Power System Enhanced Monitoring through Strategic PMU Placement Considering Degree of Criticality of Buses

  • Singh, Ajeet Kumar;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권5호
    • /
    • pp.1769-1777
    • /
    • 2018
  • This paper proposes a method for optimal placement of Phasor Measurement Units (PMUs) considering system configuration and its attributes during the planning phase of PMU deployment. Each bus of the system is assessed on four diverse attributes; namely, redundancy of measurements, rotor angle and frequency monitoring of generator buses, reactive power deficiency, and maximum loading limit under transmission line outage contingency, and a consolidated 'degree of criticality' is determined using Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). The major contribution of the proposed work is the development of modified objective function which incorporates values of the degree of criticality of buses. The problem is formulated as maximization of the aggregate degree of criticality of the system. The resultant PMU configuration extends complete observability of the system and majority of the PMUs are located on critical buses. As budgetary restrictions on utilities may not allow installation PMUs even at optimal locations in a single phase, multi-horizon deployment of PMUs is also addressed. The proposed approach is tested on IEEE 14-bus, IEEE 30-bus, New England (NE) 39-bus, IEEE 57-bus and IEEE 118-bus systems and compared with some existing methods.