The water quality in the rural areas is degrading due to a variety of causes such as the increase of the urban sewage and industrial wastes, the disposal of solid wastes, the growth of livestock waste, the growth of leisure facilities, the establishment of agricultural industry estates and etc. The water pollutants are scarce while the effluent is increasing from wide scattered sources. The technology specifically designed for the rural wastes water treatment plant needs to be implemented with improvement of agricultural water quality. 1. An integrated management measures against water pollution sources. The prevention of water pollution is the best measures in the environmental pollution. Hence, the most effective measures needs to be against the sources. Small-scale water treatment plants needs to be constructed in each village in the rural areas. As for the industrial effluent, the effluent discharge needs to be strictly monitored. Government subsidy for the establishment of treatment plant for livestock wastes is necessary. 2. The establishment of national-wide network for agricultural water quality. The network for agricultural water quality have been operated to conserve the agricultural water quality, and to develop management policies by the assessment of water pollution in the rural areas. The results of agricultural water quality network indicates that the water quality is degrading not only around urban areas but also in the distant rural areas, and the water quality at the pumping stations and weirs is worse than that of reservoirs. 3. The legal, systematic, and technical approaches for the agricultural water quality management. The actions currently implemented for the improvement of agricultural water quality involve temporary measures such as the improvement of irrigation facilities. These contingency measures are not effective in the long-term, and sometimes bring secondary pollution. Therefore, integrated measures covering the whole water environment such as the flow, quality, river morphology, aquatic ecosystem, and the surrounding environment, need be invented and implemented. Besides, the legal, systematic, and technical frameworks for the management are not fully established so far. The technology for the treatment of rural water pollution should be refined afterwards, and the research for the development of rural waste water treatment plant should be carried out.
With a belief of high water quality production and less chemical usage, membrane technology including Microfiltration (MF), Ultrafiltration (UF), and Nanofiltration(NF) is being employed more and more in drinking water treatment process. However, due to higher energy consumption of UF and NF, MF is normally used for drinking water treatment especially in a plant of large scale. In this investigation, performance ofsand filtration and membrane filtration was compared regarding removal of various water quality parameters, such as TOC, DOC, KMnO4 consumption, THMFP, and HAAFP. Two lines of pilot plant have been operated, one of which line is a traditional advanced water treatment process which includes sedimentation, sand filtration, ozonation, and activated carbon, and the other line is an alternative treatment process which includes sedimentation with inclined plate, MF membrane, ozonation, and activated carbon. For the first about 4months of period, MF filtration showed similar or little bit higher performance than sand filtration. However, after about 4month later, sand filtration showed much higher performance in removing all parameters monitored in the investigation. It was found that sand filtration is a better option than MF filtration as far as microbial community is fully activated in sand filter bed.
The purpose of this study was to analyze water treatment characteristics, including the efficiency of removing algae from water purification plants, by installing a demonstration facility for decontamination of algae, including natural algae remover injection equipment, in the water purification plant. Jar-test showed that the optimum injection of natural decontaminant was 20 mg/L. Of the water contaminant treatment efficiency of the intake and water purification plants, Chl-a averaged 74.0% elimination efficiency from $5.0mg/m^3$ to $1.3mg/m^3$ and the maximum treatment efficiency was 91.5% removal efficiency when the inflow concentration of Chl-a was $11.8mg/m^3$. In addition, 51.2% and 47.1% of the taste and odor indicator items, geosmin and 2-MIB, resulted from the overgrowth and decaying of algae, respectively, to identify toxic substances and odor reduction effects. In addition, elimination efficiencies of SS and Turbidity materials were higher than 70.0%. In the injection of natural algae remover, no effects such as sudden changes in water quality due to secondary reactions were found, and appropriate levels were maintained under water treatment conditions.
