• Title/Summary/Keyword: Water management treatment system

Search Result 324, Processing Time 0.026 seconds

Economical selection of optimum pressurized hollow fiber membrane modules in water purification system using RbLCC

  • Lee, Chul-sung;Nam, Young-wook;Kim, Doo-il
    • Membrane and Water Treatment
    • /
    • v.8 no.2
    • /
    • pp.137-147
    • /
    • 2017
  • A water treatment utility in South Korea operates a large system of pressurized hollow fiber membrane (PHFM) modules. The optimal selection of membrane module for the full scale plant was critical issue and carried out using Risk-based Life Cycle Cost (RbLCC) analysis based on the historical data of operation and maintenance. The RbLCC analysis was used in the process of decision-making for replacing aged modules. The initial purchasing cost and the value at risk during operation were considered together. The failure of modules occurs stochastically depending on the physical deterioration with usage over time. The life span of module was used as a factor for the failure of Poisson's probability model, which was used to obtain the probability of failure during the operation. The RbLCC was calculated by combining the initial cost and the value at risk without its warranty term. Additionally, the properties of membrane were considered to select the optimum product. Results showed that the module's life span in the system was ten years (120 month) with safety factor. The optimum product was selected from six candidates membrane for a full scale water treatment facility. This method could be used to make the optimum and rational decision for the operation of membrane water purification facility.

The Optimal Control Systems of Dilution Water and Point Sources for Water Quality Management in Stream (하천 수질관리를 위한 희석수량 및 점오염원의 최적 제어시스템)

  • Shim, Soon Bo;Han, Jae Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.2
    • /
    • pp.295-305
    • /
    • 1993
  • The purpose of this study is to investigate the theoretical methodology for development of an water quality management system with the optimal control of dilution water and point sources in streams. For the development of objective function and constraints, the control vectors are defined with stream inflows and concentrations of effluents at water treatment plant, and the state vectors are defined with water quality parameters such as DO, $BOD_5$, COD and SS concentrations. The applied system solution technique is augmented Lagrangian technique. The developed water quality optimal management methodology was applied to a case study at the Musim stream in Cheong-ju city. The results of the application show that the methodology is suitable for the comprehensive analysis of polluted water systems, and will be utilized to more useful operation of limited water resources in Korean streams.

  • PDF

INTRODUCTION OF THE G-7 PROJECT: Integrated System of Water Quality Management (G-7 과제에 대한 소개 : 수질관리를 위한 통합 시스템)

  • Kim, Kye-Hyun;Kim, Eui-Hong;Lee, Hong-Keun;Lee, In-Seon;Ryu, Joong-Hi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.2 s.2
    • /
    • pp.143-152
    • /
    • 1993
  • A long-term water quality study has been initiated by the Korean Ministry of Environment(MOE) - The G-7 Project--in cooperation with two national research institutes, an University research tn and a consulting firm. This study includes the development of computer software for total water quality management system, so called ISWQM (Integrated System of Water Quality Management). ISWQM includes four major components: a GIS database; two artificial intelligence (AI) based expert systems to estimate pollutant loadings and to provide cost-effective wastewater treatment system for small and medium size urban areas; and computer programs to integrate the database and expert systems. ISWQM is to provide user-friendly Decision Support System (DSS) for water quality planners. A GIS was used to create spatial database which stores all the necessary data to n DSS. GIS was also used to integrate the four components of ISWQM from data creation to decision making through Graphic User Interface (GUI). The results from the first phase of this study showed that GIS would provide an effective tool to build DSS using expert system.

  • PDF

Cause Diagnosis and Reduction Measures of Foaming in the Treated Wastewater Outlet of D Wastewater Treatment Plant (하수처리수 방류구의 거품발생 원인진단 및 저감방안: 국내 하수처리장 사례를 중심으로)

  • Shin, Jae-Ki;Cho, Youngsoo;Kim, Youngsung;Hwang, Soon-Jin
    • Korean Journal of Ecology and Environment
    • /
    • v.49 no.2
    • /
    • pp.124-129
    • /
    • 2016
  • This study was conducted to suggest the cause analysis and mitigation measures of foaming generated in the effluent of wastewater treatment plant. The foam generated in the outlet connected with the tidal river system was identified as structural problems. And the main cause of foaming was air entrainment by an impinging jet and the internal accumulation by the diffusion barrier. In consideration of these conditions, it present the effective ways such as micro-screen and submerged outlet, to mitigate the foaming generated in the water channel and outlet end.

