• 제목/요약/키워드: Wind Energy

검색결과 2,938건 처리시간 0.026초

녹색섬 풍력자원평가 - 독도 (Wind Resource Assessment for Green Island - Dokdo)

  • 김현구;김건훈;강용혁
    • 한국태양에너지학회 논문집
    • /
    • 제32권5호
    • /
    • pp.94-101
    • /
    • 2012
  • A Dokdo wind resource map has been drawn up for the Green Island Energy Master Plan according to Korea's national vision for 'Low Carbon Green Growth'. The micro-siting software WindSim v5.1,which is based on Computational Flow Analysis, is used with MERRA reanalysis data as synoptic climatology input data, and sensitivity analysis on turbulence model is accompanied. A wind resource assessment has been conducted for the Dokdo wind power dissemination plan, which consists of two 10kW wind turbines to be installed at the Dongdo dock and Dokdo guard building. It is evaluated that the capacity factors at Dongdo dock and Dokdo guard building are about 20% and 30% respectively, and annual and hourly variations of wind power generation have been analyzed, but summertime energy production is predicted to be only 40% of wintertime energy production.

라이다 측정을 이용한 나셀 풍속계 보정식 제안 (Calibration Equation for Nacelle Anemometer Derived by LIDAR Measurements)

  • 김현구;안해준;양승주;박우재;김석우
    • 신재생에너지
    • /
    • 제9권1호
    • /
    • pp.12-16
    • /
    • 2013
  • The nacelle anemometer mounted behind the blade roots of a wind turbine measures distorted wind speed comparable with free-stream wind because of the wake effects caused dependent upon the operation of the wind turbine and the rotation of its blades. The field campaign was carried out to measure free-stream wind speed at a height identical to the height of the nacelle anemometer by deploying a ground-based remote-sensing equipment, LIDAR. It is derived that a third-order polynomial equation for correcting wind speed measured by the nacelle anemometer to undistorted free-stream wind speed incident to a wind turbine. It is anticipated that the derived correction equation enables wind speed measured by the nacelle anemometer to be used as a precise input for a wind turbine performance test and for developing an active control logic.

3MW 풍력발전시스템 출력성능평가에 관한 연구 (The Power Performance Testing for 3MW Wind turbine System)

  • 고석환;장문석;박종포;이윤섭
    • 한국태양에너지학회 논문집
    • /
    • 제31권4호
    • /
    • pp.19-26
    • /
    • 2011
  • We are carried out power performance testing for 3MW wind turbine system at Je-ju wind turbine testing Site and analyzed measured data which was stored through monitoring system. In this paper, we described the power performance testing results and analyzed an uncertainty of measured data sets. The power curve with measured power data is closely coincide with designed power curve except for the low wind speed sections(4m/s~7m/s) and the annual energy production which is given Ray leigh distribution was included with 1.5~5.9% of uncertainty in the wind speed region as 4~11m/s. Although the deviation of curve between measured power and designed power is high, the difference of annual energy production is low in the low wind speed region.

해상부이 데이터 분석을 통한 한반도 해역의 바람자원 평가 (Assessment of Wind Resource Around the Korean Peninsula by Using Marine Buoys Datasets)

  • 오기용;김지영;이준신
    • 신재생에너지
    • /
    • 제7권1호
    • /
    • pp.15-21
    • /
    • 2011
  • In recent years, many countries have been endeavoring to exploit the offshore wind energy in terms of overcoming the limitations of on-land wind energy. Considering that mountains cover 70 percent of the Korean Peninsula and arable plains for wind energy are negligibly small, Korean government aggressively drives the offshore wind development of the Korean Peninsula. As part of preliminary investigation of offshore wind resources, KEPCO-RI (Korea Electric Power Corporation-Research Institute) has been analyzing marine buoy datasets measured at 5 positions over the period of 12 years, including estimation of extreme wind speed. It can be observed that variation of yearly wind speed, monthly wind speed as well as frequency distribution of wind direction. Wind classes of buoy sites are estimated by extrapolated average wind speed using log law. In addition, wind turbine class based on IEC code is assessed for evaluation of suitable wind turbine.

군산풍력발전단지의 풍력발전량 단기예측모형 비교에 관한 연구 (A study on comparing short-term wind power prediction models in Gunsan wind farm)

  • 이영섭;김진;장문석;김현구
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권3호
    • /
    • pp.585-592
    • /
    • 2013
  • 최근 신재생에너지와 대체에너지의 필요성이 증가함에 따라 환경오염과 온실효과를 초래하지 않는 풍력에너지 개발에 많은 연구와 투자가 이루어지고 있다. 풍력에너지는 무공해 에너지이며 자원양이 무한대이고 바람이 부는 곳이라면 어디에서든지 전력생산이 가능하다. 그러나 풍력에너지는 바람에 크게 의존하며 불규칙적인 특성이 있어 효율적인 풍력발전이 어렵다는 단점이 있다. 이러한 이유로 풍력발전에 있어서 정확한 풍력발전량 예측은 매우 중요한 요소이다. 본 연구에서는 이러한 풍력발전량의 효율적인 예측을 위해 군산 풍력단지의 자료를 이용해 시계열모형인 ARMA모형과 데이터 마이닝 기법 중 신경망모형을 사용하여 풍력발전량을 예측하고 비교분석 하였다. 그 결과 신경망모형 적합결과가 ARMA모형 적합결과 보다 더 좋은 예측력을 나타내었다.

