• Title/Summary/Keyword: Waterproofing Method

Search Result 205, Processing Time 0.019 seconds

Material Properties Evaluation of Cement Mortar Mixed with Organic/Inorganic Combined Water-repellent (유/무기 복합 발수제를 혼입한 모르타르의 재료특성 평가)

  • Kim, Wan-Su;Yoon, Chang-Bok;Cho, In-Sung;Lee, Han-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.6
    • /
    • pp.50-58
    • /
    • 2020
  • When the concrete surface layer is damaged, The method of impregnating the concrete surface with a water repellent cannot secure the expected durability. Recently, various waterproofing and water-repellent materials were mixed into concrete or mortar to secure water repellency even inside cracks, but compressive strength was greatly reduced. In order to overcome the decrease in compressive strength, there has not yet been a study using the merits of organic and inorganic materials at the same time, so in this study, the physical properties and water repellency performance were evaluated by mixing an organic/inorganic composite water repellent appropriately mixed with an organic and inorganic material into the mortar. When mixed with organic/inorganic water repellent, the flow and air content were reduced by about 10% and 50% compared to the Liquid specimen. In the case of the P6L1 specimen, it was confirmed that the compressive strength decreased by about 3.5% compared to the non-mixed mortar at 39.5 MPa, the same as the existing water repellent, Powder. Water-repellent performance The organic-inorganic composite water repellent mixture specimen confirmed higher water repellency than the existing water repellent mixture powder, and the chloride penetration resistance evaluation result showed that the organic-inorganic composite water repellent mixture specimen reduced the passing charge by about 45% compared to the non-mixed mortar. In summary, it is judged that the P5L1 organic/inorganic composite water repellent mixed with a powder water repellent and a liquid water repellent in a ratio of 5:1 is the most reasonable to prevent the decrease in compressive strength and secure water repellency.

Correction of the Ground Subsidence Risk Ratings during Open Cut Excavation (개착식 굴착공사 중 지반함몰 위험등급 분류시트의 등급 보정에 관한 연구)

  • Shin, Sang-Sik;Kim, Hak Joon
    • The Journal of Engineering Geology
    • /
    • v.31 no.2
    • /
    • pp.135-148
    • /
    • 2021
  • Ground subsidence risk ratings obtained from the site investigation during pre-excavation stages could be changed depending on the parameters revealed during construction activities. A method of correcting the pre-excavation ground subsidence risk ratings based on the site conditions observed in the field is suggested in this study. The elevation of groundwater table during the excavation may be different from the predicted value depending on the application of waterproofing methods and construction conditions. The drastic drawdown of groundwater table during the excavation could cause ground subsidence due to soil volume decrease related to consolidation or compression of the ground, whereas the rising of groundwater table caused by the intense rainfall may result in a high potential for ground subsidence due to heaving or boiling of the excavation bottom. Excessive displacements of retaining walls or ground settlements may cause ground subsidence, which also results in a high risk of ground subsidence caused by the destruction of buried pipelines. Reevaluation of ground subsidence risk ratings is suggested considering the fluctuation of groundwater table, condition of groundwater leakage, measured ground displacements, and soil types. Finally, the ground subsidence risk rating system is improved for better evaluation by using 12 factors in 5 categories.

Application and conservation of 3D technology for the restoration of the original shape of military boots excavated in the DMZ (비무장지대 출토 군화의 형태 복원을 위한 3차원 디지털 기술의 적용 및 보존처리)

  • OH Seungjun;WI Koangchul
    • Korean Journal of Heritage: History & Science
    • /
    • v.56 no.2
    • /
    • pp.124-133
    • /
    • 2023
  • Preservation processing for two combat boots was executed through application of 3-dimensional digital technology and with use of preservation materials providing outstanding reversibility and stability. The aim of this was to establish a method to preserve the relics of fallen Korean War soldiers that had been excavated by the soldiers remains excavation corps of the Ministry of National Defense. It was possible to estimate the foot size of the soldiers who would have worn the combat boots via 3-dimensional digital scanning and modeling of the boots. In this process, the original form of the combat boots was restored through the use of 3D-printed structures. The original form was restored through a process of removing contaminants from the excavated relics and performing a conditioning treatment, and through use of an antique-color treatment after bonding and filling in the sections that had been ripped or deteriorated. Following the aforementioned preservation processes, it was possible to confirm that both of the combat boots had soles and top sections made of rubber, and portions of the top section and ankle section of the boots were made of synthetic rubber. As such, it was confirmed that these were similar to the Shoe Pac(M-1944, 12-inch) winter boots that had been manufactured for the purposes of waterproofing and/or protection against cold, and introduced in 1944. Such results confirmed that it is possible to discover the manufacturing techniques, materials, and uses of relics excavated through application of preservation processing, thereby illustrating the importance of the convergent research of scientific preservation processing and 3-dimensional digital technology.

