KSCE Journal of Civil and Environmental Engineering Research
/
v.41
no.1
/
pp.29-37
/
2021
It is important to introduce a local adaptive water supply system for upper mountainous regions, which provide a margin of water supply. This can be done through the process of securing a water source, planning for optimal use, and combining it with a water source that can be linked. In particular, in a mountainous region located at the uppermost part of the watershed, an approach should be found to utilize the groundwater discharge supplied through valley water and lateral discharge. This study sought to improve the water supply system using sand dams in drought-prone areas in Chuncheon, in Gangwon Province. Our approach involved virtually installing a sand storage tank under the existing water source to perform modeling in consideration of the current water intake and calculating the amount of water that can be taken from the sand dam. When the sand dam was applied at a size four times larger than the existing water source, it was found that the groundwater drainage increased significantly with changes in water surface slope and hydraulic conductivity.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2003.10a
/
pp.495-498
/
2003
In order to analyze water supply capacity in estuary barrage dam, a system was developed in which base model was consisted of daily water balance model and daily inflow model. Agricultural water demand to paddy fields and domestic and industrial water demand were considered in this daily water balance model. Also outflow volume through sluice gate and inside water level at time to start outflow was conditioned initially to simulate reservoir storage. The DAWAST model was selected to simulate daily reservoir inflow in which return flows from agricultural, domestic and industrial water were included to simulate runoff. Using this developed system, water supply capacity in the Keum river estuary reservoir was analyzed.
Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
/
1995.12a
/
pp.9-21
/
1995
A planning support system enhances our ability to use water capacity expansion as an urban growth management strategy. This paper reports the development of capacity expansion modeling of water supply as part of the continuing development of such a planning support system (PEGASUS: Planning Environment for Generation and Analysis of Spatial Urban Systems) to incorporate water supply, This system is designed from the understanding that land use and development drive the demand for infrastructure and infrastructure can have a significant influence on the ways in which land is developed and used. Capacity expansion Problems of water supply can be solved in two ways: 1) optimal control theory, and 2) mixed integer nonlinear programming (MINLP). Each method has its strengths and weaknesses. In this study the MINLP approach is used because of its strength of determining expansion sizing and timing simultaneously. A dynamic network optimization model and a water-distribution network analysis model can address the dynamic interdependence between water planning and land use planning. While the water-distribution network analysis model evaluates the performance of generated networks over time, the dynamic optimization model chooses alternatives to meet expanding water needs. In addition, the user and capacity expansion modeling-to-generate-alternatives (MGA) can generate alternatives. A cost benefit analysis module using a normalization technique helps in choosing the most economical among those alternatives. GIS provide a tool for estimating the volume of demanded water and showing results of the capacity expansion model.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1998.10a
/
pp.279-286
/
1998
The south-western part of Korea is situated in an unbalance of water supply and demand relating to the Keum, Mankyung, Dongjin and Youngsan River and their estuary reservoirs. For example, the Keum River estuary reservoir is discharging the larger amount of yearly runoff into the sea due to the small storage capacity, while Saemankeum estuary reservoir which is under construction, has the smaller runoff amount comparing with its storage capacity, And the downstream area of the Youngsan River, such as Youngkwang, Youngam are deficient in water due in larger demand and smaller supply. In order to solve the above unbalanced water supply and demand and also to improve the water use efficiency, the Hierarchical Operation Model for Multi-reservoir System(HOMMS) has been developed and applied to analyze the multi-reservoir operation assuming that the above reservoirs were linked each other. The result of this study shows that 2,148MCM of annual additional water requirement for agricultural and rural water demands are required in this region at 2011 of target year, and these demands can be resolved by diverting and reusing 1,913MCM of the released water from the estuary reservoirs into the sea.
Journal of The Korean Society of Agricultural Engineers
/
v.53
no.3
/
pp.59-64
/
2011
The objective of the study is to develop life cycle inventory (LCI) database of dam, a major facility for irrigation water supply. The types of database developed are three out of nine dams according to the size of the wate r storage capacity: two kinds larger than 500,000 $m^3$ depending on gate for discharging (Type 1) and the other dam smaller than 500,000 $m^3$ (Type 2). According to the LCI analysis, type 1 larger than 500,000 $m^3$ storage capacity with gate has the lowest environment impact in the 6 impact categories. The impact of the type 1 accounts for 7~35 % of the type 2 for supplying irrigation water. Comparing with the environment impacts of water for other uses such as drinking and industrial water, the impacts of 1 $m^3$ irrigation water supply is 4~45 % of the one for industrial water supply and 1~16 % of the drinking water's. The three types of LCI DB on the irrigation water by dams will be useful in the application of Life Cycle Assessment in agricultural products and environmental labelling including carbon footprint since it is complied to the guidelines of LCI DB constr uction issued by Ministry of Environment and Ministry of Knowledge Economy.
