• Title/Summary/Keyword: Watershed management evaluation

Search Result 193, Processing Time 0.021 seconds

A Water Environment Management and Evaluation Systems for a Small Watershed (I) - System formulation and Development - (소유역에서의 수계환경관리 및 평가시스템의 개발(I) - 시스템의 개발 및 구성 -)

  • Kang, Moon-Seong;Park, Seung-Woo;Im, Sang-Jun
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.3-13
    • /
    • 2001
  • In an effort to effectively manage and evaluate a water environment at a small watershed, a decision support system for a water environment management and evaluation has been developed. This paper described the overall features and functions of the water environment management and evaluation systems (WEMES) for environmental management, conservation, and evaluation at a small watershed. WEMES consisted of fore subsystems: data, simulation model, evaluation model, and user interface. Each of the systems were briefly described. And special features like simulation and evaluation models were also introduced.

  • PDF

Evaluation and improvement of forest watershed management projects in Korea

  • Rhee, Hakjun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.885-901
    • /
    • 2020
  • A forest watershed management project was introduced in 2004 to develop ecologically sound forest watersheds. It includes landslide prevention and erosion control, water resource management, landscape development, and forest resource management. However, it has been managed fragmentarily and inefficiently, far from the original intents. This study investigated current status, problems, and improvement measures of the project. Literature reviews were conducted on forest watershed management in Korea and other countries, and surveys were conducted on 201 erosion control experts. When introduced, the forest watershed management project was well planned and implemented as intended. It later turned to focus only on disaster prevention such as erosion control dams and stream conservation measures. The survey results showed that a majority (89% and 86%) of surveyees wanted increases in the project period and budget. They also responded that conflicts with local residents (51%) and determining project locations (32%) were the most difficult tasks when implementing the projects, and only 36% kept project records. To plan and implement the projects as intended, the following suggestions should be considered: (1) establishment of a solid legal foundation and improvement of the erosion control practices law; (2) increase in the project period (from 1 to 2 - 3 years) and budget; (3) development of a manual for project site selection and guidelines; (4) monitoring and systematic information management; and (5) development of spatial analysis tools for watershed analysis and management.

A Study on the Final Evaluation Criteria of Allocation Exceedance Regional in Total Maximum Daily Load (오염총량관리 할당부하량 초과지역의 최종 평가기준에 관한 연구)

  • Oh, Seung Young;Han, Mideok;Kim, Seok Gyu;Ahn, Ki Hong;Kim, Oksun;Kim, Yong Seok;Park, Ji Hyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.5
    • /
    • pp.450-457
    • /
    • 2016
  • The Total Maximum Daily Load (TMDL) is a watershed management system that involves the establishment of the target water quality, the calculation of permission loading (allocation loading), and the control of total pollutants for each unit watershed. Allocation loading is assessed through the comprehensive implementation assessment of the previous year's plan. Assessment results are used for follow-up management measures such as the limit of development and updating of TMDL Management Implementation Plans for the next planning period. Although detailed assessment criteria are important, they are not currently available. Therefore, we suggested assessment criteria by comparing two methods('integration method' and 'separation method') using combination point and non-point discharge loading. We also examined the penalty criteria considering controllable load local government and updating methods of the TMDL Management Implementation Plan for the next planning period.

A Water Environment Management and Evaluation Systems for a Small Watershed (II) - Operation and Applications - (소유역에서의 수계환경관리 및 평가시스템의 개발(II) - 시스템의 운용과 적용 -)

  • Kang, Moon-Seong;Park, Seung-Woo;Her, Young-Gu
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.15-25
    • /
    • 2001
  • This paper described the overall operations and applications of the water environment management and evaluation systems (WEMES) for environmental management, conservation, and evaluation for a small watershed. WEMES was to be applied with field data from small watersheds ranging from 0.4 to 29.79km2 in size which have steep topography and complex landuses. WEMES was a computer aided decision support system, that was comprised of the database subsystem, the simulation model subsystem, the environmental evaluation model subsystem, and the graphic user interface subsystem that visualizes the simulated results. The water environment management and evaluation with WEMES was successfully performed.

