• Title/Summary/Keyword: Win-HSPF

Search Result 9, Processing Time 0.035 seconds

Application of BASIN 4.0 and WinHSPF to a Small Stream in Total Water Pollution Load Management Area and Calibration of Model Parameter using Genetic Algorithm (오염총량관리지역내 소하천에 대한 BASINS 4.0 및 WinHSPF의 적용과 유전알고리즘을 이용한 매개변수의 보정)

  • Cho, Jae-Heon;Yun, Seoung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.1
    • /
    • pp.161-169
    • /
    • 2012
  • Recently various attempts have been made to apply HSPF model to calculate runoff and diffuse pollution loads of stream and reservoir watersheds. Because the role of standard flow is very important in the water quality modelling of Total Water Pollution Load Management, HSPF was used as a means of estimating standard flow. In this study, BASINS 4.0 and WinHSPF was applied to the Gomakwoncheon watershed, genetic algorithm(GA) and influence coefficient algorithm were used to calibrate the runoff parameters of the WinHSPF. The objective function is the sum of the squares of the normalized residuals of the observed and calculated flow and it is optimized using GA. Estimates of the optimum runoff parameters are made at each iteration of the influence coefficient algorithm. The calibration results showed a relatively good correspondence between the observed and the calculated values. The standard flow(Q275) of the Gomakwoncheon watershed was estimated using the ten years of weather data.

A Study on BASINS/WinHSPF for Evaluation of Non-point Source Reduction Efficiency in the Upstream of Nam-Han River Watershed (BASINS/WinHSPF를 이용한 남한강 상류 유역의 비점오염원 저감효율평가)

  • Yoon, Chun-Gyeong;Shin, Ah-Hyun;Jung, Kwang-Wook;Jang, Jae-Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.6
    • /
    • pp.951-960
    • /
    • 2007
  • Window interface to Hydrological Simulation Program-FORTRAN (WinHSPF) developed by the United States Environmental Protection Agency (EPA) was applied to the upstream of Nam-Han river watershed to examine its applicability for loading estimates in watershed scale and to evaluate non-point source control scenarios using BMPRAC in WinHSPF. The WinHSPF model was calibrated and verified for water flow using Ministry of Construction and Transportation (MOCT, 3 stations, 2003~2005) and water qualities using Ministry of Environment (MOE, 5 station, 2000~2006). Water flow and water quality simulation results were also satisfactory over the total simulation period. But outliers were occurred in the time series data of TN and TP at some regions and periods. Therefore, it required more profit calibration process for more various parameters. As a result, all the study was performed within the expectation considering the complexity of the watershed, pollutant sources and land uses intermixed in the watershed. The estimated pollutant load for annual average about $BOD_5$, T-N and T-P respectively. Nonpoint source loading had a great portion of total pollutant loading, about 86.5~95.2%. In WinHSPF, BMPRAC was applied to evaluate non-point source control scenarios (constructed wetland, wet detention ponds and infiltration basins). All the scenarios showed efficiency of non-point source removal. Overall, the HSPF model is adequate for simulating watersheds characteristics, and its application is recommended for watershed management and evaluation of best management practices.

Analysis of Runoff Characteristics of Non-point Sources Pollutant and Application of BMP Using BASINS/WinHSPF Model (BASINS/WinHSPF 모형을 이용한 비점오염물질 유출특성 분석과 최적관리기법 적용)

  • Kim, Min Joo;Kim, Tae Geun
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.2
    • /
    • pp.88-100
    • /
    • 2014
  • This study analyzed runoff characteristics of non-point sources pollutant and evaluated removal of pollution by BMP(Best Management Practice) using BASINS/WinHSPF model. Hourly meterological data including input data was provided from 2010 to 2011 year to run HSPF model in Miho stream watershed. As the results of calibration and validation of the model, the model could be successfully performed to simulate the flow and water quality parameters. The apprehensive area of non-point source pollution was chosen by non-point source pollution per area of a tributary to the Miho stream and applied constructed wetland in area chosen. Three scenarios were based on installation area of an constructed wetland and HSPF model would be applied to estimate the pollutant removals through the constructed wetland. The removal rates of pollutants through the constructed wetland were estimated with the runoff and water quality parameters by the comparisons of before and after the constructed wetland application.

