• Title/Summary/Keyword: Water supply resources

Search Result 892, Processing Time 0.036 seconds

EVALUATION OF THE WATER RESOURCES ASPECT OF THE OPERATING RESULTS OF THE DAECHEONG MULTIPURPOSE DAM

  • Noh, Jaek-young
    • Water Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.17-36
    • /
    • 2004
  • This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.

  • PDF

A Study on the Method of Energy Evaluation in Water Supply Networks (상수관망의 에너지 평가기법에 관한 연구)

  • Kim, Seong-Won;Kim, Dohwan;Choi, Doo Yong;Kim, Juhwan
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.7
    • /
    • pp.745-754
    • /
    • 2013
  • The systematic analysis and evaluation of required energy in the processes of drinking water production and supply have attracted considerable interest considering the need to overcome electricity shortage and control greenhouse gas emissions. On the basis of a review of existing research results, a practical method is developed in this study for evaluating energy in water supply networks. The proposed method can be applied to real water supply systems. A model based on the proposed method is developed by combining the hydraulic analysis results that are obtained using the EPANET2 software with a mathematical energy model on the MATLAB platform. It is suggested that performance indicators can evaluate the inherent efficiency of water supply facilities as well as their operational efficiency depending on the pipeline layout, pipe condition, and leakage level. The developed model is validated by applying it to virtual and real water supply systems. It is expected that the management of electric power demand on the peak time of water supply and the planning of an energy-efficient water supply system can be effectively achieved by the optimal management of energy by the proposed method in this study.

A Spread Sheet Model for a Long Range Water Supply Planning (장기 용수 공급계획 수립을 위한 스프레드 쉬트 모델)

  • 김승권
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 1992.07a
    • /
    • pp.479-489
    • /
    • 1992
  • A mathematical model for a long range water supply planning is develoted as a dynamic capacitated facility location problem, in which operation costs and two types of fixed costs are considered. The fixed costs are for water supply systems such as dams and reservoirs and for water conveyance systems of waterways or conduits from each water supply points. A Spreadsheet model is developed to support the efficiency of user interface and to implement a heuristic solution procedure. The proposed solution procedure utilizes SOLVER tool and it has been applied to a system with fictitious data but with reality and applicability in mind. As a result of the mathematical analysis, not only the most economic construction timings of surface water supply facilities and distribution systems but also the most economical water supply operating patterns are identified.

  • PDF

Reevaluation of Design Frequency of Drought and Water Supply Safety for Agricultural Reservoirs under Changing Climate and Farming Methods in Paddy Field (기상 및 영농방식 변화에 따른 농업용 저수지의 설계한발빈도 및 이수안전도 재평가)

  • Nam, Won-Ho;Kwon, Hyung Joong;Choi, Kyung-Sook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.1
    • /
    • pp.121-131
    • /
    • 2018
  • Past climate change influences multiple environmental aspects, certain of which are specifically related to agricultural water resources such as water supply and demand. Changes on rainfall and hydrologic patterns can increases the occurrence of reservoir water shortage and affect the future availability of agricultural water resources. It is a main concern for sustainable development in agricultural water resources management to evaluate adaptation capability of water supply under the changing climate and farming methods in paddy field. The purpose of this study is an evaluation method of design frequency of drought and water supply safety for agricultural reservoirs to investigate evidence of climate change occurrences at a local scale. Thus, it is a recommended practice in the development of water supply management strategies on reservoir operation under changing climate and farming methods in paddy field.

Automatic Control on Dosing Coagulant as to Stream Current

  • Oh, Sueg-Young;Byun, Doo-Gyoon;Hwang, Jae-Moon;Song, Hyun-Sung
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1318-1321
    • /
    • 2005
  • As recently raw water quality has been polluted as well as its quality has been remarkably varied according to season and region, the precise control of coagulant dosage is being keenly required in water treatment plants. The amount of coagulant is closely related to raw water quality such as turbidity, alkalinity, water temperature, pH, electrical conductivity, etc. Since the optimum quantity of chemicals is not yet finalized, so dosage rate must be decided by using jar test that takes one or two hours. Hereupon, the output signal of stream current and multi-regression on historical data were proposed to be applied to the coagulant dosing control. In consequence of applying the scheme to automatic determination of the dosage rate, it was testified that the determination of dosage rate was very effective in case it is performed as to real-time sensing of water quality and the output signal of stream current.

