• Title/Summary/Keyword: Water Treatment Plant Operator

Search Result 12, Processing Time 0.024 seconds

Job Analysis for the Development of Curriculum for Education and Training and Guidelines for Making Questions in Examinations of Water Treatment Plant Operator (정수장운영관리사 직무분석에 관한 연구)

  • Koo, Ja Kon;Park, Jong Sung;Oh, hyun Je;Choi, Suing Il;Hur, Bang Ryun;Wi, Mi-Kyung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.3
    • /
    • pp.377-388
    • /
    • 2006
  • This paper is aimed to design for qualification structure and developing Vocational Education and Training Program of Water Treatment Plant Operator. Also job analysis was performed by the experts of education and related field though Developing A Curriculum(DACUM). The qualification structure and developing Vocational Education and Training Program of Water Treatment Plant Operator was designed and policy suggestions are made for the substantiality and activity to the government. This study is performed expert interview and job analysis The results are presented the summaries of job definitions, job models, areas of vocation activities, curriculum for education and training and guidelines for making questions in examinations.

Automatic Control of Coagulant Dosing Rate Using Self-Organizing Fuzzy Neural Network (자기조직형 Fuzzy Neural Network에 의한 응집제 투입률 자동제어)

  • 오석영;변두균
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.11
    • /
    • pp.1100-1106
    • /
    • 2004
  • In this report, a self-organizing fuzzy neural network is proposed to control chemical feeding, which is one of the most important problems in water treatment process. In the case of the learning according to raw water quality, the self-organizing fuzzy network, which can be driven by plant operator, is very effective, Simulation results of the proposed method using the data of water treatment plant show good performance. This algorithm is included to chemical feeder, which is composed of PLC, magnetic flow-meter and control valve, so the intelligent control of chemical feeding is realized.

Development of Datamining Roadmap and Its Application to Water Treatment Plant for Coagulant Control (데이터마이닝 로드맵 개발과 수처리 응집제 제어를 위한 데이터마이닝 적용)

  • Bae, Hyeon;Kim, Sung-Shin;Kim, Ye-Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.9 no.7
    • /
    • pp.1582-1587
    • /
    • 2005
  • In coagulant control of water treatment plants, rule extraction, one of datamining categories, was performed for coagulant control of a water treatment plant. Clustering methods were applied to extract control rules from data. These control rules can be used for fully automation of water treatment plants instead of operator's knowledge for plant control. To perform fuzzy clustering, there are some coefficients to be determined and these kinds of studies have been performed over decades such as clustering indices. In this study, statistical indices were taken to calculate the number of clusters. Simultaneously, seed points were found out based on hierarchical clustering. These statistical approaches give information about features of clusters, so it can reduce computing cost and increase accuracy of clustering. The proposed algorithm can play an important role in datamining and knowledge discovery.

Models for drinking water treatment processes

  • Jusic, Suvada;Milasinovic, Zoran;Milisic, Hata;Hadzic, Emina
    • Coupled systems mechanics
    • /
    • v.8 no.6
    • /
    • pp.489-500
    • /
    • 2019
  • With drinking water standards becoming more rigorous and increasing demands for additional water quantities, while water resources are becoming more polluted, mathematical models became an important tool to improve water treatment processes performance in the water supply system. Water treatment processes models reflect the knowledge of the processes and they are useful tools for water treatment process optimization, design, operator training for decision making and fundamental research. Unfortunately, in the current practice of drinking-water production and distribution, water treatment processes modeling is not successfully applied. This article presents a review of some existing water treatment processes simulators and the experience of their application and indicating the main weak points of each process. Also, new approaches in the modeling of water treatment are presented and recommendations are given for the work in the future.

