• Title/Summary/Keyword: Water cycle

Search Result 2,159, Processing Time 0.035 seconds

Analysis of Water Cycle Effect by Plan of LID-decentralized Rainwater Management Using SWMM-LID Model in a Low-carbon Green Village (SWMM-LID를 이용한 저탄소 녹색마을의 LID-분산형 빗물관리 계획에 따른 물순환 효과 분석)

  • Lee, Jung-Min;Hyun, Kyoung-Hak;Lee, Yun-Sang;Kim, Jung-Gon;Park, Yong-Boo;Choi, Jong-Soo
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.503-507
    • /
    • 2011
  • There was a plan to develop a low-carbon green village(approximately $400,000m^2$) in A city, a new town. Restoration of water cycle is essential for creation of the low-carbon green village. Therefore, installation plan of LID-decentralized rainwater management facilities for natural water cycle was established for creation of the low-carbon green village. Analyses on effect of the water cycle were performed in conditions of before, after developing the low-carbon green village and after installing the LID facilities(rain garden, constructed wetland, rainwater harvesting facility, etc.) using SWMM-LID model developed by EPA. Due to the characteristic of permeable area before development and significant green spaces after development, installation plan of LID facilities to restore the water cycle did not show an obvious effect. However, potential of the hydrological cycle could be seen by the installation of the LID facilities.

Development of Monthly Hydrological Cycle Assessment System Using Dynamic Water Balance Model Based on Budyko Framework (Budyko 프레임워크 기반 동적 물수지 모형을 활용한 월 단위 물순환 평가체계 개발)

  • Kim, Kyeung;Hwang, Soonho;Jun, Sang-Min;Lee, Hyunji;Kim, Sinae;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.2
    • /
    • pp.71-83
    • /
    • 2022
  • In this study, an indicator and assessment system for evaluating the monthly hydrological cycle was prepared using simple factors such as the landuse status of the watershed and topographic characteristics to the dynamic water balance model (DWBM) based on the Budyko framework. The parameters a1 of DWBM are introduced as hydrologic cycle indicators. An indicator estimation regression model was developed using watershed characteristics data for the introduced indicator, and an assessment system was prepared through K-means cluster analysis. The hydrological cycle assessment system developed in this study can assess the hydrological cycle with simple data such as land use, CN, and watershed slope, so it can quickly assess changes in hydrological cycle factors in the past and present. Because of this advantage is expected that the developed assessment system can predict changes in the hydrological cycle and use an auxiliary tool for policymaking.

THE CHEONGGYE-CHEON ESTORATION PROJECT AND HYDROLOGICAL CYCLE ANALYSIS

  • Kim, Hyeon-Jun;Yoon, Soo-Kil;Noh, Seong-Jin;Jang, Cheol-Hee
    • Water Engineering Research
    • /
    • v.6 no.4
    • /
    • pp.179-187
    • /
    • 2005
  • This paper introduces the Cheonggye-cheon restoration project. The restoration project aims to revive the 600-year-old city of Seoul by recovering the historical heritage, guaranteeing safety from the deteriorated covering structures, creating the environment-friendly space, and revitalizing the neglected city centers. In order to understand the current hydrological cycle of the Chenggye-cheon watershed, the annual water balance of the region was calculated using the observed data including precipitation, runoff, water supply and sewage, and the changes in the groundwater level. The $2001{\sim}2002$ data were used to calibrate the WEP, and the $2003{\sim}2004$ data were used to verify the WEP. The calibration and validation results for the flood hydrograph how a reasonable value (at Majanggyo station, the R2 for the calibration period was 0.9, and that for the validation period was 0.7). According to the annual water balance of the Cheonggye-cheon watershed for 2004, the amount of surface runoff, infiltration, and evapotranspiration was 1,097mm, 216mm and 382mm, respectively, for an annual precipitation of 1,499mm. The application results from WEP, a distributed hydrological model, provide more detailed information of the watershed, and the model will be useful for improving the hydrological cycle in urban watershed.

  • PDF

Incremental extended finite element method for thermal cracking of mass concrete at early ages

  • Zhu, Zhenyang;Zhang, Guoxin;Liu, Yi;Wang, Zhenhong
    • Structural Engineering and Mechanics
    • /
    • v.69 no.1
    • /
    • pp.33-42
    • /
    • 2019
  • Thermal cracks are cracks that commonly form at early ages in mass concrete. During the concrete pouring process, the elastic modulus changes continuously. This requires the time domain to be divided into several steps in order to solve for the temperature, stress, and displacement of the concrete. Numerical simulations of thermal crack propagation in concrete are more difficult at early ages. To solve this problem, this study divides crack propagation in concrete at early ages into two cases: the case in which cracks do not propagate but the elastic modulus of the concrete changes and the case in which cracks propagate at a certain time. This paper provides computational models for these two cases by integrating the characteristics of the extended finite element algorithm, compiles the corresponding computational programs, and verifies the accuracy of the proposed model using numerical comparisons. The model presented in this paper has the advantages of high computational accuracy and stable results in resolving thermal cracking and its propagation in concrete at early ages.

Study on the Rankine Cycle using Ammonia-Water Mixture as Working Fluid for Use of Low-Temperature Waste Heat (저온폐열 활용을 위한 암모니아-물 혼합물을 작업유체로 하는 랭킨사이클에 관한 연구)

  • Kim, Kyoung-Hoon;Kim, Se-Woong;Ko, Hyung-Jong
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.21 no.6
    • /
    • pp.570-579
    • /
    • 2010
  • Since the temperature of waste heat source is relatively low, it is difficult to maintain high level of efficiency in power generation when the waste heat recovery is employed in the system. In an effort to improve the thermal efficiency and power output, use of ammonia-water mixture as a working fluid in the power cycle becomes a viable option. In this work, the performance of ammonia-water mixture based Rankine cycle is thoroughly investigated in order to maximize the power generation from the low temperature waste heat. In analyzing the power cycle, several key system parameters such as mass fraction of ammonia in the mixture and turbine inlet pressure are studied to examine their effects on the system performance. The results of the cycle analysis find a substantial increase both in power output and thermal efficiency if the fraction of ammonia increases in the working fluid.

