• Title/Summary/Keyword: Water Resources Plan

Search Result 547, Processing Time 0.032 seconds

hydraulic-power generation of electricity plan of multi-Purpose dam in electric Power system (전력계통에서의 다목적댐 수력발전계획)

  • Kim, Seung-Hyo;Ko, Young-Hoan;Hwang, In-Kwang
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1248-1252
    • /
    • 1999
  • To provide electricity power of good quality, it is essential to establish generation of electricity plan in electric power system based on accurate power-demand prediction and cope with changes of power-need fluctuating constantly. The role of hydraulic-power generation of electricity in electric power system is of importance because responding to electric power-demand counts or reservoir-type hydraulic-power generation of electricity which is designed for additional load in electric power system. So hydraulic-power generation of electricity must have fast start reserve. But the amount of water, resources of reservoir-type hydraulic-power generation of electricity is restricted and multi-used, so the scheduling of management by exact forecasting the amount of water is critical. That is why efficient hydraulic-power generation of electricity makes a main role on pumping up the utility of energy and water resource. This thesis introduced the example of optimal generation of electricity plan establishment which is used in managing reservoir-type hydraulic-power generation of electricity.

  • PDF

The Influence on the Runoff Characteristics by the Land Use in Small Watersheds (소유역의 토지이용이 유출 특성에 미치는 영향)

  • Choi, Ye-Hwan;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.204-208
    • /
    • 2004
  • In the forthcoming 21C, the barometer of cultural lives depends on that the water demand will increase or not. On the opposite site of that, the small watersheds will influence directly on how to cover the surface of watersheds with land use, no planning developing watersheds, and the rearrangement of small rivers. Espacially as the exordinary climatic phenomena, water resources and water content of the small watersheds will be confused oil exactly not to make a plan of water resources. This study area has four small watersheds groups in Gangwon-Do Province, that is, group I five small river watersheds including Changchoncheon etc., group II fiver rivers watersheds including to Hwalsanmogicheon etc., group III five small river watersheds including Singicheon etc., group IV including to Sabulanggolcheon etc. According to the land use such as dry field(or farm), ice field, forest land, building lot arid others, in small watersheds, the amount of runoff will be impacted by precipitation. The comparison between the runoff was getting from Kajiyama Formular and calculated runoff from multi-linear regressed equations by land use percentage was performed. Its correlation which was estimated by coefficient of correlation will be accepted or not, as approched 1.00000 values. As the monthly water resources amount is estimated by multi-linear regressed equations, we make a plan to demand and supply the water quantity from small river watersheds during any return periods.

  • PDF

To examine the construction plan of the lightening rod equipment for the intake tower of D-dam (D댐의 취수탑 피뢰설비 구축방안 검토)

  • Hong, Sung-Taek;Lee, Eun-Chun;Shin, Gang-Wook;Lee, Nam-Young
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.290-292
    • /
    • 2003
  • The intake tower of D-dam located in a mountainous area positioned in the left side of the dam and its structure installed alone on the water surface then, can become target of direct lightening. To protect the intake tower from the direct lightening and indirect-lightening, lightening rod installed in the top area of the intake tower and ground pole laid under the surrounding ground. however, because the surrounding ground almost consists of a rock, it is very difficult to obtain the grounding resistance. It is main object to examine the construction plan of the optimum lightening rod equipment and ground pole with measuring the earth specific resistance of the around of the intake tower which is the scheduled area to lay the ground pole with the Wenner's 4-electric pole method and the Schlumberger's method. and using the analysis tool, ESII.

