• Title/Summary/Keyword: Variable Cost

Search Result 1,157, Processing Time 0.028 seconds

Development of Profile Design Method Based on Longitudinal Strain for Flexible Roll Forming Process (가변 롤 성형 공정시 길이방향 변형률에 근거한 제품 형상 설계 기술 개발)

  • Joo, B.D.;Han, S.W.;Shin, S.G.R.;Moon, Y.H.
    • Transactions of Materials Processing
    • /
    • v.22 no.7
    • /
    • pp.401-406
    • /
    • 2013
  • The use of roll-formed products increases every year due to its advantages, such as high production rates, reduced tooling cost and improved quality. However, till now, it is limited to part profiles with constant cross section. In recent years, the flexible roll forming process, which allows variable cross sections of profiles by adaptive roll stands, was developed. In this study, an attempt to optimize profile design for the flexible roll forming process was performed. An equation that predicts the longitudinal strain for part geometries with variable cross-sections was proposed. The relationship between geometrical parameters and the longitudinal strain was analyzed and investigations on the optimal profile design were performed. Experiments were conducted with a lab-scale roll forming machine to validate the proposed equation. The results show that the profile design method proposed in this study is feasible and parts with variable cross sections can be successfully fabricated with the flexible roll forming process.

Experimental Assessment with Wind Turbine Emulator of Variable-Speed Wind Power Generation System using Boost Chopper Circuit of Permanent Magnet Synchronous Generator

  • Tammaruckwattana, Sirichai;Ohyama, Kazuhiro;Yue, Chenxin
    • Journal of Power Electronics
    • /
    • v.15 no.1
    • /
    • pp.246-255
    • /
    • 2015
  • This paper presents experimental results and its assessment of a variable-speed wind power generation system (VSWPGS) using permanent magnet synchronous generator (PMSG) and boost chopper circuit (BCC). Experimental results are obtained by a test bench with a wind turbine emulator (WTE). WTE reproduces the behaviors of a windmill by using servo motor drives. The mechanical torque references to drive the servo motor are calculated from the windmill wing profile, wind velocity, and windmill rotational speed. VSWPGS using PMSG and BCC has three speed control modes for the level of wind velocity to control the rotational speed of the wind turbine. The control mode for low wind velocity regulates an armature current of generator with BCC. The control mode for middle wind velocity regulates a DC link voltage with a vector-controlled inverter. The control mode for high wind velocity regulates a pitch angle of the wind turbine with a pitch angle control system. The hybrid of three control modes extends the variable-speed range. BCC simplifies the maintenance of VSWPGS while improving reliability. In addition, VSWPGS using PMSG and BCC saves cost compared with VSWPGS using a PWM converter.

Cost Driver Analysis in General Hospitals Using Simultaneous Equation Model and Path Model (연립방정식모형과 경로모형을 이용한 종합병원의 원가동인 분석)

  • 양동현;이원식
    • Health Policy and Management
    • /
    • v.14 no.1
    • /
    • pp.89-120
    • /
    • 2004
  • The purpose of this empirical study is to test hypotheses in order to identify the cost drivers that drive indirect costs in general hospitals in Korea. In various cases' studies, it has been suggested that overhead costs are driven by volume and complexity variables, how they are structurally related and how the cost impacts of these variables can be A unique feature of the research is the treatment of complexity as an endogenous variable. It is hypothesized that level of hospital complexity in terms of the number of services provided(i.e., “breath" complexity) and the intensity of individual estimated in practice. overhead services(ie., “depth" complexity) are simultaneous determined with the level of costs needed to support the complexity. Data used in this study were obtained from the Database of Korean Health Industry Development Institute, Health Insurance Review Agency and analyzed using simultaneous equation model, path model. The results found those volume and complexity variables are all statistically signi-ficance drivers of general hospital overhead costs. This study has documented that the level of service complexity is a significant determinant of hospital overhead costs, caution should be exercised in interpreting this as supportive of the cost accounting procedures associated with ABC. with ABC.

Optimal Operation Scheme and Reliability Index Improvement of Micro Grid Using Energy Storage Systems (에너지 저장장치를 이용한 마이크로 그리드의 최적운영 및 신뢰도 지수 개선)

  • Kim, Kyu-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.2
    • /
    • pp.205-210
    • /
    • 2014
  • The micro grid considered in this paper consists of a diesel generator, a photovoltaic array, a wind turbine, a fuel cell, and a energy storage system. This paper explains and simulates the micro grid components in terms of accuracy and efficiency of having a system model based on the costs of fuel as well as operation and maintenance. For operational efficiency, the objective function in a diesel generator consists of the fuel cost function similar to the cost functions used for the conventional fossil-fuel generating plants. The wind turbine generator is modeled by the characteristics of variable output. The optimization is aimed at minimizing the cost function of the system while constraining it to meet the customer demand and safety of micro grid. The operating cost in fuel-cell system includes the fuel costs and the efficiency for fuel to generate electric power. To develop the overall system model gives a possibility to minimize of the total cost of micro grid. The application of optimal operation can save the interruption costs as well as the operating costs, and improve reliability index in micro grid.

