• 제목/요약/키워드: WBS (Work Breakdown Structure)

검색결과 96건 처리시간 0.026초

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • 방사성폐기물학회지
    • /
    • 제20권4호
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

4D-CAD시스템의 공사정보관리 효율화방안 (Improved Methodology of Construction Information Management in 4D CAD System)

  • 강인석;김창학;지상복;한주아
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.1132-1135
    • /
    • 2004
  • Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

  • PDF

중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석 (Risk Analysis in Tender Stage for Successful Construction Project in China)

  • 유월비;오재훈;허영기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.140-141
    • /
    • 2015
  • Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Four important risks are identified from series of surveys using the WBS-RBS method, the result shows that the main risk of tender stage is 'Tender max price error', ' Bill of quantities error', 'Unusual low price' and 'Moral risk' respectively.

  • PDF

우주발사 시스템 개발을 위한 통합 기술관리 시스템 소개 (Introduction of Program Life-Cycle Management System for Space Launch System Development)

  • 조미옥;조철훈;이준호;오범석;박정주;조광래
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.86-89
    • /
    • 2004
  • A web-based program life-cycle management(PLM) system is introduced to implement the system engineering processes and to provide the development teaceability online. This information system aims for the realization of essential system engineering management techniques currently applied to the space launch system development program including management of configuration and data based on the work breakdown structure(WBS), WBS, bill of materials and properties. The system enhances communication and gives access to the development data with relevant information such as data-to-data relation and approval status/history through the web, and preserve all of the development data throughout the program life-cycle. Further improvement of the system is planned to implement the program managrment pricesses and to provide integrated information useful for the programmatic decision making.

  • PDF

시스템개발에서의 기술적성과측정 파라미터 선정 방법 - 국방 R&D 사업 중심으로 - (Technical Parameter Selection Method of the System Development - Focusing on the Military R&D Project -)

  • 유이주;김진훈;박영원
    • 시스템엔지니어링학술지
    • /
    • 제5권1호
    • /
    • pp.49-56
    • /
    • 2009
  • This research attempts to acquire technical performance measure information based on identifying the Critical To Quality(CTQ) parameters of user requirement by using Quality Function Deployment(QFD) methodology in the initial phase of a defense R&D project. This results will contribute to the integration of technical progress to the Work Breakdown Structure(WBS) based project performance tracking. It also improve the bridging of systems engineering activities to the project management and the project decision making process.

  • PDF

경량전철사업의 시스템엔지니어링활동을 위한 상세일정계획 작성방법 연구 (A Study on the Systems Engineering Detailed Schedule for LRT Project)

  • 한석윤;김주욱;최요철;강도훈
    • 시스템엔지니어링학술지
    • /
    • 제8권2호
    • /
    • pp.11-17
    • /
    • 2012
  • Suppliers in light rail transit project makes a systems engineering management plan(SEMP) as a top level plan which has a SEMS and SEDS as an control and monitoring means. In this paper, we analyze the international standards and some related documents, and present the directions to make the SEMS and SEDS which have WBS, accomplishments, schedule, events, person in charge. And then customize the project management tool and make SEMS and SEDS of LRT project as an example. The research results can be applied in LRT project after tailoring based on the project.

우주 발사 시스템 개발을 위한 통합 기술관리 시스템 소개 (Introduction of Program Life-Cycle Management System for Space Launch System Development)

  • 조미옥;신명호
    • 시스템엔지니어링학술지
    • /
    • 제2권1호
    • /
    • pp.48-53
    • /
    • 2006
  • A web-based program life-cycle management(PLM) system is introduced to implement the system engineering processes and to provide the development traceability online. This information system aims for the realization of essential system engineering management techniques currently applied to the space launch system development program including management of configuration and data based on the work breakdown structure(WBS), WBS, bill of materials and mass properties. The system enhances communication and gives access to the development data with relevant information such as data-to-data relation and approval status/history through the web, and preserve all of the development data throughout the program life-cycle. Further improvement of the system is planned to implement the program management processes and co provide integrated information useful for the programmatic decision making.

  • PDF

조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석 (Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions)

  • 김유진;이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

극한지 자원이송망 EPC단계에서 발생되는 데이터 항목에 관한 기초연구 (A Fundamental Study on Data Item occurred in EPC Stage of Pipeline in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.18-19
    • /
    • 2014
  • As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.

  • PDF

교전수준 어뢰체계 표준모델 개발 방안 연구 (On the Development of Authoritative Representations of Torpedo Systems for Engagement Level Simulation)

  • 신지환
    • 한국시뮬레이션학회논문지
    • /
    • 제16권3호
    • /
    • pp.19-28
    • /
    • 2007
  • 무기체계의 개념설계 단계에서부터 체계 사양 도출 및 관 요구분석의 효과적인 수행을 위한 교전수준(Engagement Level)의 M&S(Modeling & Simulation) 적용을 위해 수중무기체계인 어뢰체계의 표준모델을 구성하였다. 추후 수중 교전 시뮬레이션에 공통적으로 사용될 수 있도록 재사용성(Reusability)과 상호운용성(Interoperability) 및 공학 모델로의 확장성을 고려하였다. 어뢰체계의 표준에 대하여 모델의 WBS(Work Breakdown Structure)를 정의하고 각 하부 모델들 사이의 정보 흐름을 구체화하여 모델간의 입력 및 출력 파라미터를 정의하였다. 어뢰 모델링은 WBS의 하부 모델 중에서 초기입력 장치, 수중운동, 전투탄두, 음향탐지, 유도제어, 추진동력에 대해서 모델링 하였으며, 중어뢰와 경어뢰의 운용상의 차이점을 구분하여 모델링하였다. 표준모델은 가능한 공학 수준 M&S와 동일한 구조를 갖도록 하였으며 앞으로 정립될 V&V(Verification & Validation) 절차에 따라 교전 시뮬레이션에 사용될 다른 체계들과 검증될 것이다.

  • PDF