Application of BASINS/WinHSPF for Pollutant Loading Estimation in Soyang Dam Watershed (소양강댐 유역의 오염부하량 산정을 위한 BASINS/WinHSPF 적용)

  • Yoon, Chun-Gyeong;Han, Jung-Yoon;Jung, Kwang-Wook;Jang, Jae-Ho
    • Korean Journal of Ecology and Environment
    • /
    • v.40 no.2
    • /
    • pp.201-213
    • /
    • 2007
  • In this study, the Batter Assessment Science Integrating point and Nonpoint Sources (BASINS 3.0)/window interface to Hydrological Simulation Program-FPRTRAN (WinHSPF) was applied for assessment of Soyang Dam watershed. WinHSPF calibration was performed using monitoring data from 2000 to 2004 to simulate stream flow. Water quality (water temperature, DO, BOD, nitrate, total organic nitrogen, total nitrogen, total organic phosphorus and total phosphorus) was calibrated. Calibration results for dry-days and wet-days simulation were reasonably matched with observed data in stream flow, temperature, DO, BOD and nutrient simulation. Some deviation in the model results were caused by the lack of measured watershed data, hydraulic structure data and meteorological data. It was found that most of pollutant loading was contributed by nonpoint source pollution showing about $98.6%{\sim}99.0%$. The WinHSPF BMPRAC was applied to evaluate the water quality improvement. These scenarios included constructed wetland for controlling nonpoint source poilution and wet detention pond. The results illustrated that reasonably reduced pollutant loadin. Overall, BASINS/WinHSPF was found to be applicable and can be a powerful tool in pollutant loading and BMP efficiency estimation from the watershed.

A Study on the Discharge Characteristics of Pollutant Loads in Small Watershed According to the Probability Rainfall (확률 강우에 따른 홍수 전후의 소유역 오염부하량 배출특성 연구)

  • Kim, Phil-Sik;Kim, Sun-Joo;Shim, Jae-Hoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.6
    • /
    • pp.75-83
    • /
    • 2010
  • The objective of this paper is to study the discharge characteristics of pollutant loads in small watershed according to probability rainfall using the Hydrologic Simulation Program-Fortran (WinHSPF). The subwatershed of Gosam reservoir watershed in Gyeonggido province was simulated and the probability rainfall of study area was estimated by recurrence interval and duration. The probability rainfalls are 156.5, 205.9 and 277.4 mm for 6 hrs, 12 hrs and 24 hrs in 10 year frequency, and each probability rainfalls is distributed by Huff's 4th quantiles method and applied to HSPF. The pollutant loads were high for initial rainfall. The concentrations of TN, TP and BOD were high as rainfall duration is shorter and rainfall intensity is higher.

A study on the Discharge Charateristics of Nutrient Material according before and after Flood (홍수재해 전후의 영양물질 배출 특성 연구)

  • Kang, Seung-Mook;Kim, Sun-Joo;Ko, Jung-Hwan;Lee, Joo-Yong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.790-794
    • /
    • 2007
  • 본 연구에서는 경기도 안성시 쌍지리에 위치한 고삼저수지 상류의 소유역을 대상으로 홍수재해 전후의 토지이용별 유출량과 오염농도를 실측하여 분석하였으며, 강우 형태에 따른 오염물질의 배출특성을 알아보기 위해 유역관리모형인 BASINS/WinHSPF 모형을 적용하였다. 오염물질의 배출은 오염원의 형태뿐만 아니라 개별 오염원의 발생형태에 따라 수역으로 유입되는 물질량이 달라지며, 특히 강우의 영향에 의한 시기별 배출량의 변화가 크다. 이렇게 적용된 모형에 대상지구의 강우량, 강우강도, 강우지속시간 등의 확률강우를 적용하여 강우에 따른 홍수재해 전후의 오염물질 배출 특성을 파악하고 이에 따른 오염 물질 저감 방안에 대해 연구하였다.

  • PDF

A Study on Mulwang Reservoir Water Quality Improvement Effect Using Watershed-Reservoir Integrated Prediction (유역-호소 통합수질예측 기법을 이용한 물왕저수지 수질개선효과 분석)

  • Oh, Heesang;Rhee, Han-Pil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.3
    • /
    • pp.51-62
    • /
    • 2017
  • Since living environment has improved, waterfront space using and clear water demand have increased. Ministry of Environment (ME) designated polluted reservoir (worse than 4th grade) as a priority management reservoir to improve water quality (better than 3rd grade) accordingly. Minstry of Agriculture, Food and Rural Affairs (MAFRA) aims reservoir water quality 4th not 3rd grade. And water quality of agricultural reservoirs was not a great interest. For this reason, there are very few water quality monitoring data. However after designating as a priority management reservoir, reservoir manager should start water quality and flow monitoring of reservoirs and inflow streams. This process makes it possible setting complex model to accurate prediction of reservoir water quality and volume. Mulwang reservoir designated as a priority management reservoir in September 2014. In this study, BASINS/WinHSPF and EFDC-WASP were used to predict effect of water quality improvement countermeasures in Mulwang reservoir. To improve water quality of Mulwang reservoir, Siheung-si and Korea Rural Community Corporation (KRCC) established water quality improvement countermeasures. However result of simulation adapting these countermeasures cannot achieve 3rd grade. So 4 additional scenarios were adapted and the result satisfied 3rd grade. This study could help to establish water quality improvement countermeasure by using complex modeling.

