Sapkyo Lake Watershed occupies about 19.3% of total area of Chungnam Province, and it is necessary to make a plan of counter-measure for the maintenance of public waterbody sound as well as to ensure water resources due to urbanization and industrialization in this area so densely populated and excessively developed. Conventionally water quality management has been enforced by concentration-based system which is not considered the carrying capacity of receptors, hence there are no proper measures for the prevention of an excessive pollutant load over a waterbody. So even though emission sources abide by the conventional permission regulation, then the quantity of wastewater is increased continuously and encountered water shortage to use finally. Therefore this research focused on the review of introduction of total water quality management system in Sapkyo Lake watershed to maintain public waterbody sound and to ensure water resources. By doing this research in introduction of the system in advance, it can contribute to establish the methodology on systematic water quality management. Also the application of this system in Sapkyo Lake watershed can promote the sustainable development of the area by harmonizing the environment and regional economy ultimately.
This study approach the conflict in the process of promoting Dam construction plan from a hydrological method and comprehend the cause of conflict on conservation and flood collect all interested parties direct involvement and develop Shared Vision Model (SVM) to plan simulation and result. We forecast water for living, industrial water and agricultural water in each administrative district on conservation and simulate promptly in case that each structural alternative is formed and suggest water level deduction effect and change of area on watted surface and damage and organize the system to draw and agreement through exchanging mutual opinion. Also, it considered to contribute meditation and soften of conflict by securing accuracy of releasing information and trust of the result.
Kim, Yeon-Bae;Heo, Eun-Nyeong;Kim, Tae-Yu;Kim, Wan-Gyu
Journal of Korea Water Resources Association
/
v.32
no.5
/
pp.537-545
/
1999
This study examines three counterplans for the improvement in price structure of Korean multi-regional water supply system. First, price differentiation between industrial and residential water uses is analyzed using several pricing methods. It has been estimated that the industrial water price by the Ramsey pricing method is needed to be two to two and half times higher than the price of residential water to achieve maximum social welfare. Second, peak-load pricing is then studied to seek for the effectiveness of seasonal differentiation in water price. It has been found that consideration of dam facilities and their functions is the key factor for the effectiveness of the seasonal differentiation in water price. Finally, the discussion about the introduction of contract pricing system to the multi regional water supply system to achieve optimal investment plan for the future water demand is presented. We has found that the introduction of contract pricing system will greatly increase the efficiency in future investment plan of the multi-regional water supply system.
Lee, Suk Ho;Lee, Dong Seop;Kim, Jin Man;Kim, Byung Sik
Journal of Korea Water Resources Association
/
v.49
no.7
/
pp.579-588
/
2016
Changes in precipitation due to climate change is made to induce the local and intensive rainfall, it is increasing damage caused by inland inundation. Therefore, it requires a technique for predicting damage caused by flooding. In this study, in order to determine whether this flood inundated by any route when the levee was destroyed, Which can simulate the path of the flood inundation model was developed for the SIMOD (Simplified Inundation MODel). Multi Direction Method (MDM) for differential distributing the adjacent cells by using the slope and Flat-Water Assumption (FWA)-If more than one level higher in the cell adjacent to the cell level is the lowest altitude that increases the water level is equal to the adjacent cells- were applied For the evaluation of the model by setting the flooding scenarios were estimated hourly range from the target area. SIMOD model can significantly reduce simulation time because they use a simple input data of topography (DEM) and inflow flood. Since it is possible to predict results within minutes, if you can only identify inflow flood through the runoff model or levee collapse model. Therefore, it could be used to establish an evacuation plan due to flooding, such as EAP (Emergency Action Plan).
We developed the assessment method for weekly groundwater resources management vulnerability. To consider the effect of precipitation on groundwater level, we calculated correlation coefficient between groundwater level and precipitation applying critical infiltration concept. We developed the vulnerability assessment criteria and calculated weights for criteria using the entropy method. Weekly groundwater resources management vulnerability of small administrative districts were estimated using developed method in this research. The developed method can be a basis for the establishment of the spatio-temporal groundwater resources management plan.