State of Swerage Systems and Prospects in Korea (우리 나라의 하수도현황과 전망)

  • 김갑수
    • Journal of environmental and Sanitary engineering
    • /
    • v.8 no.2
    • /
    • pp.65-84
    • /
    • 1993
  • This study reviewed the current status and problems of sewerage system in Korea and then proposed possible methods to correct the problems. Also, evaluation of future development in sewerage system is included. It can be summarized as follows : 1. Investment in sewerage system is relatively low . 0.23% of GNP, Considering that the investment portion is 0.35% in OECD and 0.63% in Japan, it should be increased further. 2. The reasons wily the investment in sewerage system is low can be ' (1) Low priority is given to the investment in sewerage system. Local government builds and operates its own wastewater treatment plant. Local government as well as residents prefer to invest their money in roadwork, housing and parks to in wastewater treatment facilities because of greater investment effects. (2) Besides capital investment, more maintenance cost is needed for sewerage system. Proper operation of wastewater treatment facilities requires a well-trained operator. Because of public conception that operation of wastewater treatment facility is a dirty job, it is difficult to find a well-trained operator. (3) It is difficult to estimate the effect of sewerage system (4) Cost required to build and maintain wastewater treatment facility should be paid by people, who benefit from the facility. People to benefit are sometimes different from people to pay. 3. Advanced treatment is necessary to protect the bay aura and raw water source as well as to prevent eutrophication of lakes and ponds. 4. Wastewater treatment facility were mainly build in big cities during the decade of 1980. Followings should be solved first to expand the facilities. (1) Rapid repair and construction of sewer. (2) Technical development of wastewater treatment . Prevention of efficient and economical wastewater . Development of efficient and economical wastewater treatment techniques . Development of high-efficiency treatment using bioreactor . Reuse of wastewater treatment plant effluent (3) Sludge treatment and disposal . Composting of sludge cakes . Development of techniques to reduce the volume of sludge cake : incineration and reuse of sludge ash and slag. (4) Utilization of wastewater treatment facilities . Construction of community parks or sports families(ie, on the tops of the covered aeration tanks and sedimention tanks) Construction of wastewater treatment facilities under ground and of parking facilities and community parks above ground. (5) Education of wastewater treatment personal.

  • PDF

Intelligent Controller for Optimal Coagulant Dosage Rate in Water Treatment Process (정수장 약품 최적 주입률 결정을 위한 지능형 제어기 개발)

  • Lee, Ho-Hyun;Shin, Gang-Wook;Hong, Sung-Taek;Chun, Myung-Geun
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.25 no.4
    • /
    • pp.369-376
    • /
    • 2015
  • Chemicals are injected in order to remove a variety of organic substances contained in the water purification plant influent. It can be determined with measuring sedimentation turbidity 4~7 hours later, whether the chemical dosage rate is proper or not, which make the real-time feedback control impossible. In addition, manual operation in accordance with the Jar-Test carried out in the laboratory and the operator's experience may cause the experimental and human error by the changes of organic characteristics and water quality. Especially at night ad weekend, the rate have been determined only by the operator judgment owing to environment engineer's absence. Therefore, the decision of optimal chemical dosage rate using proposed intelligent control algorithm is expected to result in real-time injection and cost reduction.

Design Optimization of an Ozone Contactor Using Ozone Contactor Model (OCM) Software

  • Kim, Doo-Il;Lee, Chae-Young;Joe, Woo-Hyeun;Lee, Seock-Heon
    • Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.244-249
    • /
    • 2009
  • Designing an ozone contactor is complicated because the residual ozone, log C. parvum inactivation, and bromate formation should be optimized with fluctuating water quality. OCM software was developed to assist a plant designer or an operator to fulfill the sophisticated optimization required in the design or operation of a new or an existing plant. In this article, numerical simulations were carried out using the OCM software for the design of a new ozone contactor under diverse design factors (i.e., three pHs, three temperatures, low and high dispersion numbers, and four and ten cells with complete mixing) with kinetic parameters obtained from the sand-filter effluent of a water treatment plant treating water from the Paldang impoundment. The results of the simulation suggested that a high residual ozone concentration at low pH and low temperature would be challenging, and PFR-like hydrodynamics could lower the residual ozone concentration. The inactivation of C. parvum oocysts increased at a lower pH. A lower dispersion number and more cell division increased the inactivation efficiency. Bromate was instantaneously formed during the initial ozonation stage. The effluent concentration was much lower than the regulatory levels imposed by the USEPA because of the low bromide level in raw water.

