• 제목/요약/키워드: Water load

검색결과 2,489건 처리시간 0.022초

오염할당부하량의 초과현황 및 초과해소를 위한 삭감계획 유형에 따른 페널티 적용방안 (Excessive State of Pollutant Load Allocation and Penalty Application Schemes based on Pollutant Reduction Plan Types for Solving Excessive Problem of Allocation)

  • 박재홍;박배경;오승영;황하선;이재관
    • 한국물환경학회지
    • /
    • 제29권1호
    • /
    • pp.66-73
    • /
    • 2013
  • Total Maximum Daily Loads (TMDLs) system was introduced to manage pollution load of watershed and to improve water quality of unit watershed so that it is possible to protect dringking water soureces. Load allocation observation is the most important factor in TMDLs system. Because if load allocation is not observed, it is difficult to achieve water quality goal of unit watershed. Also it is impossible to improve water quality of the drinking water sources. Therefore it is necessary to apply some kind of sanctions (penalty) in case of excess of load allocation. The sanctions have to be, however, applied differently based on various reduction plan types, i.e., using the reduction load planed in 2nd phase, delay the completion, additional reduction in 2nd phase, error of the pollution sources, etc. Moreover, the penalty load should be properly imposed, lest it should be overburden the provence. The reduction load trade inter province must be restrictively permmitted only the same unit watershed.

수질오염총량제도 유역의 수질 및 부하량 평가를 위한 웹기반 LDC 시스템의 적용 (Application of Web-based Load Duration Curve System to TMDL Watersheds for Evaluation of Water Quality and Pollutant Loads)

  • 강현우;류지철;신민환;최중대;최재완;신동석;임경재
    • 한국물환경학회지
    • /
    • 제27권5호
    • /
    • pp.689-698
    • /
    • 2011
  • In South Korea, Total Maximum Daily Load (TMDL) has been enforced since 2004 to restore and manage water quality in the watersheds. However, the appraisal of TMDL in South Korea has lots of weaknesses to establish the plan for recovery of water quality because it just evaluates the target water quality during the particular flow duration interval. In the United States, Load Duration Curve (LDC) method bas been widely used in the TMDL to evaluate the water quality and pollutant loads considering variation of stream flow. In a recent study, web-based Load Duration Curve system was developed to create the LDC automatically and provide the convenience of use. In this study, web-based Load Duration Curve system was applied in the Gapyeongcheon watershed using the daily flow and 8-day interval water quality data, and Q-L Rating Curve was used to evaluate the water quality and pollutant load in the watershed, also. As a result of study, water quality and pollutant load in Gapyeongcheon watershed were met with water quality standard and allocated load in the all flow durations. Web-based Load Duration Curve system could be applied to the appraisal of South Korean TMDL because it can be used to judge the impaired flow duration and build up the plan of load reduction, and it could enhance the publicity. But, web-based Load Duration Curve system should be enhanced through addition of load assessment tools such as Q-L rating curve to evaluate water quality and pollutant load objectively.

금강수계 1단계 수질오염총량관리제의 목표수질 및 할당부하량 달성도 평가 (Evaluation of Water Quality Goal and Load Allocation Achievement Ratio in Guem River Total Maximum Daily Loads for the 1st Phase)

  • 박재홍;오승영;이재관
    • 한국물환경학회지
    • /
    • 제28권6호
    • /
    • pp.859-865
    • /
    • 2012
  • It is necessary to evaluate performances hitherto carried out in the management of Total Maximum Daily Loads (TMDLs) and to set up direction so that this system can be improved continuously in the future. This study was investigated load allocation achievement ratio, water quality goal achievement ratio and interrelation between water quality goal and load allocation for the first period (2004~2010). Load allocation achievement and BOD water quality goal achievement ratio were 50% and 73% in Guem River Basin, respectively. The main reason for excess of load allocation and shortfall of water quality goal were unfulfilled reduction plan and pollution sources increment. Therefore, it is necessary to develop enhanced pollution sources prediction method and make a list realizable reduction plan. 63% of the unit watershed was not interrelation between water quality goal and load allocation. The reason why water quality goal and load allocation had not correlation were water quality of upper unit watershed, increment of inflow quantity, effluent water quality of wastewater treatment plant affected the unit watershed, increment of inner productivity by algae, water quality deterioration during the specific period, river management flow, etc.

