• Title/Summary/Keyword: Water-leakage cracks

Search Result 57, Processing Time 0.031 seconds

Tunnel Mosaic Images Using Fisheye Lens Camera (어안렌즈 카메라를 이용한 터널 모자이크 영상 제작)

  • Kim, Gi-Hong;Song, Yeong-Sun;Kim, Baek-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.17 no.1
    • /
    • pp.105-111
    • /
    • 2009
  • A construction can be more convenient and safer with adequate informations. Consequently, studies on collecting various informations using newest surveying technology and applying these informations to a construction have been making progress recently. Digital images are easy to obtain and contain various informations. Therefore, with the recent development of image processing technology, the application field of digital images is getting wider. In this study, we proposed to use a fisheye lens camera in underground construction sites, especially tunnels, to overcome inconvenience in photographing with general lens cameras. A program for mapping the surface of a tunnel and making a mosaic image is also developed. This mosaic image can be applied to observe and analyze abnormal phenomenons on tunnel surface like cracks, water leakage, exfoliates, and so on.

  • PDF

Stress-strain Analysis of Waterproof Layer through Behavioral Response Performance Test (거동대응성능 시험을 통한 방수층의 응력-변형률 분석 연구)

  • Song, Je-Young;Jung, Suk-Joo;Seo, Hyun-Jae;Lee, Jung-Hun;Kim, Byoungil;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.92-93
    • /
    • 2020
  • The test method to be developed is to determine whether the waterproof layer applied to the leak-prone part such as cracks and joints has defects such as tearing or lifting of the waterproof layer due to the influence generated from the behavior of the structure under complex deterioration conditions. This is to evaluate the performance of the waterproofing method afterwards. Therefore, by notifying only the pass or fail, the unique mechanical properties of the material or method used are notified to the test client to limit the physical properties of the test body, thereby determining and supplementing the weaknesses of the user material in advance to improve the high quality. We want to prevent damage from water leakage through production and distribution of materials.

  • PDF

Analysis of surface design and panel optionsfor freeform building

  • Min Gyu Park;Han Guk Ryu
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.553-557
    • /
    • 2013
  • Roof and exterior wall are designed and constructed in a manner that prevents the accumulation of water within the wall and roof assembly in the formal building. However, in a freeform building there is no clear distinction between exterior wall and roof. In other words, the exterior walls and roof systems of the freeform building are integrated as a surface, unlike the formal building envelope. Therefore, freeform architecture needs a systemized envelope design method to perform functions of exterior wall and roof. However, in many cases, construction methods for roof and exterior wall are applied to freeform buildings without necessary alterations, which lead to incomplete design, leakage, cracks and other problems. Freeform architecture is thus designed and constructed differently from formal buildings. In order to more easily and inexpensively actualize freeform architecture, Building Information Modeling (hereinafter referred to as BIM) has recently been applied in the construction industry. The studies and case analysis are not sufficient to identify the implications and contributions of freeform buildings in future similar projects. Therefore, this research will study design and construction methods for freeform surfaces. This study attempts to analyze the pros and cons of each method for the concrete surface frame, and then presents the panel options for envelope system of the freeform architecture.

  • PDF

Geological Environments and Deterioration Causes of the Buddhist Triad Cave in Gunwi, Korea (군위 삼존석굴의 지질환경과 훼손원인)

  • 황상구;김수정;이현우
    • Economic and Environmental Geology
    • /
    • v.35 no.5
    • /
    • pp.407-420
    • /
    • 2002
  • The Buddhist Triad Cave in Gunwi (National treasure No. 109) consists of porphyritic biotite granite, and it has been deteriorated into microorganic smears, white films, brown rusts, granular decay, color changes, and joints by the same weathering factors as rain, moisture, temperature variation and microorganic living. Main origin is probably the rain that leaks into the cave along joints in Palgongsan granite, and then its moisture grows many microorganism and is frozen over during winter. The granites around the cave regularly develop two NEE and NWW joint sets that are conjugate to be a joint system. The NEE set extends far away with narrow joint spacings and affects the leakage of the rains, and is divided into 4 joint zones, among which J$_{m}$ and J$_{3}$ immediately affect the leaking water into the cave. An extensional Joint, in northern wall of the cave, was formed by toppling of the block between J$_{m}$and J$_{3}$joint zones from widening the Jm aperture by roots of a big pine tree, and passes through the J$_{m}$joint zone. This bypass allows no circulation of small rain, but a good circulation of heavy rain from influx to the cave for a long pathway. Many Joints and cracks, in the ceiling near the cave entrance, immediately get through the J$_3$ joint zone, and have a good circulation of small rain 10 mm. Both J$_{m}$and J$_{3}$ joint zones are, therefore, chief influxes that cause leakage of the rains.

A study on monitoring the inner structure of dam body using high resolution seismic reflection method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim Jungyul;Kim Hyoungsoo;Oh Seokhoon;Kim Yoosung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.15-20
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes, After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture, Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

A study on Monitoring the Inner Structure of Dam Body Using High Resolution Seismic Reflection Method (고분해능 탄성파 반사법을 이용한 댐체 내부구조 모니터링 연구)