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2002.09a
/
pp.257-260
/
2002
The main purpose of this research is to find suitable treatment methods of wastewater effluent for artificial recharge. For this purpose, we search the effluent quality of wastewater treatment plant and possibility of additional filtration process. Particles ranged 2 ~ 5 ${\mu}{\textrm}{m}$ and 15~20 ${\mu}{\textrm}{m}$ in "T" WWTP(Waste Water Treatment Plant) effluent were relatively dominant. In dual-media filtration system operation, head-loss development of column 1 was about two times faster than column 2, and head-loss development within 5 cm from surface was very important factor in operation, Conclusively, for the stable filtration and running time of 1.5~2 day, influent turbidity must keep 5 NTU or below, and filtration system must operated at 280 m/day or below. After filtration of WWTP effluent, water quality reached satisfactory level. This water has potential of agricultural reusing, flushing water in building, recharging water to river or stream at dry season and artificial recharge of ground water.und water.
Membrane backwashing waste shows seasonally different characteristics and it has bad settleability differently from general backwashing waste in water treatment plant. When chemicals was injected to membrane backwashing waste, the settleability was better than chemicals was not injected. However, when settled lower sludge was not discharged, flowing sludge continuously was concentrated over a certain surface and floatation penomena occurred according to flowing velocity. When the lower sludge was discharged continuously in the thickener to prevent floatation penomena of turbidity materials, the depth of sludge surface was the least and the settleability increased.
Kim, Jin Lee;Hwang, Ha-Sun;Kim, Sang-Soo;Lee, Jae Kwan
Journal of Korean Society on Water Environment
/
v.29
no.5
/
pp.591-597
/
2013
The input emergy of an advanced treatment plant for reducing the 1 kg of TN and TP was estimated 4.14E+14 sej/kg, 5.02E+15 sej/kg, respectively. In addition, the input emergy of constructed wetland for reduction of the 1 kg of TN and TP reduction was estimated to be 2.48E+14 sej/kg, 3.38E+15 sej/kg, respectively. The cost reducing 1 kg of TN and TP for an advanced treatment plant was estimated 197,466 won and 2,388,739 won respectively and constructed wetland was estimated 117,976 won and 1,609,213 won respectively. As a result, All of the emergy source of constructed wetland for reducing non-point source is renewable resource. If we use the constructed wetland, it results in enhancing economic value by reducing of non-point pollution, controlling a flood and providing the habitat of animals or plants. Improving water quality program in the Nakdong River Basin should be changed into an ecological treatment facilities from expansion of the sewage treatment facilities and advanced treatment plant using high cost and non-renewable energies.
For the sustainable management of marine ecosystem in Masan Bay, we have to assess the carrying capacity and standard of target water quality. In this research, we assume that all pollutants loads are treated in Dukdong sewage treatment plant, then we simulate the physical-biological model for prediction water quality for the achievement of standard water quality. In 2001 year, for the achievement of COD 2.5 mg/L, we need to reduce COD $90\%$, nitrogen $30\%$, phosphate $90\%$ than that of the present value, According to these results, the water quality of sewage treatment plant is required to treat COD 13.5 mg/L, nitrogen 33.3 mg/L, phosphate 6,0 mg/L. If the sewage treatment plant will be expanded much larger in 2011, it will need to be treated in COD 6.6 mg/L, nitrogen 2.5 mg/L, phosphate 5 mg/L for the achievement of water quality standard in COD 2.5 mg/L.
This study was conducted to survey trihalomethane(THMs) levels in finished water of J water treatment plant and examine its reduction by powder activated carbon(PAC) treatment. Samples were collected weekly based and head-space technique was employed to determine THMs levels by G.C-ECD. THMs levels in finished waters were highest in August and showed close relationship with water temperature. All the samples satisfied the drinking water limit(100 ${\mu}$g/l) for THMs. The individual formation rates of THMs were 64.8% for CHCl$_3$, 28.4% for CHCl$_2$BR, 6.5% for CHClBr$_2$ and 0.3% for CHBr$_3$, respectively and showed little monthly difference. The reduction efficiency of THMs formation by PAC treatment was 67% during July and August. Bromine substituents were more efficiently reduced than CHCl$_3$ by PAC.
A mass balance of process was calculated by using the analysis of basic unit and environmental assessment of all the processes of Busan fashion color industry cooperative that operates a combined heat and power plant and a bio treatment plant. The mass balance for the combined heat and power plant was done, based on boiler and water treatment processes while each unit reactor was used for the bio treatment plant. From the results above, a resource recycle network, a treatment flowchart for food waste water/wastewater treatment and a carbon reduction program were established.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.