지역난방 동절기 공동주택 온수급탕부하의 LS-SVM 기반 모델링 (LS-SVM Based Modeling of Winter Time Apartment Hot Water Supply Load in District Heating System)

  • 박영칠
    • 설비공학논문집
    • /
    • 제28권9호
    • /
    • pp.355-360
    • /
    • 2016
  • Continuing to the modeling of heating load, this paper, as the second part of consecutive works, presents LS-SVM (least square support vector machine) based model of winter time apartment hot water supply load in a district heating system, so as to be used in prediction of heating energy usage. Similar, but more severely, to heating load, hot water supply load varies in highly nonlinear manner. Such nonlinearity makes analytical model of it hardly exist in the literatures. LS-SVM is known as a good modeling tool for the system, especially for the nonlinear system depended by many independent factors. We collect 26,208 data of hot water supply load over a 13-week period in winter time, from 12 heat exchangers in seven different apartments. Then part of the collected data were used to construct LS-SVM based model and the rest of those were used to test the formed model accuracy. In modeling, we first constructed the model of district heating system's hot water supply load, using the unit heating area's hot water supply load of seven apartments. Such model will be used to estimate the total hot water supply load of which the district heating system needs to provide. Then the individual apartment hot water supply load model is also formed, which can be used to predict and to control the energy consumption of the individual apartment. The results obtained show that the total hot water supply load, which will be provided by the district heating system in winter time, can be predicted within 10% in MAPE (mean absolute percentage error). Also the individual apartment models can predict the individual apartment energy consumption for hot water supply load within 10% ~ 20% in MAPE.

오염총량관리제도의 TOC 목표수질 설정 방안 (Establishment of Target Water Quality for TOC of Total Water Load Management System)

  • 김용삼;이은정
    • 한국물환경학회지
    • /
    • 제35권6호
    • /
    • pp.520-538
    • /
    • 2019
  • In this study, it was proposed that a method of setting the target water quality for TOC using the watershed model and the load duration curves to manage non-biodegradable organics in the total water load management system. To simulate runoff and water quality of the watershed, the HSPF model is used which is appropriate for urban and rural areas. Additionally, the load duration curve is used to reflect the variable water quality correlated with various river flow rates in preparing the TMDL plans in the U.S. First, the model was constructed by inputting the loads calculated from the pollutant sources in 2015. After the calibration and verification process, the water quality by flow conditions was analyzed from the BOD and TOC simulation results. When the BOD achieved the target water quality by inputting the target year loads for 2020, the median and average values of TOC were proposed for the target water quality. The provisional method of TOC target water quality for the management of non-biodegradable organics, which is one of the challenges of the total water load management system, was considered. In the future, it is expected to be used as basic data for the conversion of BOD into TOC in the total water load management system.

열원 및 부하조건에 따른 물-공기 히트펌프 시스템의 성능분석 (Performance Analysis of Water-to-Air Heat Pump System under Water Temperature and Load Ratio)

  • 조용;이동근
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.194.2-194.2
    • /
    • 2011
  • Heating and cooling performance has been analyzed for the water-source heat pump system using raw water from Daechung reservoir. During heating operation from March to May, water temperature is not good condition for a heat source due to the higher atmospheric temperature. Avearged heating load ratio is only 14.3%, and the averaged unit COP and system COP are estimated to be 2.46 and 2.15 respectively. The COP is affected considerably by the water temperature, and the unit COP is increased from 2.16 at $5^{\circ}C$ to 2.95 at $11^{\circ}C$. Cooling performance is analyzed with the measured data from June to August. During cooling operation, raw water has lower temperature by 4. $5^{\circ}C{\sim}4.7^{\circ}C$ than the atmosphere. The load ratio is 39.2%, and the averaged unit COP and system COP are estimated to be 7.25 and 6.13 respectively. The heating COP is affected by the load ratio rather than water temperature. The COP is increased for 20%~40% load ratio, while is decreased for 40%~60% load ratio. It is estimated that the compressor operation combination for 3 (two constant speed and one inverter) compressors is changed for the load ratio.