  • PDF

Evaluation of Water Productivity of Thailand and Improvement Measure Proposals

  • Suthidhummajit, Chokchai;Koontanakulvong, Sucharit
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.176-176
    • /
    • 2019
  • Thailand had issued a national strategic development master plan with issues related to water resources and water security in the entire water management. Water resources are an important factor of living and development of the country's socio-economy to be stable, prosperous and sustainable. Therefore, water management in both multidimensional and multi-sectoral systems is important and will supports socio-economic and environmental development. The direction of national development in accordance with the national strategic framework for 20 years that requires the country to level up security level in terms of water, energy and food. To response to the proposed goals, there is a subplan to increase water productivity of the entire water system for economical development use by evaluating use value and to create more value added from water use to meet international standard level. This study aims to evaluate the water productivity of Thailand in each basin and all sectors such as agricultural sector, service and industrial sectors by using the water use data from water account analysis and GDP data from NESDB during the past 10 years (1996-2015). The comparison of water productivity with other countries will also be conducted and in addition, the measures to improve water productivity in next 20 years will be explored to response to the National Strategic Master Plan goals. Water productivity is defined as output per unit of water depleted. The simplest way to compare water productivity across different enterprises is in monetary terms. World Bank presents water productivity as an indication of the efficiency by which each country uses its water resources. There are two data sets used for water productivity analyses, i.e., the first is water use data at end users and the second is Gross Domestic Product. The water use at end users are estimated by water account method based on the System of Environmental-Economic Accounting for Water (SEEA-Water) concept of United Nations. The water account shows the analyses of the water balance between the use and supply of each water resource in physical terms. The water supply and use linkage in the water account analyses separated into each phases, i.e., water sources, water managers, water service providers, water user at end user under water regulators of all kinds of water use activities such as household, industrial, agricultural, tourism, hydropower, and ecological conservation uses. The Gross Domestic Product (GDP), a well- known measuring method of the national economic growth is not actually a comprehensive approach to describe all aspects of national economic status, since GDP does not take into account the costs of the negative impacts to natural resources that result from the overexploitation of development projects, however, at present, integrating the environment with the economy of a country to measure its economic growth with GDP is acceptable worldwide. The study results will show the water use at each basin, use types at end users, water productivity in each sector from 1996-2015 compared with other countries, Besides the productivity improvement measures will be explored and proposed for the National Strategic Master Plan.

  • PDF

A Study on the Watershed Analysis of the Expected Flood Inundation Area in South Han River (남한강 유역의 침수예상지역에 대한 홍수범람분석에 관한 연구)

  • HONG, Sung-Soo;JUNG, Da-Som;HWANG, Eui-Ho;CHAE, Hyo-Suk
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.19 no.1
    • /
    • pp.106-119
    • /
    • 2016
  • Flood risk map, flood damage map, disaster information map, inundation trace map are involved with the cartographic analysis of flood inundation based on prevention, preparation, restoration, response from natural disasters such as flood, flooding, etc. In this study, the analysis for channel and basin characteristics Chungju dam to Paldang dam of South han river after four river project. Flood scenario is selected to take advantage of design flood level of schematic design for river. Flood inundation of one dimensional non-uniform flow by using HEC-RAS with basin characteristics is accomplished and two dimensional unsteady flow was interpreted by using FLUMEN. Frequency analysis is carried out about each abundance of South han river for 100 year period, 200 year period and 500 year period. Flooding disaster area of 100 year period on 0.5m damage functions is 2378.8ha, 200 year period on 0.5m damage functions is 3155.2ha, 500 year period on 0.5m damage functions is 3995.3ha respectively. It will be significant data for decision making to establish inundation trace map for providing basic plan for river maintenance, land use plan, flood protection plan, application plan and getting information of flood expectation area.

Hydrological aspects of a non-managed artificial forest watershed of Chamaecyparis obtuse Endl.

  • Otsuki, Kyoichi;Higashi, Tomohiro;Ide, Junichiro;Sato, Nobuhiro;Kume, Atsushi;Ogawa, Shigeru
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2003.05a
    • /
    • pp.81-88
    • /
    • 2003
  • In this report, we first introduce the plan of the Japanese Council of University Experimental Forests to establish Long-Term Forest Hydrological Network, and propose the cooperation between Japan Society of Hydrology and Water Resources (JSHWR) and Korean Water Resources Association (KWRA) to fulfill the plan. Then we introduce our hydrological researches conducted in a non-managed artificial forest watershed of Kyushu University Forests in 2002. Though hydrological phenomena have not sufnciently investigated, we introduce the hydrological aspects obtained in 2002 to initiate cooperative researches on Forest Ecosystems with KWRA.

  • PDF

Study on Establishment of Master Plan flor Drought Management Information System (가뭄관리정보시스템 마스터플랜수립 연구)

  • Park Jin Hyeog;Koh Deuk Koo;Lee Geun Sang;Hwang Eui Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1481-1485
    • /
    • 2005
  • This study aims at establishing master plan for efficient establishment of comprehensive drought management information system as non-structural drought counterplan which provides drought damage in advance. Domestic and abroad research related to drought were surveyed and analyzed through many literature and internet for systematic drought management information system. Long-term master plan for comprehensive drought management information system is divided into 3 steps. In first step, drought monitoring system including development of hydrological drought assessment index, drought outlook analysis method and GIS web based drought monitering system is established. In second step, water supply plan and guideline through water shortage danger assessment by areal characteristics is established. In third step, comprehensive management information system through export system linked to KORSIM and establishment of information shared system between each bureau related to drought. Based on this study, master plan for efficient development and application of drought management information system is proposed, it is expected to be applied as guideline for second and third step of drought management information system.

  • PDF