  • PDF

Watershed Modeling Research for Receiving Water Quality Management in Hwaseong Reservoir Watershed (화성호 유역의 수질관리를 위한 유역모델링 연구)

  • Jang, Jae-Ho;Kang, Hyeong-Sik;Jung, Kwang-Wook
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.819-832
    • /
    • 2012
  • HSPF model based on BASINS was applied for the Hwaseong Reservoir watershed (HRW) to evaluate the feasibility of water quality management. The watershed was divided into 45 sub-basins considering various watershed environment. Streamflow was calibrated based on the measured meteorological data, discharge data of treatment plants and observed streamflow data for 2010 year. Then the model was calibrated against the field measurements of water qualities, including BOD, T-N and T-P. In most cases, there were reasonable agreements between observed and predicted data. The validated model was used to analyze the characterization of pollutant load from study area. As a result, Non-point source pollutant loads during the rainy season was about 66~78% of total loads. In rainy-season, water quality parameters depended on precipitation and pollutant loads patterns, but their concentration were not necessarily high during the rainy season, and showed a decreasing trend with increasing water flow. As another result of evaluation for load duration curves, in order to improve water qualities to the satisfactory level, the watershed managements considering both time-variant and pollution sources must be required in the HRW. Overall, it was found that the model could be used conveniently to assess watershed characteristics and pollutant loads in watershed scale.

Application of the Load Duration Curve (LDC) to Evaluate the Rate of Achievement of Target Water Quality in the Youngsan · Tamjin River Watersheds (부하지속곡선(LDC)을 이용한 영산강 · 탐진강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Cheong, Eunjeong;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.349-356
    • /
    • 2016
  • Total Maximum Daily Loads (TMDLs) System has been used to improve water quality in the Youngsan·Tamjin river basin since 2004. The Basic Policy of TMDLs sets up the standard flow based on the average dry condition or mid-range flow during the last 10 years. However, Target Water Quality (TWQ) assessment on TMDLs has been used to evaluate water quality through eight-day intervals over 36 times a year. The results for allocation evaluation and target water quality evaluation were different from each other in the same unit watershed during the first period. In order to improve the evaluation method, researchers applied Load Duration Curve (LDC) to evaluate water quality in nine unit watersheds of the Youngsan·Tamjin river basin. The results showed that achievement rates of TWQ assessment with the current method and LDC were 67~100% and 78~100%, respectively. Approximately 11% of the achievement rates with use of LDC were higher than those with use of the current method. In conclusion, it is necessary to review the application of the LDC method in all Four Major River Watersheds.

Integrated Approach for Watershed Management in an Urban Area (도시 유역 관리를 위한 통합적인 접근방법)

  • Lee, Kil-Seong;Chung, Eun-Sung;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.2 s.163
    • /
    • pp.161-178
    • /
    • 2006
  • Heathcote (1998) identified a systematic, seven-step approach to general watershed planning and management. It consists of 1) understanding watershed components and processes, 2) identifying and ranking problems to be solved, 3) setting clear and specific goals, 4) developing a list of management options, 5) eliminating infeasible options 6) testing the effectiveness of remaining feasible options, and 7) developing the final options. In this study the first five steps of that process were applied to the Anyangcheon watershed in Korea, which experiences streamflow depletion, frequent flood damages, and poor water quality typical of highly urbanized watersheds. This study employed four indices: Potential Flood Damage(PFD), Potential Streamflow Depletion(PSD), Potential Water Quality Deterioration(PWQD) and Watershed Evaluation Index(WEI) to identify and quantify problems within the watershed. WEI is the integration index of the others. Composite programming which is a method of multi-criteria decision making is applied for the calculation of PSD, PWQD and WEI (Step 2). The primary goal of the study is to secure instreamflow in the Anyangcheon during dry seasons. The second management goals of flood damage mitigation and water quality enhancement are also set (Step 3). Management options include not only structural measures that can alter the existing conditions, but also nonstructural measures that rely on changes in human behavior or management practices (Step 4). Certain management options which are not technically, economically, and environmentally feasible, are eliminated (Step S). Therefore, this study addresses a Pre-feasibility study, which established a master plan using Steps 1 through 5.