  • PDF

수질오염 총량관리계획과정의 오염부하량 할당에 관한 연구 - 경기도 광주시를 사례로 - (A Study on the Allocation of Permissible Water Pollution Load in the Total Water Pollution Load Management Plan)

  • 김시헌;임재명
    • 환경영향평가
    • /
    • 제14권5호
    • /
    • pp.337-346
    • /
    • 2005
  • Pollution load allocation can likely be much controversial, which is essential to formulate the total water pollution load management plan. Existing rules(or guidances) in Korea, can provide no specific criteria for load allocation. Therefore, this paper studied(comprehensively) possible standards how or why to choose any particular allocation method, which was applied in the Gwangju City's load allocation for the satisfaction of set water quality goal. This load allocation is basically focused on the load reduction of domestic wastewater rather than industrial wastewater, because the land-use is strictly regulated and larger sources of pollution are few in the Gwangju City. This paper recommends the city to increase the capacity of sewage treatment plants, promote sewerage maintenance, and set higher effluent standards.

효과적인 오염총량관리를 위한 데스크탑 기반의 LDC 평가 시스템 개발 (Development of Desktop-Based LDC Evaluation System for Effectiveness TMDLs)

  • 류지철;황하선;이성준;김은경;김용석;금동혁;임경재;정영훈
    • 한국농공학회논문집
    • /
    • 제58권4호
    • /
    • pp.67-74
    • /
    • 2016
  • Load Duration Curve (LDC) can be used as a method for load management of point and non-point pollution source because the LDC easily assesses the water quality corresponding to hydrological changes in a watershed. Recently, the application of LDC to total pollution load management is a growing interest in Korea. In this regard, A desktop-based LDC assessment system was developed in this study to provide convenience to users in water quality evaluation. The developed system can simply produce the LDC by using streamflow and water quality data involved in its database. Also, The system can quantitatively inform the success or failure of the achievement for a target water quality at monthly scale. Furthermore, seasonal water quality and point/non-point pollution load in a watershed can be estimated by this system. We expect that the developed system will contribute to establish local and national policies regarding water management and total pollution load management because of its advantages such as the pollution tracking investigation and the analysis of water quality and pollution loading amount in an ungauged watershed.

수질오염총량관리 단위유역내 토양 양분 및 수질오염 부하량 상관관계 비교 (Correlation between Soil Nutrient Contents and Water Pollutant Loads in Hydrologic Unit Watersheds: Implication on the Total Maximum Daily Loads (TMDLs))

  • 조경식;이호식
    • 한국물환경학회지
    • /
    • 제27권4호
    • /
    • pp.509-515
    • /
    • 2011
  • For this study the 4 sub-watersheds Okdong A, Hankang B, Jecheon A and Hankang C which are the main streams of the Han River within the mid-level region of Chungju Dam are selected and the analysis of soils has been carried out through the soil basic survey. When it comes to the soil erosion amount the soil nutrient load has been calculated by utilizing the RUSLE erosion equation. In case of the data related to the measurement of water flow and quality the information available from the "Water Information System" one of the websites run by the Ministry of Environment has been used to calculate the water pollution load. The correlation between the soil nutrient load and the water pollutant load has been analyzed through making comparison. According to the results related to the soil nutrient load of each sub-watershed the Hankang C shows the highest values TOC 29,986.92 ton/yr, TN 3,860.33 ton/yr and TP 973.97 ton/yr respectively. Even when it comes to the loads related to water quality the Hankang C shows also comparatively high values TOC 6,625.64 ton/yr, TN 7,335.01 ton/yrand TP 145.49 ton/yr respectively. The soil nutrient loads of the sub-watersheds are shown to increase towards the lower stream meaning the load increases in the order of Hankang CHankang B and Okdong A. When it comes to the water pollutant load the value goes up along down the water system meaning the load gets higher in the order of Hankang C, Hankang B and Okdong A while utilizing the mainstream within the mid-level region of Chungju Dam as the basis. The correlation study showed that the nutrient content of soil is proportional to the pollutant load in water with the strongest positive correlation with TOC.

수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구 (A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan)

  • 김시헌;임재명
    • 환경위생공학
    • /
    • 제20권3호
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.