• Title/Summary/Keyword: Warranty System

Search Result 126, Processing Time 0.019 seconds

A Study on Warranty and Quality Assurance Model for Guided Missiles Based on Storage Reliability (저장신뢰도 기반의 유도탄 품질보증모델에 대한 연구)

  • Jung, Sanghoon;Lee, Sangbok
    • Journal of Applied Reliability
    • /
    • v.17 no.2
    • /
    • pp.83-91
    • /
    • 2017
  • Purpose: The purpose of this study is to develop a quality assurance model and to determine appropriate warranty period for a guided missile using its field data. Methods: 10 years of actual firing data is collected from the defense industry company and military. Parametric maximum likelihood estimation for a reliability function is determined with the data. Results: The reliability function estimates average lifetime of the missile. That function shows a user requirement, 80% reliability (lifetime) is come up when 8 years have passed, which is longer than the estimates in the missile's development phase. Conclusion: Quality assurance warranty for a guided missile must be established with actual test data. It is necessary to update and modify the reliability prediction and the warranty period with actual field test data.

Item Replacement Policy with Minimal Repair in Stepdown Warranty Model

  • Jae Joong, Kim;Won Joong, Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.33
    • /
    • pp.87-92
    • /
    • 1995
  • This paper proposes age replacement policy in stepdown warranty policy. The replacement policy is considered in case of minimally repairable items. And renewal theory is used in analyzing warranty costs. The expected cost per unit time is presented in stepdown warranty policy, free replacement, prorata and hybrid policy. In this article it is assumed that item is replaced at the age of T but the any failure is minimally repaired before the age T. At this point the expected cost per unit time is shown in customer's view point. And numerical example is explored in weibull time-to-failure distribution.

  • PDF

A Study on the Application Scheme of the Warranty delivery system in Domestic Private Finance Initiative (국내 민간투자사업의 성능발주제도 도입에 관한 연구)

  • Kim, Dae-Kil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.527-530
    • /
    • 2007
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.

  • PDF

Maintenance Policy Based on Cost and Downtime Following the Expiration of Combination Warranty (혼합보증이 종료된 이후의 비용과 비가동시간에 근거한 보전정책)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.6
    • /
    • pp.909-923
    • /
    • 2008
  • This paper considers the replacement model and the preventive maintenance model following the expiration of combination warranty for a repairable system. If the system fails after the combination warranty is expired, then it is minimally repaired at each failure. The criterion used to determine the optimal replacement policy and the optimal preventive maintenance policy is the overall value function based on the expected cost rate per unit time and the expected downtime per unit time. The numerical examples are presented for illustrative purpose when the failure time follows a Weibull distribution.

Nonparametric Analysis of Warranty Data on Engine : Case Study (엔진에 대한 품질보증데이터의 비모수적 분석 사례연구)

  • Baik, Jai-Wook;Jo, Jin-Nam
    • Journal of Korean Society for Quality Management
    • /
    • v.34 no.1
    • /
    • pp.40-47
    • /
    • 2006
  • Claim history data of rather long period were collected to assess reliability and warranty cost analyses. The data were appropriately organized to be used for further statistical analyses. For each critical component, nonparametric statistical method was applied to obtain reliability plot. Hazard plots of the components in a subsystem or system level were also obtained. Competing risk model was assumed to obtain the performance of the subsystem or system level.

An Opportunity-based Age Replacement Policy with Warranty Analysed by Using TTT-Transforms

  • Iskandar, Bermawi P.;Klefsjo, Bengt;Sandoh, Hiroaki
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.27-38
    • /
    • 2000
  • In a recent paper Iskandar & Sandoh (1999) studied an opportunity-based age replacement policy for a system which has a warranty period (0,S]. When the system fails at age x $\leq$ S a minimal repair is performed. If an opportunity occurs to the system at age x, S $\leq$ x $\leq$ T, we take the opportunity with probability p to preventively replace the system, while we conduct a corrective .replacement when its fails in (S,T). Finally, if its age reaches T, we perform a preventive replacement, Under this policy the design variable is T. For the case when opportunities occur according to a homogeneous Poisson process, the long-run average cost of this policy was formulated and studied analytically by Iskandar & Sandoh (1999). The same problem is here analysed by using a graphical technique based on scaled TTT-transforms. This technique gives, among other things, excellent possibilities for different types of sensitivity analysis. We also extend the discussion to the situation when we have to estimate T based on times to failure.

  • PDF

PM Policy with Random Maintenance Quality Following the Expiration of Non-Renewing Warranty (비재생보증이 종료된 이후의 확률적 보전효과를 갖는 예방보전정책)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.1
    • /
    • pp.77-86
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policy following the expiration of non-renewing warranty. We assume that Wu and Clements-Croome's (2005) periodic PM model with random maintenance quality is utilized to maintain the system after the non-renewing warranty is expired. Given the cost structure to the user during the cycle of the product, we drive the expressions for the expected cost rate per unit time. Also, we obtain the optimal number and the optimal period by minimizing the expected cost rate per unit time. The numerical examples are presented for illustrative purpose.

Analysis on Regulation Revision Record to Term of Warranty Liability to Reinforced Concrete Work in Apartment Building (공동주택 철근콘크리트 공사의 하자담보책임기간 개정 이력 분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.268-269
    • /
    • 2017
  • Apartment building, which has been accompanied by economic growth in Korea, is a home of life and has the value overlapping as housing and assets. The improvement of consumer's eye level and development of related technology and related service development have positive function that enriches society and creates economic wealth. On the other hand, the clash and conflict between stakeholders increase social unrest and waste our competitiveness by economic loss. The term of warranty liability of apartment building is an important issue of defect lawsuits and is only a few quantitative standards. However, in this study, we examined the revision history of the law and ordinances for the reinforced concrete construction. As a result, establishing and revising the relevant standard, there is no definite basis system to support it. To improve this, the efforts to provide the standard for term of warranty liability and quantitative and objective basis to support it should be accompanied continuously.

  • PDF

Preventive maintenance model following the expiration of NFRRW (비재생무료교체-수리보증이 종료된 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.22 no.4
    • /
    • pp.775-784
    • /
    • 2011
  • In this paper, we consider the periodic preventive maintenance model for repairable system following the expiration of non-renewing free replacement-repair warranty (NFRRW). Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Developing the Optimized Method of Reliability-Growth Target Setting for Complex and Repairable Products from Business View

  • So, Young-Kug;Jeon, Young-Rok;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.15 no.4
    • /
    • pp.248-255
    • /
    • 2015
  • Purpose : The purpose of this research is to develop the optimized method and process in the reliability-growth target setting, especially for complex and repairable system (or products) such as vehicle and airplane, construction equipment. Method : A reliability-growth test plan specifies a scenario to achieve the planned reliability value (or reliability target). The major elements in test planning are reliability-growth starting time and reliability level at that time, reliability-growth rate and reliability-growth target. All of them except a reliability target can be referred to the previous development data and reference researches. The reliability target level is directly influencing to test period (or time) which is related to test and warranty cost together. There are a few researches about the reliability target setting method and but showing the limitations to consider the views of engineering, business and customer together. There is no research how to handle the target setting process in detail. Result : We develop the optimized method and systematic process in reliability target setting with considering such views. This research also establish the new concept as production capability which means company (or supplier) capability to product its products. Conclusion : In this research result, we apply the new method to a few projects and can set the reasonable test planning. The developing results is showing the good balance between the developing cost and warranty cost at market.