Hydrologic Cycle Simulation of Urban River for Rehabilitation of Water Environment (II) - Dorimcheon Basin - (물 환경 건전화를 위한 도시하천의 물 순환 모의 (II) - 도림천 유역 -)

  • Lee, Sang-Ho;Lee, Jung-Min
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.5
    • /
    • pp.815-823
    • /
    • 2006
  • The hydrologic cycle in urban catchment has been changed due to the expansion of impervious area by rapid urban development. In this study, the SWMM 5 (Storm Water Management Model 5) model was used to simulate the hydrologic cycle of the Dorimcheon catchment which suffers from the distorted hydrologic cycle as a typical urban catchment. This study compare continuous simulation of urban runoff combining the channel and sewer system with that of channel only in the Dorimcheon catchment. Continuous simulations of urban runoff were performed for the upstream basin of Dorim bridge. The urban impervious regions were processed by the land use analysis from LANDSAT_TM images. It was performed from 1975 to 2000 for every five years. Surface, groundwater and wastewater runoffs were additionally included in the simulations one at a time. Such simulations made it possible to evaluate those components quantitatively. The result of continuous simulation of urban runoff combining the channel and sewer system is that peak flow and recession are well simulated. The analysis results of urbanization effect on runoff are as follows: the surface runoff in 2000 increases to 64% of the whole precipitation whereas the surface runoff in 1975 amounts to 46% of the precipitation; the groundwater runoff in 2000 amounts to 6% and shows 8% decrease during the period from 1975 to 2000.

Water Cycle Simulation for the Dorimcheon Catchment Using WEP Model (WEP 모형을 이용한 도림천 유역 물순환 모의)

  • Lee, Seung-Jong;Kim, Young-Oh;Lee, Sang-Ho;Lee, Kil-Seong
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.6 s.155
    • /
    • pp.449-460
    • /
    • 2005
  • In this study, a WEP (Water and Energy transfer Processes) model was used to simulate the water cycle of the Dorimcheon catchment which suffers from the distorted water cycle as a typical urban catchment. Two different land uses in the past (i.e. 1975) and at present (i.e. 2000) were incorporated into the simulation to investigate the runoff characteristics resulting from the increase of the impervious ratio due to urbanization. The simulation results show that the concentration time is decreased and the peak discharge and the total runoff are increased by urbanization while the infiltration and baseflow are reduced. In addition, the effects of infiltration trenches and permeable pavements were also simulated to search for alternatives that can restore the distorted water cycle. The simulation results prove that the installation of both alternatives can restore the runoff characteristics to that prior to urbanization.

evaluation of Performance Characteristic on Triple Effect Absorption Cycle (삼중효용 흡수사이클의 성능특성 평가)

  • 권오경
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.22 no.6
    • /
    • pp.782-791
    • /
    • 1998
  • This paper presents a computer simulation of five types of triple effect absorption cycles employ-ing the refrigerant absorbent combinations of NH3/LiNO3 low-pressure type NH3/LiNO3+H2O/LiBr binary two-stage type series flow cycle and two types of parallel flow cycle for H2O/LiBr. The absorption systems is investigated through cycle simulation to obtain the system characteristics with the cooling water inlet temperature approach temperature of absorber loss temperature of absorber and chilled water outlet temperature. The most important characteristic temperature of absorber and chilled water outlet temperature. The most important characteristic of NH3/LiNO3 low-pressure type and a NH3/LINO3+H2O/LiBr binary two-stage type is that it obtains a coefficient of performance higher than the sum of the performance coefficients of its part operating independently. As a result of this analysis the optimum designs and operating conditions were determined based on the operating conditions and the coefficient of performance.

  • PDF

Verification Model of the Feedwater Flow for the Calculation of Corrective Performance of Turbine Cycle (터빈 사이클의 보정 성능 계산을 위한 급수 유량의 검증 모델)

  • Kim, Seong-Kun;Yang, Hac-Jin;Lee, Kang-Hee;Choi, Kwang-Hee
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.6
    • /
    • pp.538-544
    • /
    • 2012
  • Analysis of thermal performance is required for the economic operation of turbine cycle of power plant. We developed corrective model of main feed water flow which is the most important parameter for the precise analysis of turbine cycle performance. Classification model for the identification of feed water flow measurement status was applied to increase the suitability of the corrective model. We used neural network and support vector machine to develop estimation model of main feed water flow with more generalization capability. The estimation model can be used practically to evaluate corrective performance of turbine cycle plant.

A Study of the Influence of Condensing Water Temperature on Low Temperature Geothermal Power Generation (응축수온도가 저온지열발전 성능에 미치는 영향 연구)

  • Kim, Jin-Sang;Lee, Chung-Kook
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.3 no.2
    • /
    • pp.17-23
    • /
    • 2007
  • Geothermal energy is used in various forms, such as power generation, direct use, and geothermal heat pumps. High temperature geothermal energy sources have been used for power generation for more than a century. Recent technical advances in power generation equipments make relatively low temperature geothermal energy to be available for power generation. In these applications, lower temperature geothermal energy source makes smaller difference between condensing water temperature and it. Various condensing water temperatures were investigated in analyzing its influence on power generation performance. Condensing water temperature of organic Rankine cycle imposed greater influence on power generation and its performance in lower temperature geothermal power generation.

  • PDF