  • PDF

Multiple Regression Equations for Estimating Water Supply Capacities of Dams Considering Influencing Factors (영향요인을 고려한 댐 용수공급능력 추정 회귀모형)

  • Kang, Min Goo;Lee, Gwang Man
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.11
    • /
    • pp.1131-1141
    • /
    • 2012
  • In this study, factors that influence water supply capacities of dams are extracted using factor analysis, and multiple regression equations for estimating water supply capacities of dams are developed using the analysis results. Twenty-one multi-purpose dams and twelve Municipal and Industrial (M&I) water supply dams are selected for case studies, and eight variables influencing water supply capacities of dams, namely: watershed area, inflow, effective reservoir storage, grade on amount of M&I water supply, grade on amount of agricultural water supply, grade on amount of in-stream flow supply, grade on river administration, and grade on average rainfall, are determined. Two case studies for multi-purpose dams and M&I water supply dams are performed, employing factor analysis, respectively. For the two cases, preliminary tests, such as reviewing matrix of correlation coefficient, Bartlett's test of sphericity, and Kaiser-Meyer-Olkin (KMO) test, are conducted to evaluate the suitability of the variables for factor analysis. In case of multi-purpose dams, variables are grouped into three factors; M&I water supply dams, two factors. The factors are rotated using Varimax method, and then factor loading of each variable is computed. The results show that the variables influencing water supply capacities of dams are reasonably selected and appropriately grouped into factors. In addition, multiple regression equations for predicting the amounts of annual water supply of dams are established using the factor scores as explanatory variables, it is identified that the models' accuracies are high, and their applications to determining effective storage capacity of a dam during dam planning and design steps are presented. Consequently, it is thought that the variables and factors are useful for dam planning and dam design.

Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow (발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정)

  • Jeong, Gimoon;Kang, Doosun;Kim, Dong Hyun;Lee, Seung Oh;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.515-529
    • /
    • 2022
  • Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.

Water Recources Evaluation using Network Optimization Model (Network Optimization Model을 이용한 수자원 평가)

  • Lee, Gwang-Man;Lee, Jae-Eung;Sim, Sang-Jun;Go, Seok-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.2
    • /
    • pp.143-152
    • /
    • 1999
  • South-eastern part of Kyungbuk Province is suffering from lack of suitable water development sources due to geographic condition and insufficient water sources condition. In order to find an appropriate solution, extensive studies are carried out such as investigation of new dam sites, regional water supply system, modification of existing water supply system, rehabilitation of old water resources structures and development of off-stream reservoirs. The network optimization model is applied for evaluation of the newly suggested water development alternatives. The results show that if water supply system is constructed until 2011, the reliability of water supply to Pohang and Kyungju region will be more than 95% and the network optimization model can be used to analyse the management of water resources system considering water rights or priority orders.

  • PDF

A Improvement of Energy Efficient Ratings for Public Buildings (공공사옥 건축물 에너지효율등급 향상을 위한 개선기법 및 사례)

  • Jeong, Han-Sang;Byeon, Il-Hwan;Kim, Woo-Yong;Jeong, Gyeong-Won
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2097-2098
    • /
    • 2011
  • 한국수자원공사 전북지역본부는 2009년 1월 전북 전주시 여의동에 본부신축공사를 착공하였다. 같은 해 12월 정부는 저탄소 녹색성장을 위해 신축 공공청사 건축물에너지효율 1등급 취득 의무화 제도를 시행하여 2010년 1월부터 신축되는 모든 공공청사는 건물에너지효율 1등급 취득이 의무화 되었다. 전북지역본부와 같이 진행중인 건축물에 대해서는 강제성은 없고 에너지효율 향상을 위한 제반 조치 마련토록 권고하였다. 그러나 전북지역본부는 정부정책과 공사 이미지 제고를 위해 진행중인 공사에 대해 건축물 에너지효율인증등급 향상을 위한 개선 방안을 수립하고 설계변경을 통해 결국 1등급 인증을 획득하였다.

  • PDF

The Krang Ponley Water Resources Development Project on Cambodia (캄보디아 크랑폰리강 유역 다목적 수자원개발사업)

  • Kim, Myong-Nim;Choi, Byoung-Seub;Chun, Gun-Ill
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.823-828
    • /
    • 2008
  • In accordance with the Cambodian government's poverty reduction policy, the Krang Ponley Water Resources Development Project was selected and has been carried out as a priority to develop the northwest areas of Phnom Penh since early 2003. Rehabilitation and new construction of water supply system such as embankments, canals and hydraulic structures are urgently needed for stable water supply, hydropower generation and flood damage reduction within the project area. The completion of the project is expected to be extremely helpful in the economic development of Cambodia as well as to improving the economic conditions of the residents in the project area.

  • PDF