새만금 고군산군도의 풍자원 측정 및 분석 (Measurement and Analysis of Wind Energy Potential in Kokunsando of Saemankeum)

  • 심애리;최연성;이장호
    • 신재생에너지
    • /
    • 제7권2호
    • /
    • pp.51-58
    • /
    • 2011
  • Saemankeum is well known for its high speed wind, and it is known that the blueprint of a future city around Saemankeum, including new industrial complex, has been planned. As a result, large-scale offshore wind farm, on the basis of the measurement of wind resource for a long time, can be considered, so that generated electricity can be used to meet the energy demand near the wind farm. Wind speed in Kokunsando of Saemankeum is measured and analyzed with its statistical distribution and wind directions. The probability of wind power resource over Kokunsando of Saemangeum is reviewed with the measured data in one island of Kokunsando. According to measured data, the shape and scale factor of Weibull distribution of wind speed are obtained, and then power density is analyzed as well. Through this study, it is clear that the Saemangeum area has a fluent and abundant wind power source to develop the wind farm in Korea.

도로인접성에 따른 육상 풍력자원 잠재량 평가 (Evaluation of Onshore Wind Resource Potential According to the Road Proximity)

  • 김현구;황효정;강용혁;윤창열
    • 신재생에너지
    • /
    • 제9권4호
    • /
    • pp.13-18
    • /
    • 2013
  • Wind turbines should generally be installed at a certain distance from a road to ensure passengers' safety. In Korea, there is no clear guidance as the Ministry of Environment first proposed a road setback distance of 400 m in the Onshore Wind Farm Siting Guidelines draft proposed in July 2012, and then modified it to 1.5 times the height of the wind turbine in October of the same year. This study analyzed the dynamic range of onshore wind resource potential according to how the road setback distance is set using the Korea Wind Atlas with 100m spatial resolution made by the Korea Institute of Energy Research, the transportation network of the Ministry of Construction and Transportation, and the forest road network of the Korea Forestry Service. Owing to the geographical characteristics of Korea, where mountainous terrain accounts for 70% of the total territory, the wind resource potential within 1 km from forest roads are estimated to be 14.3 GW, 14% of Korea's total wind resource potential. In addition, the construction distance of new road for transporting wind turbines from the existing road to a wind farm site is estimated as less than 2 km. Given the limited wind resource potential and geographical constraints, an assessment system that can maximize wind resource utilization and ensure road safety at the same time, and which takes into account the regional characteristics instead of applying the fixed road setback distance across-the-road, is required.

극한환경에서의 소형풍력발전 실증운전 (Demonstration of 10kw Wind Turbine System at the King Sejong Station)

  • 김석우;경남호
    • 한국태양에너지학회 논문집
    • /
    • 제26권4호
    • /
    • pp.25-30
    • /
    • 2006
  • 10kW wind turbine has been successfully commissioned at the King Sejong station in April, 2006. The wind turbine installed is a part of the R&D program for developing a solid wind/diesel hybrid power control system for a remote area such as Antarctica. At the same time, the current research aims to develop an anti-icing and de-icing technologies for a small wind turbine rated under 50kW. Since its commissioning, the turbine has generated about 500kWh for 47days without any system faults. Although sufficient data have not been obtained yet, any trouble has not occurred in the wind/diesel hybrid system based on the current analysis. Concerning on the environmental impact by the wind turbine operation, the turbine is installed within the station boundary in order to meet the Madrid protocol. Therefore, wind turbine operation meets the international requirements for preservation of antarctic ecosystem.

WindPRO의 예측성능 평가 (Evaluation of the Performance on WindPRO Prediction)

  • 오현석;고경남;허종철
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2008년도 추계학술발표대회 논문집
    • /
    • pp.300-305
    • /
    • 2008
  • Using WindPRO that was software for windfarm design developed by EMD from Denmark, wind resources for the western Jeju island were analyzed, and the performance of WindPRO prediction was evaluated in detail. The Hansu site and the Yongdang site that were located in coastal region were selected, and wind data for one year at the two sites were analyzed using WindPRO. As a result, the relative error of the Prediction for annual energy Production and capacity factor was about ${\pm}20%$. For evaluating wind energy more accurately, it is necessary to obtain lots of wind data and real electric power production data from real windfarm.

  • PDF

Hybrid wind-solar power deployment in India: Green Energy Open Access (GEOA) and Renewable Energy Certificates (REC)

  • Hardik K. Jani;Surendra Singh Kachhwaha;Garlapati Nagababu;Alok Das
    • Advances in Energy Research
    • /
    • 제8권4호
    • /
    • pp.243-252
    • /
    • 2022
  • The hybrid wind-solar energy concept has a big influence on the spread of wind and solar power projects in India since it combines the benefits of both industries while also providing extra benefits such as resource sharing such as land, infrastructure, and power evacuation systems. Furthermore, while the hybrid policy may reduce certain barriers to the installation of wind and solar energy in India, there are still some issues that must be resolved rapidly in order to ensure a sustainable installation. According to the study's findings, the installation of wind and solar power plants is significantly influenced by energy policy. The wind-solar hybrid energy strategy will also be crucial in the near future for growing the usage of renewable energy sources. Aside from that, the establishment of Green Energy Open Access (GEOA) and the restart of the trading of Renewable Energy Certificates (REC) would promote the quick deployment of standalone and hybrid renewable power projects throughout the nation, enabling it to reach 500 GW of installed non-fossil energy capacity by 2030.