Our country is making efforts to manage water resources efficiently. In the future, It is necessary to develop a plan after subdividing the basin considering regional problems and water use, topographical and climatic characteristics. This study constructed water supply and demand system based on the standard watershed unit for water shortage evaluation considering spatial resolution. In addition, water shortage were calculated and compared using the MODSIM model in the Han-river basin. As a result, the average water shortage occurring during the 49 years (1967-2015) was 129.98 million $m^3$ for the middle watershed unit and 222.24 million $m^3$ for the standard watershed unit, resulting in a difference of about 2.1 billion m3. However, the trends and distribution of water shortage occurrence were very similar. The reason for this is that, in the case of the Middle watershed unit analysis, water shortages are calculated for the demand for living, industrial, and agricultural water for the representative natural flow value, assuming that all the water can be used in basin. The standard basin unit analysis showed that the difference between the fractionated supply and demand resulted in a large water shortage due to the relatively small amount of available water, and that the main stream did not show water shortage due to the ripple effect of the return flow. If the actual water use system is considered in the model as well as the subdivision of the spatial unit, it will be possible to evaluate the water supply and demand reflecting the regional characteristics.
Concerning the water quality management plan about Buk-stream, Ohsip-stream and Gagok-stream water systems in this research, which objectives of abstract is as follows. The result of cleanness degree evaluation of water quality in this research, the first grade was 91% shared in Buk-stream water system. The most point of the middle and upper stream of Buk-stream was maintain extremely clean water quality. Among the researched water system, the first grade of water quality in Ohsip-stream water system was most poor, its first garde rate was 68%. In all water quality check point of Gagog-stream water system was accomplished extremely clean water quality condition of first grade of BOD. The calculation result of pollutant loading density, which were 8.2, 21.5, 4.0kg/day.$\textrm{km}^2$. respectively and basin of Buk-stream and Gagok-Stream have high development potentiality.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1313-1317
/
2006
In this study, various hydraulic phenomena were analyzed from the dam model experiments and the analyzed results were compared with existing computation results. Sungduk dam model structures were constructed using Froude similarity law by 1:50 scale. From the measurements of hydraulic phenomena at spillway channel, an improvement method was trying to be suggested over shortcoming of existing design plan. The result of model experiment showed no big difference with that of each part's numerical interpretation. Sidewall overflows were observed, as water conveyance occurred due to the linear characteristics of spillways, which raised the necessity for improving the linear forms of spillways. Also, it was judged to be necessary improving load pressure and establishing protective structures at the riverbed grounds of downstream channels.
The thesis of this analytical study includes 1) the generation of annual and monthly discharge regarding single hydrological variable at single site, 2)comparsion with the historical records and the generation, and 3) changing the monthly generatied discharge into annual. The conclusion of this will be used for the future plan for water resources development. Annual discharges at waegwan are characterized by log-normal distirbution and persistence-absent. Also, the random number generator causes the errors in the generation of annual discharge. The serial correlation coefficients of the generated annual discharge have less value than that of historical records, while the correlation coefficient and slope in January have(+) value and opposite to historical record. To change the monthly generated discharge into annual is not proper.
Water disasters such as flash floods and inundation caused by localized heavy rainfall in urban areas have a large impact on climate change but are also closely related to the increase in impervious areas as pointed out in domestic and international studies. It is difficult to secure natural green areas in urban areas that have already been developed. So, urban regeneration can be expected using water management optimized with technologies to secure infiltration and storage capacity such as Low-Impact Development technology. In this study, the water cycle improvement ability was confirmed by applying the LID technology within the district unit plan of the environmentally friendly village, and the economic feasibility of LID application was analyzed by estimating the costs and benefits of installing the facilities. The site was planned to conserve sufficient green and plans for securing the watershed infiltration and storage capacity were formulated with the application of additional LID technology, such as infiltration trenches, rain barrels and permeable pavements. The LID design method applicable to the site was established, and the water balance of the watershed was analyzed through simulations of the SWMM model. The water circulation improvement effect was confirmed through the water balance analysis, and the cost-benefits were determined according to the estimation method, and the economic analysis was conducted. This study confirms that the investment of LID technology is economically feasible for the hydrological improvement effect of the housing complex.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.