Evaluation of the future monthly groundwater level vulnerable period using LSTM model based observation data in Mihostream watershed (LSTM을 활용한 관측자료 기반 미호천 유역 미래 월 단위 지하수위 관리 취약 시기 평가)

  • Lee, Jae-Beom;Agossou, Amos;Yang, Jeong-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.481-494
    • /
    • 2022
  • This study proposed a evaluation of the monthly vulnerable period for groundwater level management in the Miho stream watershed and a technique for evaluating the vulnerable period for future groundwater level management using LSTM. Observation data from groundwater level and precipitation observation stations in the Miho stream watershed were collected, LSTM was constructed, predicted values for precipitation and groundwater levels from 2020 to 2022 were calculated, and future groundwater management was evaluated when vulnerable. In order to evaluate the vulnerable period of groundwater level management, the correlation between groundwater level and precipitation was considered, and weights were calculated to consider changes caused by climate change. As a result of the evaluation, the Miho stream watershed showed high vulnerability to underground water management in February, March, and June, and especially near the Cheonan Susin observation well, the vulnerability index for groundwater level management is expected to deteriorate in the future. The results of this study are expected to contribute to the evaluation of the vulnerable period of groundwater level management and the derivation of preemptive countermeasures to the problem of groundwater resources in the basin by presenting future prediction techniques using LSTM.

Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea (수질오염총량 단위유역의 유량조건별 수체 손상 평가를 위한 부하지속곡선 적용성 연구)

  • Hwang, Ha-Sun;Yoon, Chun-Gyeong;Kim, Ji-Tae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.903-909
    • /
    • 2010
  • The purpose of this study was evaluated on the applicability of Load Duration Curve Method (LDC Method) using HSPF watershed model and sampling data for efficient TMDLs in Korea. The LDC Method was used for assessment pollutant characteristics in watershed and water quality variation in each water flow level. Load Duration Curve is applied for judge the level of impaired water-body and can be estimated the impaired level by pollutant, such as BOD, T-N, and T-P in this study depending on variation of stream flow. As a result, BOD, T-P was usually exceed the standard value at low flow and dry hydrologic period. Improvement of effluent concentration from WWTP and riparian buffer protection zone are effective to improve the water quality. T-N showed the worst condition at mid-range hydrologic period and moist hydrologic period. Therefore, soil erosion control program and BMPs for non-point source pollution control is effective for recovery the water quality, which can be useful method for management of water quality in the plan of recovery water quality spontaneously. Applicability of LDC Method was evaluated in the Nakbon A watershed. However, we need to consider more detailed and accumulated data set such as accurate GIS data and detail pollution data, and WWTP discharge water quality data for accurate evaluation of watershed. Overall, The LDC Method is adequate for evaluation of watersheds characteristics, and its application is recommended for watershed management and TMDL Implementation.

Comparing Water Management Categories of Green Building Rating Systems for Development of Evaluation Criteria of Watersheds (유역 평가 기준 개발을 위한 그린빌딩 평가 시스템의 물관리 관련 항목 비교 연구)

  • Idrees, Muhammad Bilal;Lee, Jin-Young;Ahn, Jae-Hyun;Kim, Tae-Woong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.1013-1020
    • /
    • 2018
  • With the rapid industrialization and increase in population, more and more people are moving to live in cities. This urbanization trend is resulting in increased construction and development activities which associates with escalation of impervious surface. This in turn causes problems like groundwater depletion, higher flood peaks, and increased rate of soil loss from the watershed. Watershed management projects are being implemented around the globe concerning with the application of soil and water resources conservation practices. It is desirable that an entire watershed be evaluated based on soil and water conservation practices applied. In this study, water management categories of green building rating systems (GBRS) of South Korea, Taiwan, and the Philippines were discussed. The water management practices rating criteria of G-SEED (South Korea), BERDE (Philippines), and EEWH (Taiwan) were explored and compared. The insights of this study are expected to be projected to establish a comprehensive rating system for the evaluation of watersheds. The quantification of watershed management practices will help future planners to identify areas of potential water-related risks and counter the hazards more effectively.