  • Kim, Jung-Yul;Kim, Hyoung-Soo;Oh, Seok-Hoon;Kim, Yoo-Sung
    • Journal of the Korean Geophysical Society
    • /
    • v.8 no.1
    • /
    • pp.1-6
    • /
    • 2005
  • Defects of dam body which can be induced in seepage or leakage procedure can directly affect dam safety. Therefore, a proper inspection method should be carried out in the first place to find out their positions and sizes. After that, some reinforcement works such as grouting and the corresponding assessment could be taken in a proper way. The dam(center core type earth dam) issued in this study has been in need for intensive diagnosis and reinforcement work, because a lot of slumps similar to cracks, seepage and some boggy area have been observed on the downstream slope. High resolution seismic reflection method was performed on the crest profile twice before and after grouting work(Aug. 2001 and Nov. 2004) aimed at the dam inspection and the assessment of grouting efficiency as well. To enhance the data resolution, P-beam energy radiation technique which can reduce the surface waves and hence to reinforce the reflection events was used. Strong reflection events were recognized in the stack section before grouting work, It seems that the events would be caused by e.g. horizontal cracks with a considerable aperture. Meanwhile such strong reflection events were not observed in the section after grouting. That is, the grouting work was dear able to reinforce the defects of dam body. Hence, the section showed an well arranged picture of dam inner structure. In this sense, seismic reflection method will be a desirable technique for dam inspection and for monitoring dam inner structure as well.

  • PDF

Evaluation of the Pull-out Resistance of the SMA Wire Connector (SMA 와이어를 이용한 연결재의 인발저항성능 평가)

  • Jung, Chi-Young;Woo, Tae-Ryeon;Lee, Jong-Han;Cheung, Jin-Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.1
    • /
    • pp.130-137
    • /
    • 2019
  • Precast concrete (PC) structure is one of the type of the structures which is made in a facility prior to installing it to a construction field. The contact surfaces between two PC structures should be treated for obtaining enough binding force by inducing prestressing force. However, in the many cases, the contact surface causes the crack and leakage of water. These cracks and water leakage can cause the corrosion of the rebar, and the corrosion of the rebar can severely reduce the long-term durability. In this study, the SMA wire connector is suggested to solve the problem with the contact surfaces between two PC structures. The pull-out resistance of the suggested SMA wire connector is evaluated by conducting the tests to find the effect of the number of wires, shape of connector part, and shape memory effect. As a result of this study, the empirical formula is suggested to estimate the pull-out resistance related with the effects of the shape of the connector, shape memory effect, and the adhesive force. The validity between the estimated pull-out resistance and the measured value is confirmed.

Analysis of the Cause of Waterleakage in Residential Apartment Underground Parking Ground and the Review of the Repare Methods (공동주택 지하주차장의 누수원인 분석 및 보수방안 검토)

  • Oh, Sang-Keun;Choi, Sung-Min;Song, Je-Young
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.3
    • /
    • pp.255-264
    • /
    • 2014
  • This study analyzes the cause and the repairing method of water leak by parts of basement parking lot which is recorded to have a high defect frequency in apartment buildings. It has been assessed that the cause of water leakage on the first floor upper substrate is due to such factors as landscaping and weights. During construction or through other cases, it has been determined that cracks were produced in the apartment structure because the structure was weak and exposed to the effects of the substrate movement. The base floor and underground external walls are areas that are exposed to water pressure (uplife pressure), thus in normal cases the rear surface repair of the structure using sythetic rubberized polymer gel should be considered as an effective method. However, in cases where application of waterproofing layer is required in the structure due to high water pressure, using asystolic cement milk grout to form the waterproofing layer and applying water-swelling acrylic material into the cracked areas is considered to be highly effective.

A study on efficient management of the drainages of underground tunnels for environmentally friendly urban railway systems (도시철도 친환경 지하터널 배수형식의 효율적인 유지관리 방안 검토)

  • Baek, Jong-Myeong;Hong, Jong-Hun;Kim, Han-Bae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1982-1990
    • /
    • 2010
  • Excepting tunnel of dorimstream - ccachimountain station section, the subway line No.2th section was build using ASSM and NATM methods because of soil pressure and land condition. The way of dealing underground water was selected without sufficient preconsideration of geographical features, ground condition, influence of lowing underground water, and long-term cost of running maintenance so that the form of undrained tunnel was build having decreased construction characteristics and technically improper elements. The form of partial drainage is very difficult to manage structures of tunnel, because water leakage, water pressure causing cracks of lining concretes and scaling are constantly happened. so partial drainage suggest that setting reinforced Anchor Bolt to prevent buoyancy and should increase center drainage way up to height of railroad. Partial drainage suggest that holey pipe(${\phi}$350mm) manhole, drainage checking pipe manhole are should be regularly dredged, when changing roadbed(gravel${\rightarrow}$concrete) drainage checking pipe manhole should be build and setting a limitation of entering underground water's quantities. Beside drainage degree in changed section of structures causing instability of structures is continuous degree. so if efficient drainage way and the patterns of flaws, problems are considered in survey, it will be expected to have a advantage condition in maintenance part.

  • PDF

Temperature Variation during Construction in the Concrete Dam Body by Artificial Cooling (강제냉각(强制冷却)에 의한 콘크리트 제체(堤體)의 시공중(施工中) 온도변동(溫度變動))

  • Lee, Bae Ho;Kim, Hong Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.3
    • /
    • pp.39-48
    • /
    • 1989
  • The concrete temperature in mass concrete rises rapidly above the placing temperature owing to the heat given off by the hydrating cement. This temperature rise produces tensile stress and cracks which later become the cause of water leakage in concrete structures. It is essential, therefore, to reduce the interior heat of concrete dam given off by hydrating cement by artificial cooling. The present study aiming to study the temperature variations in mass concrete by pipe cooling, compars the actual measurements of Chungju Dam with the temperature calculated by Finite Difference Method(FDM), and it found that the results closely agree with each other. Based on these results, the analyses are performed simulate the interior temperature history of concerte dam made of type II (moderate heat) portland cement under various coditions.

  • PDF