• Title/Summary/Keyword: Verification of equipment

Search Result 519, Processing Time 0.03 seconds

PRIDE 3D Simulator for Virtual Verification of Remote Handling Procedures in Processing Cell (PRIDE 3D 시뮬레이터를 통한 공정셀 내부의 원격작업 가상검증)

  • Ryu, Dongseok;Han, Jonghui;Kim, Sunghyun;Kim, Kiho;Lee, Jong Kwang
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.15 no.4
    • /
    • pp.333-341
    • /
    • 2017
  • The Korea Atomic Energy Research Institute (KAERI) constructed the PyRoprocessing Integrated inactive Demonstration facility (PRIDE) to carry out experiments on engineering scale pyroprocessing. PRIDE has a large processing cell that human workers are not allowed to access, and thus the equipment inside is operated from outside using remote handling systems. It is therefore essential to examine the operability and maintainability of the equipment in view of remote handling systems, and the equipment is thoroughly examined in a mockup cell before it is installed in the processing cell. If the equipment is tested in a virtual mockup rather than in a mockup cell, the development cost can be significantly reduced. The PRIDE 3D simulator was integrated for virtual verification of equipment that will be installed in the processing cell. All remote handling devices in the actual PRIDE were also virtually installed in the PRIDE 3D simulator. The 3D model of the equipment was loaded and located in the exact position in the virtual processing cell. A scenario to replace an actual electrode was implemented in the PRIDE 3D simulator. The design of the equipment and the working procedures in the scenario were successfully evaluated. The results demonstrated that the PRIDE 3D simulator can be used successfully as an alternative to actual mockup testing.

Development of KOMPSAT-2 Vehicle Dynamic Simulator for Attitude Control Subsystem Functional Verification

  • Suk, Byong-Suk;Lyou, Joon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1465-1469
    • /
    • 2003
  • In general satellite verification process, the AOCS (Attitude & Orbit Control Subsystem) should be verified through several kinds of verification test which can be divided into two major category like FBT (Fixed Bed Test) and polarity test. And each test performed in different levels such as ETB (Electrical Test Bed) and satellite level. The test method of FBT is to simulate satellite dynamics with sensors and actuators supported by necessary environmental models in ETB level. The VDS (Vehicle Dynamic Simulator) try to make the real situation as possible as the on-board processor will undergo after launch. The purpose of FBT test is to verify that attitude control logic function and hardware interface is designed as expected with closed loop simulation. The VDS is one of major equipments for performing FBT and consists of software and hardware parts. The VDS operates in VME environments with target board, several commercial boards and custom boards based on the VxWorks real time operating system. In order to make time synchronization between VDS and satellite on-board processor, high reliable semaphore was implemented to make synchronization with the interrupt signal from on-board processor. In this paper, the real-time operating environment used on VDS equipment is introduced, and the hardware and software configurations of VDS summarized in the systematic point of view. Also, we try to figure out the operational concept of VDS and AOCS verification test method with close-loop simulation.

  • PDF

A Study on the Verification of Integrity of Message Structure in Naval Combat Management System

  • Jung, Yong-Gyu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.27 no.12
    • /
    • pp.209-217
    • /
    • 2022
  • Naval CMS(Combat Management System) is linked to various sensors and weapon equipment and use DDS(Data Distribution Service) for efficient data communication between ICU(Interface Control Unit) Node and IPN(Information Processing Node). In order to use DDS, software in the system communicates in an PUB/SUB(Publication/Subscribe) based on DDS topic. If the DDS messages structure in this PUB/SUB method does not match, problems such as incorrect command processing and wrong information delivery occur in sending and receiving application software. To improve this, this paper proposes a DDS message structure integrity verification method. To improve this, this paper proposes a DDS message structure integrity verification method using a hash tree. To verify the applicability of the proposed method to Naval CMS, the message integrity verification rate of the proposed method was measured, and the integrity verification method was applied to CMS and the initialization time of the existing combat management system was compared and the hash tree generation time of the message structures was measured to understand the effect on the operation and development process of CMS. Through this test, It was confirmed that the message structure verification method for system stability proposed in this paper can be applied to the Naval CMS.