Assessing the Action Plans in the Control Area(Soyang Reservoir) of Non-point Source Pollution (비점오염원 관리지역(소양호) 목표수질 달성도 평가)

  • Choi, Jaewan;Kang, Min-Ji;Ryu, Jichul;Kim, Dong-Il;Lim, Kyung-Jae;Shin, Dong-Seok
    • Journal of Environmental Science International
    • /
    • v.23 no.5
    • /
    • pp.839-852
    • /
    • 2014
  • The Ministry of Environment (MOE) has made more effort in managing point source pollution rather than in nonpoint source pollution in order to improve water quality of the four major rivers. However, it would be difficult to meet water quality targets solely by managing the point source pollution. As a result of the comprehensive measures established in 2004 under the leadership of the Prime Minister's Office, a variety of policies such as the designation of control areas to manage nonpoint source pollution are now in place. Various action plans to manage nonpoint source pollution have been implemented in the Soyang-dam watershed as one of the control areas designed in 2007. However, there are no tools to comprehensively assess the effectiveness of the action plans. Therefore, this study would assess the action plans (especially, BMPs) designed to manage Soyang-dam watershed with the WinHSPF and the CE-QUAL-W2. To this end, we simulated the rainfall-runoff and the water quality (SS) of the watershed and the reservoir after conducting model calibration and the model validation. As the results of the calibration for the WinHSPF, the determination coefficient ($R^2$) for the flow (Q, $m^3/s$) was 0.87 and the $R^2$ for the SS was 0.78. As the results of the validation, the former was 0.78 and the latter was 0.67. The results seem to be acceptable. Similarly, the calibration results of the CE-QUAL-W2 showed that the RMSE for the water level was 1.08 and the RMSE for the SS was 1.11. The validation results(RMSE) of the water level was 1.86 and the SS was 1.86. Based on the daily simulation results, the water quality target (turbidity 50 NTU) was not exceeded for 2009~2011, as results of maximum turbidity in '09, '10, and '11 were 3.1, 2.5, 5.6 NTU, respectively. The maximum turbidity in the years with the maximum, the minimum, and the average of yearly precipitation (1982~2011) were 15.5, 7.8, and 9.0, respectively, and therefore the water quality target was satisfied. It was discharged high turbidity at Inbuk, Gaa, Naerin, Gwidun, Woogak, Jeongja watershed resulting of the maximum turbidity by sub-basins in 3years(2009~2011). The results indicated that the water quality target for the nonpoint source pollution management should be changed and management area should be adjusted and reduced.

Analysis of Efficient Pollution Reduction Facility using Pollutant Distribution Analysis (오염원 분포를 고려한 효율적 오염저감시설 적지분석)

  • Lee, Ji-Heon;Bae, Myung-Soon;Lee, Sang-Gil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.465-469
    • /
    • 2008
  • 수도권의 중요한 상수원인 팔당호 수질에 큰 영향을 주고 있는 경안천 유역의 오염배출량을 저감하기 위하여 많은 인공습지조성이 계획되었으나 이들의 위치선정의 적합성에 대한 분석이 부족한 실정이다. 또한 경안천은 상류에서 중류까지는 주변 농경지의 용수공급을 위해 많은 수중보가 설치되어 물의 흐름이 단절되어있어 수리적 요소에 인공요인으로 작용하고 있으며, 하류로 갈수록 하천이 곡선형태로 흐르고 하폭 또한 넓어져 자체적으로 유기물이 증가하기 좋은 환경을 가지고 있다. 본 연구에서는 유역의 자연적, 인공적 요소를 고려한 물리적 모델을 구축하고 각 오염원특성별 부하량 분석을 통한 속성정보를 반영하였으며 오염저감시설설치 시나리오의 타당성분석을 분석을 수행하였다. 연구과정을 좀더 상세히 살펴보면 첫째, 비점오염원의 주된 경로중 하나인 축산계부하량 저감을 위하여 지형적 인자를 고려한 인공습지조성 적지분석 결과를 HSPF모델에 반영하였다. 둘째, 기존 오염 총량제에서 수행해오던 오염부하량 산정방식을 통해 산정된 양을 유역단위로 재분배 하여 오염원 분포를 반영하였다. 주요 오염부하량인 축산계와 토지계의 오염부하량만을 적용하였으며 일부 오염원 항목들은 생략하거나 하수처리시설을 통해 처리되고 있는 것으로 모의하였다. 셋째, 각 시나리오별 시뮬레이션을 수행하여 경안천 인공습지조성가능성 및 수질개선 효과를 예측하였다. 기존의 점오염원 처리시설만으로는 하천에서의 목표수질을 만족시키는데 한계가 있기 때문에 점오염원 저감시설뿐 아니라 비점오염원 저감시설인 인공습지를 기존의 처리시설에 연계하여 시나리오를 구성하였다. 기존습지시설의 오염저감율은 각 시설들의 평균값을 적용하였으며 처리효율은 BOD, TN, TP 각각 40%, 25%, 12%로 적용하였다. 오염원분포를 고려한 모의결과 현재 인공습지 입지대상지역들 중 좀 더 효율적인 오염저감 효과를 보이는 지역이 분석되었다.

  • PDF