 205 billion won, 68 billion won and 1,054 persons, respectively. These quantitative information can be usefully utilized in the policy-making for the industrialization of wind power generation exports.