Application of the Proper Air Supply Amount Based on the Influent Water Quality for the Development of Efficient Blower Control Logic in Sewage Treatment Plants (하수처리장의 효율적인 Blower Control Logic 개발을 위한 유입수질 기반 공기공급량 적용 연구)

  • Yeo, Wooseok;Kim, Jong Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.493-499
    • /
    • 2022
  • The standards pertaining to the quality of discharged water in sewage treatment plants are strengthening, and accordingly, facilities in sewage treatment plants are being upgraded. In addition, the discharge water quality of sewage treatment plants must be maintained at a high level, and efficient sewage treatment plant operations have thus emerged as a very important issue. For the efficient operation of sewage treatment plants, this study applied a basic blowing amount calculation method based on sewage facilities to evaluate the required oxygen amount and blowing amount according to inflow water quality by logicizing various influencing factors. As a result of calculating the amount of air blown by applying actual April water quality data from sewage treatment plant A to the blower demand calculation developed through this study, it was found that the average amount of air blown was reduced by about 12%. When the blower demand calculation developed here is applied to an actual sewage treatment plant, the amount of air blown can be controlled based on the inflow water quality. This can facilitate the realization of an autonomous control of sewage treatment plants, in contrast to the existing sewage treatment operation method that relies on operational experience of operator. In addition, it is expected that efficient sewage treatment plants can be operated by reducing blowing amounts and power costs, which will contribute to both energy and carbon savings.

Performance Characteristics and Improvement Suggestion of Individual Sewage Treatment in Kyangan Watershed (경안천 유역 소규모 오수처리시설의 처리특성 및 효율개선방안)

  • Jang, Young-ho;Kim, Keug Tae;Jahng, Deok-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.5
    • /
    • pp.816-821
    • /
    • 2010
  • It has been achieved 109.1 kg/d of BOD reduction that is equivalent to the amount of BOD loading discharged from 21,880 persons and dramatic decrease of the fallout ratio against water quality of effluent, from 42% to 9%, through technical support on ISTPs to be applied by the ISMSGA at the upper area of Geongan river in Yong-In city. It was clearly revealed that the most efficient configuration for ISTP was a series of anaerobic tank, equalization basin, aerobic tank, sedimentation tank, and then effluent tank. Also, the major causes on the fallout ratio of ISTP resulted in the lack of management (67.5%) and imperfect facilities (32.5%). Then, when compared the quantity of water supply with the design capacity of ISTP, the design capacity was estimated as 1.8 or 2.4 folds larger than the real quantity of water supply so that it is essential to punctually consider the key factors such as an estimation methods, the specificity of commission operator and construction by high systematic technologies to improve the water quality for the future.

A study on the priorities through weight analysis for each index of performance evaluation of public sewage operation agency (공공하수도 관리대행 성과평가 지표별 가중치분석을 통한 우선순위에 대한 연구)

  • Wi, Mikyung;Park, Chulhwi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.6
    • /
    • pp.495-502
    • /
    • 2020
  • The 37 indicators for performance evaluation of public sewage management agencies are divided into four major categories (agency manpower management ability, wastewater treatment plant operation and management, sludge and water reuse, service quality) in the first stage, and the necessity and score acquisition for the detailed indicators by each major category in the second stages. Priority was investigated through the Analytic Hierarchy Process (AHP) analysis technique for ease and relevance of company efforts. Also, based on the results of this analysis, integrated type weighting and relative importance were analyzed. As a result of the analysis, the weight and relative importance of the first stage classification were in the order of wastewater treatment plant operation and maintenance, operation agency manpower management ability, sludge and water reuse, and service quality. As a result of analyzing the weights and priorities of the detailed performance indicators in the second stage, it was found that operator's career years, the percentage of certification holding rate in operators, compliance with the effluent water quality standards, training times for operators, and efforts to manage hazardous chemicals were important. Some of the indicators of operation agency performance evaluation may include indicators in which the performance of the company's efforts is underestimated or overestimated. In order to improve this, it is necessary to give weights in consideration of the necessity of the indicator, the relevance of the company's efforts, and the ease of obtaining scores.