Under the supply-oriented policy, efficiency and rationale have not been fully considered in planning of water supply facilities in Korea. As a case, this study shows that large-size systems are suffering from overcapacity problem of water treatment plants, and thus discusses what options should be applied to deal with inefficiency. Water demand of large-size systems has suddenly decreased for the last 10 years while water demand has been often assumed to increase at a regular rate in planning of plants according to excess capacity hypothesis. This inconsistency led to a serious overcapacity. In 2006, total excess capacity of nine large-size systems was more than 1.2 times as large as maximum daily demand of total customers in Seoul. However, their options are expected to stay ex post facto. To prepare the risk of overcapacity, and draw large benefits out of the plants, the authors and other professionals in Korea should further discuss the more adaptive method for prediction of water demand, and systems integration between a large-size system and adjoining systems.
Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.
Kim, Gi Joo;Kim, Jiheun;Seo, Seung Beom;Kim, Young-Oh
Journal of Korea Water Resources Association
/
v.56
no.1
/
pp.11-21
/
2023
This study suggests the drought resilience index as S-day as a means of preparing for the recent extreme drought, allowing for the actual operational identification of each drought countermeasure's priority as well as the vulnerability of water resource facilities to drought. Although each dam's drought measures are unique in this case, the representative examples include adjusting the water supply, linking the functioning of various facilities, and considering emergency capacity. Here, 15 multipurpose dams and water supply dams in Korea were inspected. Under the return period of 20-year drought, most of dams showed stable by adjusting the water supply overall. The measures, however, did not seem to be able to resist a multi-year drought lasting more than two years. Besides, Hoengseong and Anodong-Imha Dam only lasted a year under the 100-year drought return period with other measures. Without the deployment of drought mitigation strategies, it is expected that the Hoengseong Dam, Andong-Imha Dam, Gunwi Dam, Unmun Dam, Daecheong Dam, and Juam Dam would not be able to meet the all water demand for a year under the 20-year drought condition. The ideal capacity for each drought measure was then suggested. Additionally, by increasing or decreasing the current supply contract by 10% in order to account for demand changes resulting from socio-economic instability, the drought response capacity of all 15 dams was re-evaluated. By lowering the supply contract amount by 10%, it was possible to endure a severe drought.
In this study, the water supply reliability of the andong and Imha dam was analyzed using inflow data for 360 months from 1993 to 2022 through allocation model. First, in the analysis results of additional water supply to Deagu city, the water supply reliability of Rule (B) was the highest at 86% for andong dam, 84% for imha dam, and 80% for the control point. However, when the planned supply was supplied, the analysis results showed 94%, 93%, and 90%. Next, in the quantitative reliability analysis results, when considering additional water supply to Deagu city, Rule (A), Rule (B), and Rule (C) were analyzed as 88%, 88%, and 88%, respectively, based on the control point. When supplying the planned water supply, the quantitative reliability analysis results were 95% equally based on Rule (A), Rule (B), and Rule (C). Because of evaluating the two reliability methods, the number of shortages increases significantly when additional water is supplied to Daegu City, but the shortage is generally 5-7%, resulting in a relatively small shortage compared with the increase in the number of shortages. In the case of resilience and vulnerability, additional water supply to Daegu City takes more than two months to restore than the existing planned water supply, and the average shortage was calculated to be smaller than that of supplying the planned water. According to the results of the analysis, Andong dam has an average water storage of 130x106 m2 and Imha dam has 50x106 m2. In this deficient water supply can be compensated by water from the Nakdong river.
This study was carried out to evaluate thermal performance of the renewable hybrid heat supply system with solar thermal system and wood pellet boiler for Zero Carbon Green home of apartment houses. The hybrid heat supply system was set up at Korea Institute Energy Research in 2011. The system was comprised of the wood pellet boiler unit with heat capacity designed as 20,000 kacal/hr, a evacuated tubular solar collector 3.74 $m^2$ of aperture area at the $20^{\circ}$ install angle, a 0.3 $m^3$ hot water storage tank, a 0.15 $m^3$ hot water storage tank for space heating. Thermal performance tests for one-house of apartment house were carried out by hot water load and heating load in winter season through the hybrid heat supply system. As a result, hot water energy supplied by the hybrid heat supply system was 11kWh in a day. Solar thermal energy portion was 2.99kWh which is 27% of the total hot water energy supply. wood pellet boiler supply portion was 8.017kWh which is 73% of the total hot water energy supply.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.