Proposing a low-frequency radiated magnetic field susceptibility (RS101) test exemption criterion for NPPs

  • Min, Moon-Gi;Lee, Jae-Ki;Lee, Kwang-Hyun;Lee, Dongil
    • Nuclear Engineering and Technology
    • /
    • v.51 no.4
    • /
    • pp.1032-1036
    • /
    • 2019
  • When the equipment which is related to safety or important to power production is installed in nuclear power plant units (NPPs), verification of equipment Electromagnetic Susceptibility (EMS) must be performed. The low-frequency radiated magnetic field susceptibility (RS101) test is one of the EMS tests specified in U.S NRC (Nuclear Regulatory Commission) Regulatory Guide (RG) 1.180 revision 1. The RS101 test verifies the ability of equipment installed in close proximity to sources of large radiated magnetic fields to withstand them. However, RG 1.180 revision 1 allows for an exemption of the low-frequency radiated magnetic susceptibility (RS101) test if the safety-related equipment will not be installed in areas with strong sources of magnetic fields. There is no specific exemption criterion in RG 1.180 revision 1. EPRI TR-102323 revision 4 specifically provides a guide that the low-frequency radiated magnetic field susceptibility (RS101) test can be conservatively exempted for equipment installed at least 1 m away from the sources of large magnetic fields (>300 A/m). But there is no exemption criterion for equipment installed within 1 m of the sources of smaller magnetic fields (<300 A/m). Since some types of equipment radiating magnetic flux are often installed near safety related equipment in an electrical equipment room (EER) and main control room (MCR), the RS101 test exemption criterion needs to be reasonably defined for the cases of installation within 1 m. There is also insufficient data regarding the strength of magnetic fields that can be used in NPPs. In order to ensure confidence in the RS101 test exemption criterion, we measured the strength of low-frequency radiated magnetic fields by distance. This study is expected to provide an insight into the RS101 test exemption criterion that meets the RG 1.180 revision 1. It also provides a margin analysis that can be used to mitigate the influence of low-frequency radiated magnetic field sources in NPPs.

Presentation of Performance Test Criteria for Denuclearization Verification Equipment Considering North Korea Environment (북한 환경을 고려한 비핵화 검증 장비의 성능 시험 기준 제시)

  • Ji-Young, Han;Su-Hui, Park;Yong-Min, Kim
    • Journal of the Korean Society of Radiology
    • /
    • v.17 no.1
    • /
    • pp.71-77
    • /
    • 2023
  • The issue of North Korea's denuclearization is an global issue that transcends the North and South. It is necessary to prepare for the denuclearization process in preparation for the situation in which North Korea reveals its intention to denuclearize. In the process of North Korea's denuclearization, it is required to guarantee the normal operation of the denuclearization verification equipment. If a performance test criteria that takes into account the North Korean environment is established, it is highly likely that it will be used in the future denuclearization process. For this purpose, basic materials related to performance test standards were established through analysis of test standards such as international standards. After that, we established a performance test criteria. This includes high temperature, low temperature, humidity, vibration and shock tests. Through follow-up studies, validity of test criteria will be established through actual device testing.

A Study on Improvement of Safety Management of Low Voltage Electrical Equiment (일반용 저압전기설비의 안전등급제 도입에 관한 연구)

  • Jae-Phil Han;Yong-Sung Choi
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.36 no.6
    • /
    • pp.598-602
    • /
    • 2023
  • With the purpose of instilling an awareness of the safety of users of electrical equipment and inducing voluntary facility improvement through the safety rating system for general low voltage electrical equipment, simulation and field application of the safety rating of general low voltage electrical equipment were conducted. For the introduction and application of the safety rating system for general low-voltage electrical equipment, data related to domestic safety was investigated and analyzed, cases of introduction in other fields were reviewed, and for design, the 4M risk assessment method of the Korea Occupational Safety and Health Agency and the cases of safety index development in Korea were analyzed and standardized. Safety rating system simulations were conducted for general low-voltage electrical equipment, and problem improvement measures were prepared by analyzing the results through on-site verification and simulation applied to the initial design. Design standards for the introduction of the safety rating system for general low-voltage electrical equipment were prepared, and 394 youth training facilities were applied to the field to see if the design standards were practically applicable to the field. With the application of the safety rating system for low-voltage electrical equipment for general use, youth training facilities that had been classified as 'appropriate' were able to induce an upgrade to a higher level through voluntary facility improvement according to the application of grades (A to E). As a result of inducing voluntary repair projects based on the results of the 1st and 2nd inspection of youth training facilities, it was confirmed that 86 facilities received grade A, 225 facilities received grade B, and only 311 facilities received grade A to B out of a total of 394 facilities, and there was no grade E.