An Empirical Study on Contract Model for IT Outsourcing Application Operation (IT 아웃소싱 어플리케이션 운영 계약모델에 대한 실증적 연구)

  • Kim, Heungshik;Park, Soah
    • Journal of Information Technology Services
    • /
    • v.16 no.2
    • /
    • pp.45-60
    • /
    • 2017
  • The study suggests a contract model of application operation through case study of A bank's IT outsourcing application contract based on workload. The IT outsourcing order form has a problem in that the scope of work is ambiguous due to the integration of operation and maintenance. In this study, application operation and maintenance were separated by referring to application operation history provided in ISO/IEC15504-5 standard. The scope of the IT outsourcing service was clarified by organizing the definition and detail activities of the application operation business. Application operation contract method has generally applied estimation method by the number of input manpower and period by agreement between buyer and client. As there is no activity to calculate the number of input manpower based on the operational work history and based on the standard workload per activity. In this case is not guaranteed due to the simple agreement between the contractors. In this paper, we propose an application operating cost estimation model that measures the size of the operating software using function point analysis that is the basis of application operation tasks. In order to verify the validity of the application operation cost model, we verified the correlation between the application size and the labor cost through regression analysis using SPSS.

Study on the Medical Cost of Patients Visited by Referral Center: Focusing on the Patient in Gastroenterology (진료의뢰센터 경유환자의 진료비 영향요인에 관한 연구: 소화기내과 환자를 중심으로)

  • Choi, Young-Doo;Lee, Kwang-Soo;Hong, Sang-Jin
    • The Korean Journal of Health Service Management
    • /
    • v.6 no.2
    • /
    • pp.101-109
    • /
    • 2012
  • This study purposed to analyze the differences of cost, length of stay, and number of visits between patients who referred from clinics to a general hospital and patients who directly visit a general hospital. Study sample included 402 patients (177 patients who were not referred from clinics, 225 patients who referred from clinics) who visited the Dept. of Gastroenterology in a university hospital in Daejeon from January to June in 2007. Cost and patients' information were collected from Hospital Information System and medical record. SPSS v.12.0 was used for the statistical analysis. Multiple regression analysis found that for inpatients, location variables and malignant tumors of digestive organs had a significant influence on cost variable. For outpatients, a referring hospital type and visiting month had significant influences on total cost, and sex and visiting month (February) had significant relationship with number of visit. The study results help to understand the differences of patient care depending on whether they were referred from clinics or not. Hospital managements could use the results for marketing purposes, and it could provide valuable information for increasing the competitiveness of hospital in a given market.

A Study for Defense Acquisition System Improvement (국방무기체계 획득절차 발전방향 - 미국 국방획득절차 개선노력을 중심으로 -)

  • Go, Sim-Jae
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.86-104
    • /
    • 2005
  • During the 'Cold War', DoD had focused on the high performance and timely acquisition which enabled quick field out the superior weapons than the enemy regardless of acquisition cost. But, after the cold war, the focus has been changed to the 'cost effective acquisition' of weapon systems because of tremendous investment cost & economic theory. The U.S. DoD has been tried to make 'the most effective acquisition system'(AR, Acquisition Reform) from mid-80's with their enough experienced program data, and as a result, they had launched the new acquisition procedure - DoD 5000 series - in 1996. DoD is continuously doing the study and making several improvements on the procedure after it had been once announced. On Oct 30. 2002, DoD noticed that they cancelled the DoD 5000 series documents(5000.1, 5000.2, 5000.2-R) and 5000.2-R will be reissued as a guide. The most recent version which focused on 1) evolutionary acquisition and spiral development, 2) procedure for future technology systems including software and IT, 3) supplement on the area of efficiency, flexibility, creativity and innovation of old system was issued by May 12. 2003. This article suggests a 'good idea' based on the reviewing of these DoD efforts for our defense acquisition regulation and procedure to go. It includes the CAIV concept application, IPT utilization, T&E method, cost or price based contract etc-all for the effective acquisition.

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

Fixed Charge Transportation Problem and Its Uncertain Programming Model

  • Sheng, Yuhong;Yao, Kai
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.2
    • /
    • pp.183-187
    • /
    • 2012
  • In this paper, we study the fixed charge transportation problem with uncertain variables. The fixed charge transportation problem has two kinds of costs: direct cost and fixed charge. The direct cost is the cost associated with each source-destination pair, and the fixed charge occurs when the transportation activity takes place in the corresponding source-destination pair. The uncertain fixed charge transportation problem is modeled on the basis of uncertainty theory. According to inverse uncertainty distribution, the model can be transformed into a deterministic form. Finally, in order to solve the uncertain fixed charge transportation problem, a numerical example is given to show the application of the model and algorithm.

A method for optimal express train stop scheduling using station OD data (역간 OD자료를 활용한 급행열차 최적 정차역 결정 방법론)

  • Kwon, O-Hyeon;Kim, Myeong-Hyeon;Rhee, Sung-Mo;Chon, Kyong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1810-1815
    • /
    • 2011
  • Although the effectiveness of an express train's service is measured in "Total System Time or Cost" units, many cases had used indirect method what based on the distintion by number of passengers in a station or experiential knowledgements. These methods are not guarantee itself as an optimal strategy. Focusing "Total System Time or Cost" directly, this paper investigates the express train service's stop scheduling based on each OD-volume and trip time which mainly affect system time and cost. To do this, we built an IP model which has a binary set presenting express train's stop scheduling as decision variable and suggest a Genetic Algorithm (GA) to find heuristic optimal solution.

  • PDF