A Study on Fuzzy Control Method of Energy Saving for Activated Sludge Process in Sewage Treatment Plant (하수처리 활성오니공정의 에너지 절감을 위한 퍼지 제어 방법에 관한 연구)

  • Nahm, Eui-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1477-1485
    • /
    • 2018
  • There are two major issues for activated sludge process in sewage treatment plant. One is how to make sewage be more clean and the other is the energy saving in sewage treatment process. The major monitoring sewage qualities are chemical oxygen demand, phosphorus, nitrogen, suspended solid in effluent. These are transmitted to the national TMS(Telemetry Monitoring System) at every hour. If these exceed the environmental standard, the environmental charges imposed. So, these water qualities are to be controlled below the environmental standard in operation of sewage treatment plant. And recently, the energy saving is also important in process operation. Over 50% energy is consumed in blowers and motors for injection oxygen into aeration tank. So, with the water qualities to be controlled below the environmental standard, the energy saving also is to be accomplished for efficient plant management. Almost researches are aimed to control water quality without considering energy saving. AI techniques have been used for control water quality. AI modeling simulator provided the optimal control inputs(blower speed, waste sludge, return sludge) for control water quality. Blower speed is the main control input for activated sludge process. To make sewage be more clean, the excessive blower speed is supplied, but water quality is not better than the previous. In results, non necessary energy is consumed. In this paper we propose a new method that the energy saving also is to be accomplished with the water qualities to be controlled below the environmental standard for efficient plant management. Water qualities in only aeration tank are used the inputs of fuzzy models. Outputs of these models are chemical oxygen demand, phosphorus, nitrogen, suspended solid in effluent and have the environmental standards. In test, we found this method could save 10% energy than the previous methods.

A Study on the Activation of Non-government Participation in Total Maximum Daily Load System using Private Discharge Facilities Reduction Potential Analysis (개별배출시설 삭감잠재량 분석을 통한 수질오염총량제의 민간참여 활성화 방안 연구)

  • Kim, Hongtae;Shin, Dongseok;Kim, Hyeonjeong;Choi, Inuk;Lee, Miseon;Kim, Yongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.715-722
    • /
    • 2015
  • Four major river basin in Korea has been managed with Total Maximum Daily Load(TMDL) System. Water quality indicators as targeted pollutants for TMDL were BOD and TP. In order to satisfy water quality criteria, government allocation using public treatment facilities and its action plan has been used. However, the role to improve water quality were recently faced to its limitation. It is time to require the role of non-government allocation in private discharge facilities to control good water quality. This study investigated three different scenarios in reduction demands of non-government allocations about industry and private sewages. The three different scenarios were discharge under 1) legal water quality standard, 2) water quality level in 2011 and 3) current water quality level with maximum value in group. The results showed that reduction potential in water discharge for TP indicator was 1,118kg/day, under second scenario with 20% of deduction. This results arrived at 42% of whole reduction potential costs and 0.012mg/L improvement in water quality. In conclusion, to intrigue voluntary participation in non-government allocation, various benefits such as tax reduction, tax exemption, and water quality trading should be provided.

Development of Biological Filtration Process for Effective Nitrogen Removal in Tertiary Treatment of Sewage (생물막 여과반응기를 이용한 고도질소 제거법의 개발)

  • Jeong, Jin-Woo;Kim, Sung-Won;Tsuno, Hiroshi
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.222-229
    • /
    • 2006
  • The treatment performance and operational parameters of a tertiary wastewater treatment process a biological filtration system were investigated. The biological filtration system consisted of a nitrification filter (Fiter 1) and a polishing filter with anoxic and aerobic parts (Filter 2). SS, T-C-BOD, and T-N in effluent were kept stable at less than 3, 5 mg/L, and 5 mgN/L, respectively, under a HRT in Filter (filter-bed) of 0.37~2.3 h. T-N at the outlet of Filter 2 were about 1~5 mgN/L under the condition of LV of 50~202 m/d. In Filter 2, denitrification was accomplished under LV of 50~168 m/d in a 1 m filter-bed. However, the denitrification capacity reached the maximum when the linear velocity was increased to 202 m/d. Relationship between increase in microorganism and headloss was clearer in Filter 2. As a result, the denitrification rate increased from 1.0~2.3 kgN/($m^3-filter-bed{\cdot}d$) as the headloss increased. The COD removal rate was 6.0~9.6 kgCOD/($m^3-filter-bed{\cdot}d$) when operated with Filters 1 and 2. These results mean that captured bacteria contributed a part of COD consumption and denitrification. The maximum nitrification and denitrification rate was 0.5 and 4 kgN/($m^3-filter-bed{\cdot}d$) in Filter 1 and 2.The ratio of backwashing water to the treated water was about 5~10 %. In Filter 1, wasted sludge in backwashing was only 0.7~5.3 gSS/($m^3$-treated water). In Filter 2, added methanol was converted into sludge and its value was 8.0~24 gSS/($m^3$-treated water). These results proved that this process is both convenient to install as tertiary treatment and cost effective to build and operate.