Measures for Improvement of RAM Target Value Setting Methods for Submarine Weapon Systems (잠수함 무기체계 RAM 목표 값 설정 방식의 개선방안)

  • Jung, Sun-uk;Shim, Hang-geun;Choi, Myoung-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.419-427
    • /
    • 2020
  • In the case of large combined weapon systems, such as submarines, the application, and verification of methods of setting the reliability, availability, and maintainability (RAM) target values for conventional weapon systems are limited. Submarines are complex weapon systems with the characteristics of the diversity of operation mode summary and mission profiles (OMS/MP) as well as equipment complexity because they are composed of multiple weapon systems, such as sonar systems and armed systems. Therefore, this study analyzed the development cases of existing weapon systems, i.e., the RAM target value-setting cases, and derived the problems and limitations of the cases to present measures to improve the setting and verification of the ram target values of submarines. In addition, submarines operate around the world and have different operating and maintenance conditions. Therefore, a submarine's ram target values should be set and verified centering on the mission essential equipment and mission critical equipment, instead of all components that constitute weapon systems. This study examined a method to verify the required performance RAM target-value setting, considering the characteristics of submarines as well as the physical performance requirements for the systems and equipment of submarines that must be considered when implementing national defense acquisition projects for submarines.

Development and Verification of Lightning Induced Transient Protection Device for Avionics Computer (항공기 탑재 컴퓨터용 간접낙뢰 보호장치 개발 및 검증)

  • Sim, Yong-gi;Ahn, Tae-sik;Park, Jun-hyun;Han, Jong-pyo;Yang, Seo-hee
    • Journal of Advanced Navigation Technology
    • /
    • v.19 no.5
    • /
    • pp.395-402
    • /
    • 2015
  • This paper introduces the design details and test procedures of the lightning induced transient protection device for protecting the damage caused by indirect lightning strike on the computer mounted on the aircraft. Lightning induced surge voltage is bring a malfunction or damage to the aircraft electrical and electronic equipment, that is referred to indirect effects of lightning. In order to protect the electronic equipment on aircraft from the indirect effects of lightning, that is achieved by analyzing the effect on aircraft from lightning and protect design for each devices. In this paper, we introduce an indirect lightning strike level decisions, the protection circuit design method according to the chosen level through the RTCA DO-160G Section 22 category analysis and selection was performed in order to protect the damage caused by indirect lightning strikes in the protected equipment. In addition, we show the indirect lightning effects verification test performed to validate the designed protection circuits.

Performance Verification and Reliability Test of Tunnel Shotcrete Stressmeter (터널 숏크리트 응력계의 성능검증과 신뢰성 시험 연구)

  • Kim, Yeong-Bae;Park, Yeong-Bae;Lee, Seong-Won;Lee, Kang-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.4
    • /
    • pp.113-126
    • /
    • 2024
  • Shotcrete lining is an important material for the stability of tunnels in NATM tunnels. However, stressmeters for stress measurements of shotcrete lining are installed in the field without performance verification because of a lack of research on methods, procedures, regulations, and reliability of measurement equipment. To solve this problem, all shotcrete stressmeters currently used in Korea were investigated. For each stressmeter, external inspection and structural and functional inspection were performed to identify defects and problems in devices. For this purpose, a shotcrete stressmeter performance test device capable of load loading in stages was developed and obtained KOLAS certification. Using the device, stressmeter performance tests were conducted. Structural problems of integrated- and cell-type shotcrete stressmeters were identified through concrete mold tests, and improvement plans and performance verification procedures were suggested. The results of this study are expected to contribute to the preparation of regulations for the performance verification of shotcrete stressmeters and the selection of measuring instruments in the field in the future.

Verification of failover effects from distributed control system communication networks in digitalized nuclear power plants

  • Min, Moon-Gi;Lee, Jae-Ki;Lee, Kwang-Hyun;Lee, Dongil;Lim, Hee-Taek
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.989-995
    • /
    • 2017
  • Distributed Control System (DCS) communication networks, which use Fast Ethernet with redundant networks for the transmission of information, have been installed in digitalized nuclear power plants. Normally, failover tests are performed to verify the reliability of redundant networks during design and manufacturing phases; however, systematic integrity tests of DCS networks cannot be fully performed during these phases because all relevant equipment is not installed completely during these two phases. In additions, practical verification tests are insufficient, and there is a need to test the actual failover function of DCS redundant networks in the target environment. The purpose of this study is to verify that the failover functions works correctly in certain abnormal conditions during installation and commissioning phase and identify the influence of network failover on the entire DCS. To quantify the effects of network failover in the DCS, the packets (Protocol Data Units) must be collected and resource usage of the system has to be monitored and analyzed. This study introduces the use of a new methodology for verification of DCS network failover during the installation and commissioning phases. This study is expected to provide insight into verification methodology and the failover effects from DCS redundant networks. It also provides test results of network performance from DCS network failover in digitalized domestic nuclear power plants (NPPs).