• Title/Summary/Keyword: Value Stream Mapping

Search Result 17, Processing Time 0.023 seconds

Feasibility Study in Construction Materials using Value Stream Analysis - Focused on Mechanical Works - (가치흐름분석을 통한 건설자재의 공장화생산 타당성 검토 - 건축공사의 기계설비 공사를 중심으로 -)

  • Seo Chang-Yong;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.389-392
    • /
    • 2002
  • Local Mechanical work is researched which spending unnecessary labors and time due to unnecessary material accumulation and fabricated on site. Accordingly, this study analyzes the work process of mechanical equipments by Lean Production principles. Value Stream Analysis(VSA) uncovers waste factor of the existing method and manufactory production method using Value Stream Mapping(VSM). In the results, this study presents improvement of the existing method problems and negative factors of manufactory production.

  • PDF

Design and Operation of Value Stream Mapping (VSM 설계와 운영방안)

  • Choi, Sung-Woon;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.149-157
    • /
    • 2006
  • This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)

Waste Elimination in Construction Process using Value Stream Analysis - Focused on Waste Elimination of Re-bar Works (가치흐름 분석을 통한 건설프로세스의 낭비제거 방안)

  • Mun Jeong-Mun;Kim Chang-Duk;Park Dong-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.416-421
    • /
    • 2001
  • The domestic reinforcement concrete works have mainly worked the process of re-bar fabrication/assembly on site and re-bar works affected by structural safety, durability, and schedule with form work. Accordingly, This study analyzes the process of re-bar fabrication/assembly on site to apply lean production principles to construction Value Stream Analysis(VSA) is analyzed into value-adding activity and non-value-adding activity on construction process through value analysis and Value Stream Mapping(VSM). In the results, non-value-adding activity generates waste such as the activity steps, labors, equipments, materials, time, and so on. Additionally, push-driven production is investigated making low productivity from the overproduction and so on. To resolve the problems in the process, The purpose of this paper eliminates waste factor through maximizing the value-adding activity generating value added and minimizing non-value adding activity. Particularly, it makes flow production and pull-driven production through minimizing work-in-process(WIP ).

  • PDF

A Guideline for Implementing Lean Six Sigma for Management Innovation (경영혁신을 위한 린 6시그마의 적용 방안)

  • Choi, Moon-Bak
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.4
    • /
    • pp.298-313
    • /
    • 2006
  • Six sigma is focused on quality improvement through variation reduction, while lean is on process flow improvement and lead time reduction by waste elimination. However, lean cannot bring a process under statistical control and six sigma alone cannot dramatically improve process speed. Lean six sigma was developed to achieve faster rate of improvement in customer satisfaction, cost, quality, process speed, and invested capital. In this paper we present the importance of using value stream mapping and suggest a guideline on how to integrate lean and six sigma by is proposed.

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

A Process Improvement in Building Constructions using Value Stream Analysis - Focused on slab works - (가치흐름 분석을 통한 건설공사의 공정개선방안 - 슬래브 공사를 중심으로 -)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.527-530
    • /
    • 2002
  • The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.

  • PDF

Optimization of Agri-Food Supply Chain in a Sustainable Way Using Simulation Modeling

  • Vostriakova, Viktorija;Kononova, Oleksandra;Kravchenko, Sergey;Ruzhytskyi, Andriy;Sereda, Nataliia
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.3
    • /
    • pp.245-256
    • /
    • 2021
  • Poor logistical infrastructure and agri-food supply chain management leads to significant food waste in logistic system. The concept of the sustainable value added agri-food chains requires defined approach to the analysis of the existing situation, possible improving strategies and also assessment of these changes impact on further development. The purpose of research is to provide scientific substantiation of theoretical and methodological principles and develop practical recommendations for the improvement of the agri-food logistics distribution system. A case study methodology is used in this article. The research framework is based on 4 steps: Value Stream Mapping (VSM), Gap and Process Analysis, Validation and Improvement Areas Definition and Imitation Modelling. This paper presents the appropriateness of LEAN logistics tools using, in particular, Value Stream Mapping (VSM) for minimizing logistic losses and Simulation Modeling of possible logistics distribution system improvement results. The algorithm of VSM analysis of the agri-food supply chain, which involves its optimization by implementing the principles of sustainable development at each stage, is proposed. The methodical approach to the analysis of possible ways for optimizing the operation of the logistics system of the agri-food distribution is developed. It involves the application of Value Stream Mapping, i.e. designing of stream maps of the creation of the added value in the agri-food supply chain for the current and future state based on the minimization of logistic losses. Simulation modeling of the investment project on time optimization in the agri-food supply chain and economic effect of proposed improvements in logistics product distribution system functioning at the level of the investigated agricultural enterprise has been determined. Improvement of logistics planning and coordination of operations in the supply chain and the innovative pre-cooling system proposed to be introduced have a 3-year payback period and almost 75-80% probability. Based on the conducted VSM analysis of losses in the agri-food supply chain, there have been determined the main points, where it is advisable to conduct optimization changes for the achievement of positive results and the significant economic effect from the proposed measures has been confirmed. In further studies, it is recommended to focus on identifying the synergistic effect of the agri-food supply chain optimization on the basis of sustainable development.

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.

The Blind Men and the Soft Drinks Industry in the United Arab Emirates

  • Annabi, Carrie Amani;Hassan, Fatima;Amer, Islam
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.10
    • /
    • pp.21-37
    • /
    • 2018
  • Purpose - This paper explores the contribution lean makes to service levels by addressing lean thinking application in logistics process improvement within a MNC soft drinks manufacturer situated in the United Arab Emirates, and identifies the most significant sources of wastes and their interdependence and highlights key attributes of successful lean implementation. Research design, data, and methodology - This case study examines key logistics employees' perceptions on lean methodology. Results - The results highlight the most significant types of wastes in logistical processes and illustrates ways to eliminate wastes and streamline process flow. The importance of the human role within lean methodology is also identified. Findings suggest that managers should follow both a micro and macro approach when implementing lean practices, as focusing on one waste often leads to ignoring the significance of other wastes. Conclusions - This study highlights the importance of implementing lean at both micro and macro levels and shows how staff involvement increases the efficacy of lean thinking. It offers guidance towards the efficiency of creating value stream mapping processes in situ, which considers different wastes and their interdependence. Managers with limited resources are encouraged to implement lean methodology taking cognizance of these factors.