A Study on the Effect of Applying Water Seepage Lowering Method Using Swelling Waterstop for Expansion Joint in the Concrete Dam (콘크리트 댐에서 수축이음부의 수팽창성 차수재를 이용한 침투저감 공법 적용효과 연구)

  • Han, Kiseung;Lee, Seungho;Kim, Sanghoon;Kim, Sejin;Pai, Sungjin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.10
    • /
    • pp.21-29
    • /
    • 2021
  • Most concrete gravity-type dams in and out of the country were constructed by column method to control cracks caused by concrete hydration heat generated during construction, resulting in a certain level of leakage after impoundment through various causes, such as contraction joints and construction joints. However, due to the characteristics of concrete structures that shrink and expand according to temperature, concrete dams have vertical joints and drains to allow penetration. PVC waterproof shows excellent effects in completion of the dam, which however increases the possibility of interfacial failure due to different thermal expansion. Other causes of penetration may include problems with quality control during installation, generation of cracks due to heat of hydration of concrete, waterproofing methods, etc. In the case of Bohyunsan Dam in Yeongcheon, North Gyeongsang Province, the amount of drainage in the gallery was checked and underwater, and it was confirmed that there are many penetrations from drainage holes connected to vertical joints, and that some of the PVC waterproofs are not fully operated. As a new method to prevent penetration through vertical joints, D.S.I.M. (Dam Sealing Innovation Method) developed by World E&C was applied to Bohyunsan Dam and checked the amount of drainage in the gallery. As a result of first testing three most leaking vertical joints, the drain in the gallery was reduced by 87% on the average and then applied to the remaining 13 locations, which showed a 83% reduction effect based on the total drain in the gallery. Summing up these results, it was found that D.S.I.M. preventing water leakage from the upstream face is a valid construction method to reduce the water see-through and penetration quantity seen in downstream faces of concrete dams. If D.S.I.M. is applied to other concrete dams at domestic and abroad, it is expected that it will be very effective to prevent water leakage through vertical joints that are visible from downstream faces.

무령왕릉보존에 있어서의 지질공학적 고찰

  • 서만철;최석원;구민호
    • Proceedings of the KSEEG Conference
    • /
    • 2001.05b
    • /
    • pp.42-63
    • /
    • 2001
  • The detail survey on the Songsanri tomb site including the Muryong royal tomb was carried out during the period from May 1 , 1996 to April 30, 1997. A quantitative analysis was tried to find changes of tomb itself since the excavation. Main subjects of the survey are to find out the cause of infiltration of rain water and groundwater into the tomb and the tomb site, monitoring of the movement of tomb structure and safety, removal method of the algae inside the tomb, and air controlling system to solve high humidity condition and dew inside the tomb. For these purposes, detail survery inside and outside the tombs using a electronic distance meter and small airplane, monitoring of temperature and humidity, geophysical exploration including electrical resistivity, geomagnetic, gravity and georadar methods, drilling, measurement of physical and chemical properties of drill core and measurement of groundwater permeability were conducted. We found that the center of the subsurface tomb and the center of soil mound on ground are different 4.5 meter and 5 meter for the 5th tomb and 7th tomb, respectively. The fact has caused unequal stress on the tomb structure. In the 7th tomb (the Muryong royal tomb), 435 bricks were broken out of 6025 bricks in 1972, but 1072 bricks are broken in 1996. The break rate has been increased about 250% for just 24 years. The break rate increased about 290% in the 6th tomb. The situation in 1996 is the result for just 24 years while the situation in 1972 was the result for about 1450 years. Status of breaking of bircks represents that a severe problem is undergoing. The eastern wall of the Muryong royal tomb is moving toward inside the tomb with the rate of 2.95 mm/myr in rainy season and 1.52 mm/myr in dry season. The frontal wall shows biggest movement in the 7th tomb having a rate of 2.05 mm/myr toward the passage way. The 6th tomb shows biggest movement among the three tombs having the rate of 7.44mm/myr and 3.61mm/myr toward east for the high break rate of bricks in the 6th tomb. Georadar section of the shallow soil layer represents several faults in the top soil layer of the 5th tomb and 7th tomb. Raninwater flew through faults tnto the tomb and nearby ground and high water content in nearby ground resulted in low resistance and high humidity inside tombs. High humidity inside tomb made a good condition for algae living with high temperature and moderate light source. The 6th tomb is most severe situation and the 7th tomb is the second in terms of algae living. Artificial change of the tomb environment since the excavation, infiltration of rain water and groundwater into the tombsite and bad drainage system had resulted in dangerous status for the tomb structure. Main cause for many problems including breaking of bricks, movement of tomb walls and algae living is infiltration of rainwater and groundwater into the tomb site. Therefore, protection of the tomb site from high water content should be carried out at first. Waterproofing method includes a cover system over the tomvsith using geotextile, clay layer and geomembrane and a deep trench which is 2 meter down to the base of the 5th tomb at the north of the tomv site. Decrease and balancing of soil weight above the tomb are also needed for the sfety of tomb structures. For the algae living inside tombs, we recommend to spray K101 which developed in this study on the surface of wall and then, exposure to ultraviolet light sources for 24 hours. Air controlling system should be changed to a constant temperature and humidity system for the 6th tomb and the 7th tomb. It seems to much better to place the system at frontal room and to ciculate cold air inside tombs to solve dew problem. Above mentioned preservation methods are suggested to give least changes to tomb site and to solve the most fundmental problems. Repairing should be planned in order and some special cares are needed for the safety of tombs in reparing work. Finally, a monitoring system measuring tilting of tomb walls, water content, groundwater level, temperature and humidity is required to monitor and to evaluate the repairing work.

  • PDF