Park, Dasomi;Hyun, Sung Pil;Ha, Kyoochul;Moon, Hee Sun
Journal of Soil and Groundwater Environment
/
v.25
no.3
/
pp.12-22
/
2020
Managed aquifer recharge (MAR) is a promising water management strategy for securing stable water resources to overcome water shortage and water quality deterioration caused by global environmental changes. A MAR demonstration site was selected at Imgok-ri, Sangju-si, Korea, based on screening for the frequency of drought events and local water supply situations. The abundant groundwater discharging from a nearby abandoned coal mine is one of the potential recharge water sources for the MAR implementation. However, it has elevated levels of arsenic (~12 ㎍/L). In this study, the potential of the natural attenuation of arsenic by the field geological media was investigated using batch and column experiments. The adsorption and desorption parameters were obtained for two drill core samples (GM1; 21.8~22.8 m and GM2; 26.0~27.8 m depth) recovered from the potentially water-conducting fracture-zones in the injection well. The effluent arsenic concentrations were monitored during the continuous flow of the mine drainage water through the columns packed with the core samples. GM2 removed about 60% of arsenic in the influent (0.1 mg-As/L) while GM1 removed about 20%. The results suggest that natural attenuation is an acitive process occurring during the MAR operation, potentially lowering the arsenic level in the mine drainage water below the regulatory standard for drinking water. This study hence demonstrates that using the mine drainage water as the recharge water source is a viable option at the MAR demonstration site.
This paper describes the development of a decision support system (DSS) for the real time reservoir operation that aims to maximize the flood control effect. In the decision support system, model base and real time data processing subsystem are included along with the graphical user interface(GUI) that is able to visualize the forecasted runoff hydrographs at the flood control points and reservoir water levels resulting from the model run as well as the current hydrologic status. The system was verified through the pseudo real time applications to the Taechong reservoir operation with the historical flood events of the Kum river basin occurred in July, 1987 and August, 1995, Decision making processes were performed using the developed system and the results were compared with the real operations at that time. The reservoir operation using the pseudo real time application of DSS were simulated by the flood runoff simulation model, that shows the reservoir operation by DSS were successful in flood control for the lower Kum River.
The EV ROM, a joint reservoir operation model for flood control that accounts for the downstream flow condition, has been introduced in the preceding article (Shin et al, 2000). A joint reservoir operation model computer program for the Geum river basin, developed by FORTRAN Power Station 4.0 using the EV ROM, is hereby presented. Three case studies of flood control by joint operation of the Yongdam and Daechung Multipurpose Dams in the Geum river basin revealed that the performance of the EV ROM was superior to the existing Rigid ROM and Technical ROM. This is because the EV ROM can account for the downstream flow condition as well as the upstream inflow and the reservoir water level. In order to apply for various floods events in the future, consistent improvement of the developed EV ROM and efforts for more accurate rainfall prediction are required.
For efficient turbid water withdrawal in the Imha reservoir, a selective withdrawal facility was recently installed and operated during summer season of year 2006. In this research, CE-QUAL-W2 model was utilized to assess the efficiency of the selective withdrawal facility, in comparison with the original surface withdrawal, on turbid water management. Model calibration was carried out using data observed at four automatic monitoring stations in the reservoir. It was found that the model appropriately simulated, with the RMSE less than 5.2 NTU, the observed vertical and horizontal distributions of water temperature and turbidity as well as the location of maximum turbid water at each monitoring station. The analysis results showed that selective withdrawal is more effective in removing high turbid water than surface withdrawal as selective withdrawal contributed to reducing $35Mm^3$ of high turbidity water (> 100 NTU) in the reservoir by increasing outflows of high turbid water. Therefore, effective management of turbid water in the reservoir can be achieved by changing locations of intake depending on turbid water distribution conditions. The results of this study will provide some basic information for establishing better operation strategies to cope with turbid water problems.
경북 군위군 고로면에 위치한 저수용량 48,000천톤의 군위 다목적댐에 설치된 소수력발전기에 대한 설치공사 중 수차 설계도면 해석오류에 의한 Guide Vane(이하 G/V로 함.) 과다개방으로 인한 설비고장 및 개선사례, 년 중 댐 수위 변동을 감안한 정격수위와 저수위 시의 수차효율 시험을 통한 댐 수위별 최적의 발전설비 운영방안을 검토하여 저탄소 녹색에너지원인 군위다목적댐 소수력의 발전수익 증대를 도모하였다.