Selection of Best Management Practices for Urban Watershed Corresponding to the Runoff Characteristics from Non-point Pollution Sources (도시지역의 비점오염유출특성을 고려한 도시하천 적정관리방안)

  • Chi, Hong-Jin;Shin, Gwy-Am
    • Journal of Environmental Science International
    • /
    • v.25 no.1
    • /
    • pp.31-40
    • /
    • 2016
  • The purpose of this study was to analyse the runoff characteristics of non-point pollution sources in an urban watershed and determine the effectiveness of newly installed riverwater treatment system to reduce water pollution caused by storm runoff in the urban watershed. The results of this study showed that the levels of BOD5 and suspended solid were highly influenced by first-flush effect and the pollutant load of those two parameters were also very high in the urban watershed. Meanwhile, the effectiveness of riverwater treatment system to reduce the levels of BOD5 and suspended solid was relatively high, but those to reduce the levels of T-N and T-P was low, which needs some additional unit treatment process such as filtration and coagulation. Nonetheless, the riverwater treatment system tested was relatively simple in installation and operation, effective in removing many water pollutants and, most importantly, does not require much space as other treatment systems, so it could be an attractive alternative option to reduce riverwater pollution caused by storm runoff in urban watersheds.

Risk Assessment for Retrofitting an Electrolysis Type Ballast Water Treatment System on an Exiting Vessel (현존선에 전기분해방식 선박평형수 처리장치 설치를 위한 위험도 평가 분석)

  • JEE, Jae-Hoon
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.29 no.3
    • /
    • pp.665-676
    • /
    • 2017
  • Over the past several years, sea trade have increased traffic by ships which highlighted a problem of unwanted species invading the surrounding seas through ship's ballast water discharge. Maritime trade volume has continuously increased worldwide and the problem still exists. The respective countries are spending billions of dollars in an effort to clean up the contamination and prevent pollution. As part of an effort to solve marine environmental problem, BWM(Ballast Water Management) convention was adopted at a diplomatic conference on Feb. 13 2004. In order to comply harmoniously this convention by each country. This convention will be effective after 12 months from the date which 30 countries ratified accounting for more than 35% of the world merchant shipping volume. On Sep. 8 2016, Finland ratified this convention and effective condition was satisfied as 52 states and world merchant vessel fleet 35.1441%. Thus, after Sep. 8 2017, all existing vessels shall be equipped with BWTS(Ballast Water Treatment System) in accordance with D-2 Regulation, which physically handles ballast water from ballast water exchange system(D-1 Regulation). In this study, we analyzed in detail the optimal design method using the Risk Analysis and Evaluation technique which is mainly used in the manufacturing factory or the risky work site comparing with the traditional design concept method applying various criteria. The Risk Assessment Method is a series of processes for finding the Risk Factors in the design process, analyzing a probility of the accident and size of the accident and then quantifying the Risk Incidence and finally taking measures. In this study, this method was carried out for Electrolysis treatment type on DWT 180K Bulk Carrier using "HAZOP Study" method among various methods. In the Electrolysis type, 63 hazardous elements were identified.

Consideration on the Concentration of the Active Substances Produced by the Ballast Water Treatment System (선박평형수 처리장치의 활성물질 농도에 관한 고찰)

  • Kim, Eun-Chan;Oh, Jeong-Hwan;Lee, Seung-Guk
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.3
    • /
    • pp.219-226
    • /
    • 2012
  • The International Maritime Organization (IMO) adopted the International Convention for the Control and Management of Ships' Ballast Water and Sediments in 2004 to prevent the transfer of aquatic organisms via ballast water. Thirty-four ballast water treatment systems were granted IMO active substance basic approval, among which twenty systems were granted final approval. This paper is an in-depth consideration of the mechanism principles of the treatment systems that received active substance basic or final approval from IMO, and on the concentration of Total Residual Oxidant (TRO). The TRO maximum allowable discharge concentration was reduced by neutralization equipment, resulting with a concentration lower than 0.2 ppm. However, between various treatment systems TRO maximum allowable dosage showed large differences, ranging from 1 to 15 ppm. The discrepancies of treatment allowable dosage concentration between different treatment systems are largely due to the properties of species and water conditions such as the temperature and turbidity, rather than the characteristics of treatment systems and the type or presence of filters etc.