This study aims at the effective estimation of water supply capacity of small scale reservoir and the proposal of the data which is necessary to establish the water resources management plan of down stream area of the reservoir in the future by comparison and examination about reservoir operation technique for the security of agricultural water in small scale reservoir. The result of flow calculation by Tank model is used for the input data as the inflow data which is needed for the analysis of water supply capacity. Stochastic method, simulation method, and optimization method are used to examine the water supply capacity, and water security amount is compared with each method. From the analyses of water supply capacities by each method, slightly different results are shown in spite of the effort to compare them equally using input data such as inflow data under equal conditions, and the comparison of water supply capacities by each method are as follows; linear planning method, simulation method, and transition probability matrix method in the order of amount from the largest. It is thought that the simulation method in which comparatively reasonable application of the inflow data is possible and is simulated in successive time series dam operation of the three methods used in this study thus, simulation model is proper to estimate the water supply capacity of agricultural small scale reservoir. And it is judged that the heightening of efficiency of water resources utilization according to the development of downstream area of dam may be possible using the upward readjusted water supply amount of $55.18{\tiems}10^6ton$ and $63.7{\times}10^6ton$ at 95% and 90% supply reliability respectively which are above the planning water supply amount of $50.0{\times}10^6$ton when the simulation method is introduced as the standard.
An optimization model of water intake planning is developed based on a linear programming (LP) for the intelligent water purification plant operation system. The proposed optimization model minimizes the water treatment costs of raw water purification by considering a time-delay of treatment process and hourly electricity tariff, which is subject to various operation constraints, such as water intake limit, storage tank capacity, and water demand forecasts. For demonstration, the developed model is applied to H water purification center. Here, we have tested three optimization strategies and the results are compared and analyzed in economic and safety aspects. The optimization model is expected to be used as a decision support tool for optimal water intake scheduling of domestic water purification centers.
This study considers a hydro power energy operation management and planning problem in KEPCO power systems for efficient use of hydro resources. A database is developed to provide with a convenience to hydro Power operation management and Planning by studying of the hydro resourse characteristics of Korea. The data is obtained in the operation history from 7 years ago and by considering the hydro facility planning to 2010 year. Also a computer program is developed to decide the monthly required volume of water and the water level of a dam in the Han river using the database.
Some phenomena occurred when one phase of the line circuit breaker was opened while a generator was operating to connect with the power grid were simulated by PSCAD/EMTDC and the analysis for the reason of operation and non-operation of protective relay will contribute to prevent spreading damage when same prospective faults occur.
Ji, Sukwang;Shin, Geumchae;Lee, Seungyub;Ahn, Kuk-Hyun
Journal of Korea Water Resources Association
/
v.56
no.8
/
pp.485-496
/
2023
Recently, South Korea has been making efforts to mitigate the risk of water scarcity during droughts by utilizing various drought response measures in dam operations. While various studies have been conducted on this topic, there is currently a lack of research on the economic effects of drought response measures. In this study, we evaluated the economic effects of drought response measures on nationwide multipurpose dams by using a long-term simulated inflow model based on ARIMA and Copula and a dam operation model that reflects drought response measures. The results showed that the expected benefits per unit flow rate were highest for coordinated operation and alternative water supply measures, at KRW 1,176 and KRW 1,139, respectively, while the benefits of emergency water supply utilization and water supply adjustment were estimated at KRW 956 and KRW 875, respectively. Additionally, when we examined the changes in the economic benefits of drought response measures based on the assumption of increased drought severity in the future, the changes in the drought risk resulting from reduced inflow increased the economic benefits of all drought response measures. The economic benefits of water supply adjustment increased by 2.6% compared to the baseline, while the economic benefits of coordinated operation and alternative water supply measures increased by 11.7% compared to the baseline. This suggests that dam-network-based measures, such as coordinated operation and alternative water supply measures, are crucial as drought risk increases. This study is expected to serve as a fundamental reference for selecting and utilizing drought response measures in the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.